94-29016. Colorado Interstate Gas Co.; Notice of Filing of Proposed Changes in FERC Gas Tariff  

  • [Federal Register Volume 59, Number 226 (Friday, November 25, 1994)]
    [Unknown Section]
    [Page 0]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 94-29016]
    
    
    [[Page Unknown]]
    
    [Federal Register: November 25, 1994]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    [Docket No. RP95-45-000]
    
     
    
    Colorado Interstate Gas Co.; Notice of Filing of Proposed Changes 
    in FERC Gas Tariff
    
    November 18, 1994.
        Take notice that on November 14, 1994, Colorado Interstate Gas 
    Company (CIG) tendered for filing as part of its FERC Gas Tariff, First 
    Revised Volume No. 1, the following revised Tariff sheets:
    
    First Revised Sheet No. 243
    Second Revised Sheet No. 254
    First Revised Sheet No. 259
    Original Sheet Nos. 260-268
    Second Revised Sheet No. 359
    
        CIG has requested these tariff sheets become effective December 14, 
    1994.
        CIG states it is proposing two changes to its tariff. First CIG is 
    addressing the circumstance where a Shipper has released capacity and 
    the Replacement Shipper utilizes a Secondary Point. CIG is clarifying 
    that it will bill the Original Shipper for all reservation charges 
    applicable at the Secondary Point(s) even if those charges are higher 
    than the Original Shipper is paying at the Primary Point(s). CIG states 
    it will bill the Replacement Shipper only the amount that such party 
    bid in order to acquire the capacity (through the capacity release 
    program) unless the Original Shipper requires payment or reimbursement 
    of reservation charges by the Replacement Shipper. CIG states this 
    change is being made in keeping with the holdings of the Commission in 
    ANR Pipeline Company, 66 FERC 61,340 (1994) and 68 FERC  61,009 
    (1994).
        Secondly, CIG is proposing to change the section of its tariff 
    concerning posting of affiliate discounts. CIG is proposing to post on 
    its electronic bulletin board its discounts to affiliates 24 hours 
    after the gas flows under the discounted transaction. CIG states that 
    this change is being made in keeping with the Commissions holding in 
    Order No. 566-A issued October 14, 1994.
        CIG states that copies of this filing have been served on CIG's 
    jurisdictional customers and public bodies.
        Any person desiring to be heard or to protest said filing should 
    file a motion to intervene or a protest with the Federal Energy 
    Regulatory Commission, 825 North Capitol Street, NE., Washington, DC 
    20426, in accordance with Sections 385.211 and 385.214 of the 
    Commission's Rules of Practice and Procedure (18 CFR 385.214 and 
    385.211). All such petitions or protests should be filed on or before 
    November 28, 1994. Protests will be considered by the Commission in 
    determining the appropriate action to be taken, but will not serve to 
    make protestants parties to the proceeding. Any person wishing to 
    become a party must file a motion to intervene. Copies of this filing 
    are on file with the Commission and are available for public inspection 
    in the Public Reference Room.
    Linwood A. Watson, Jr.,
    Acting Secretary.
    [FR Doc. 94-29016 Filed 11-2-94; 8:45 am]
    BILLING CODE 6717-01-M
    
    
    

Document Information

Published:
11/25/1994
Department:
Energy Department
Entry Type:
Uncategorized Document
Document Number:
94-29016
Pages:
0-0 (1 pages)
Docket Numbers:
Federal Register: November 25, 1994, Docket No. RP95-45-000