E8-27843. Drawbridge Operation Regulations; Jamaica Bay, New York, NY, Maintenance  

  • Start Preamble

    AGENCY:

    Coast Guard, DHS.

    ACTION:

    Notice of temporary deviation from regulations.

    SUMMARY:

    The Commander, First Coast Guard District, has issued a temporary deviation from the regulation governing the operation of the Beach Channel Railroad Bridge at mile 6.7, across Jamaica Bay, at New York City, New York. Under this temporary deviation the Beach Channel Railroad Bridge may remain in the closed position for two weekends in December. This deviation is necessary to facilitate bridge track repairs.

    DATES:

    This deviation is effective from December 6, 2008 through December 14, 2008.

    ADDRESSES:

    Documents indicated in this preamble as being available in the docket are part of docket USCG-2008-1084 and are available online at http://www.regulations.gov. They are also available for inspection or copying at two locations: the Docket Management Facility (M-30), U.S. Department of Transportation, West Building Ground Floor, Room W12-140, 1200 New Jersey Avenue, SE., Washington, DC 20590, between 9 a.m. and 5 p.m., Monday through Friday, except Federal holidays, and the First Coast Guard District, Bridge Branch Office, 408 Atlantic Avenue, Boston, Massachusetts, 02110, between 7 a.m. and 3 p.m., Monday through Friday, except Federal holidays.

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    Judy Leung-Yee, Project Officer, First Coast Guard District, at (212) 668-7165.

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    The Beach Channel Railroad Bridge, across Jamaica Bay, mile 6.7, at New York, New York, has a vertical clearance in the closed position of 26 feet at mean high water and 31 feet at mean low water. The existing drawbridge operation regulations are listed at 33 CFR 117.5.

    The owner of the bridge, New York City Transit Authority, requested a temporary deviation to facilitate maintenance repairs to the bridge rails.

    Under this temporary deviation the Beach Channel Railroad Bridge need not open for the passage of vessel traffic on Saturday and Sunday between 6 a.m. and 9 p.m., on December 6, 7, 13, and 14, 2008.

    In accordance with 33 CFR 117.35(e), the bridge must return to its regular operating schedule immediately at the end of the designated time period. This deviation from the operating regulations is authorized under 33 CFR 117.35.

    Start Signature

    Dated: November 10, 2008.

    Gary Kassof,

    Bridge Program Manager, First Coast Guard District.

    End Signature End Supplemental Information

    [FR Doc. E8-27843 Filed 11-21-08; 8:45 am]

    BILLING CODE 4910-15-P

Document Information

Comments Received:
0 Comments
Effective Date:
12/6/2008
Published:
11/24/2008
Department:
Coast Guard
Entry Type:
Rule
Action:
Notice of temporary deviation from regulations.
Document Number:
E8-27843
Dates:
This deviation is effective from December 6, 2008 through December 14, 2008.
Pages:
70868-70868 (1 pages)
Docket Numbers:
USCG-2008-1084
PDF File:
e8-27843.pdf
CFR: (1)
33 CFR 117