98-31437. Airworthiness Directives; General Electric Company CF6 Series Turbofan Engines  

  • [Federal Register Volume 63, Number 227 (Wednesday, November 25, 1998)]
    [Proposed Rules]
    [Pages 65136-65147]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 98-31437]
    
    
    =======================================================================
    -----------------------------------------------------------------------
    
    DEPARTMENT OF TRANSPORTATION
    
    Federal Aviation Administration
    
    14 CFR Part 39
    
    [Docket No. 95-ANE-39]
    RIN 2120-AA64
    
    
    Airworthiness Directives; General Electric Company CF6 Series 
    Turbofan Engines
    
    AGENCY: Federal Aviation Administration, DOT.
    
    ACTION: Notice of proposed rulemaking (NPRM).
    
    -----------------------------------------------------------------------
    
    SUMMARY: This document proposes the supersedure of an existing 
    airworthiness directive (AD), applicable to General Electric Company 
    (GE) CF6 series turbofan engines, that currently requires initial and 
    repetitive ultrasonic and eddy current inspections of high pressure 
    compressor rotor (HPCR) stage 3-9 spools for cracks. This action would 
    define more aggressive inspection intervals for certain HPCR stage 3-9 
    spools, add CF6-80E1 engines to the inspection program, add inspection 
    requirements for spools manufactured from 8 inch diameter billet, add a 
    one-time inspection of the stage 3-5 blade slot bottoms, and add a one-
    time inspection of the web and hub-to-web transition areas. This 
    proposal is prompted by analysis of recent HPCR stage 3-9 spool 
    inspection results and separations, and assessment of the adequacy of 
    the existing program to prevent HPCR stage 3-9 spool cracking and 
    separation. As a result of that assessment, the FAA has determined 
    there is a need to make changes to the existing AD. The actions 
    specified by the proposed AD are intended to prevent HPCR stage 3-9 
    spool cracking and separation, which can result in an uncontained 
    engine failure and aircraft damage.
    
    DATES: Comments must be received by January 25, 1999.
    
    ADDRESSES: Submit comments in triplicate to the Federal Aviation 
    Administration (FAA), New England Region, Office of the Regional 
    Counsel, Attention: Rules Docket No. 95-ANE-39, 12 New England 
    Executive Park, Burlington, MA 01803-5299. Comments may also be sent 
    via the Internet using the following address: ``engineprop@faa.dot.gov''. Comments sent via the Internet must contain 
    the docket number in the subject line. Comments may be inspected at 
    this location between 8:00 a.m. and 4:30 p.m., Monday through Friday, 
    except Federal holidays.
        The service information referenced in the proposed rule may be 
    obtained from General Electric Company via Lockheed Martin Technology 
    Services, 10525 Chester Road, Suite C, Cincinnati, Ohio 45215, 
    telephone (513) 672-8400, fax (513) 672-8422. This information may be 
    examined at the FAA, New England Region, Office of the Regional 
    Counsel, 12 New England Executive Park, Burlington, MA.
    
    FOR FURTHER INFORMATION CONTACT: William S. Ricci, Aerospace Engineer, 
    Engine Certification Office, FAA, Engine and Propeller Directorate, 12 
    New England Executive Park, Burlington, MA 01803-5299; telephone (781) 
    238-7742, fax (781) 238-7199.
    
    SUPPLEMENTARY INFORMATION:
    
    Comments Invited
    
        Interested persons are invited to participate in the making of the 
    proposed rule by submitting such written data, views, or arguments as 
    they may desire. Communications should identify the Rules Docket number 
    and be submitted in triplicate to the address specified above. All 
    communications received on or before the closing date for comments, 
    specified above, will be considered before taking action on the 
    proposed rule. The proposals contained in this notice may be changed in 
    light of the comments received.
        Comments are specifically invited on the overall regulatory, 
    economic, environmental, and energy aspects of the proposed rule. All 
    comments submitted will be available, both before and after the closing 
    date for comments, in the Rules Docket for examination by interested 
    persons. A report summarizing each FAA-public contact concerned with 
    the substance of this proposal will be filed in the Rules Docket.
        Commenters wishing the FAA to acknowledge receipt of their comments 
    submitted in response to this notice must submit a self-addressed, 
    stamped postcard on which the following statement is made: ``Comments 
    to Docket Number 95-ANE-39.'' The postcard will be date-stamped and 
    returned to the commenter.
    
    Availability of NPRMs
    
        Any person may obtain a copy of this NPRM by submitting a request 
    to the FAA, New England Region, Office of the Regional Counsel, 
    Attention: Rules Docket No. 95-ANE-39, 12 New
    
    [[Page 65137]]
    
    England Executive Park, Burlington, MA 01803-5299.
    
    Discussion
    
        On January 31, 1995, the Federal Aviation Administration (FAA) 
    issued airworthiness directive (AD) 95-03-01, Amendment 39-9138 (60 FR 
    8930, February 16, 1995), applicable to General Electric Company (GE) 
    CF6-45/-50/-80A series turbofan engines, to require initial and 
    repetitive ultrasonic and eddy current inspections of a certain 
    population of high pressure compressor rotor (HPCR) stage 3-9 spools 
    for cracks. That action was prompted by a finding of several cracked 
    parts in service.
        Since the issuance of AD 95-03-01, the FAA received a report of an 
    in-service uncontained failure of an HPCR stage 3-9 spool. The 
    investigation revealed that the uncontained failure was caused by a 
    crack that developed from the same metallurgical condition which 
    prompted AD 95-03-01. However, that spool was not part of the 
    population required to be inspected by AD 95-03-01. Further 
    investigation indicated that the scope of AD 95-03-01 had to be 
    expanded to include other HPCR stage 3-9 spools installed on GE CF6-45/
    -50/-80A engines, and also HPCR stage 3-9 spools installed on GE CF6-
    80C2 series engines, and that the inspection schedule for the spools 
    affected by AD 95-03-01 needed to be accelerated. The FAA issued AD 95-
    23-03, amendment 39-9423 on November 13, 1995 (60 FR 57803, November 
    21, 1995) that superseded AD 95-03-01 and incorporated these inspection 
    program changes and added a reporting requirement for operators to 
    advise the FAA of the results of the inspections.
        Since issuing AD 95-23-03, the FAA has analyzed the inspection 
    reports submitted in accordance with AD 95-23-03, the results of an 
    investigation of an uncontained failure caused by a crack that 
    developed from a hard alpha inclusion material defect in the hub-to-web 
    transition area of CF6-50 stage 6 disk, and the results of an 
    investigation of an uncontained failure caused by a crack that 
    developed in a CF6-80C2 stage 3 blade slot bottom. The stage 3-9 spool 
    is one of the major structural elements of the fourteen-stage axial 
    flow HPCR installed in the CF6 engine. The CF6 HPCR is manufactured 
    from Ti 6-2-4-2 titanium alloy. Since 1974 there have been 9 events 
    where CF6 stage 3-9 spools have failed due to cracking. All of these 
    events have resulted in the release of engine fragments, and a majority 
    have resulted in an uncontained engine failure. The root cause of the 
    cracking and separation events has been attributed to two failure 
    mechanisms. The first failure mechanism is crack initiation from hard 
    alpha inclusions. Hard alpha inclusions are hard brittle areas within 
    the material which can crack under service loads and propagate in 
    fatigue. The second failure mechanism is dwell time fatigue (DTF). DTF 
    is a crack initiation mode associated with certain creep resistant 
    titanium alloys under sustained loading (dwell) at temperatures below 
    400 degrees Fahrenheit that results in internal crack initiations at 
    flat facets. The facets are associated with groups or colonies of 
    primary alpha grains having a common alpha phase crystal orientation. 
    Crack initiation by both of these failure mechanisms can occur at 
    relatively low cyclic exposures and result in HPCR stage 3-9 failure. 
    Based on this analysis, the FAA has determined that the inspection 
    program required by AD 95-23-03 must be accelerated and expanded to 
    include spools manufactured from 8 inch diameter billets. This 
    condition, if not corrected, could result in HPCR stage 3-9 spool 
    cracking and separation, which can result in an uncontained engine 
    failure and aircraft damage.
        The FAA has reviewed and approved the technical contents of the 
    following GE Service Bulletins (SBs) and Alert Service Bulletins 
    (ASBs): CF6-50 SB No. 72-1108, Revision 1, dated July 29, 1996; CF6-80A 
    SB No. 72-678, Revision 1, dated July 29, 1996; CF6-80C2 SB No. 72-812, 
    Revision 1, dated January 30, 1998, CF6-80E1 ASB No. 72-A135, Original, 
    dated August 13, 1998, CF6-50 SB No. 72-1157, Original, dated June 10, 
    1998, CF6-80A SB No. 72-719, Revision 1, dated September 24, 1998, CF6-
    80C2 SB No. 72-934, Original, dated June 10, 1998, CF6-80E1 SB No. 72-
    137, Original, dated June 9, 1998, CF6-50 ASB No. 72-A1131, Revision 1, 
    dated March 12, 1998, CF6-80A ASB No. 72-A691, Revision 2, dated 
    September 23, 1998, CF6-80C2 ASB No. 72-A848, Revision 2, dated March 
    12, 1998, CF6-80E1 ASB No. 72-A126, Revision 1, dated March 31, 1998, 
    and Table 801 of GE CF6-50 Shop Manual GEK 50481, section 05-11-02 Time 
    Limits. These service documents describe procedures for eddy current 
    and ultrasonic inspections of HPCR stage 3-9 spools for cracks.
        Since an unsafe condition has been identified that is likely to 
    exist or develop on other products of this same type design, the 
    proposed AD would supersede AD 95-23-03 to define more aggressive 
    inspection intervals for certain HPCR stage 3-9 spools, add CF6-80E1 
    engines to the inspection program, add inspection requirements for 
    spools manufactured from 8 inch diameter billet, add a one-time 
    inspection of the stage 3-5 blade slot bottoms, and add a one-time 
    inspection of the web and hub-to-web transition areas. The proposed 
    inspection program would also incorporated repetitive inspection 
    intervals that change based on the calendar time that has elapsed since 
    the effective date of this proposed AD. These calendar date triggers 
    have the effect of tightening the repetitive inspection intervals as 
    the affected population of engines ages through normal utilization. The 
    dates also reflect the risk analysis performed by the manufacturer 
    which took into consideration many factors including the shop capacity 
    to perform the required inspections. The FAA chose to use calendar 
    dates for these triggers rather than engine cycles or hours in order 
    not to unduly penalize high utilization users while providing some 
    definite ending point for each phase of the repetitive inspection 
    program.
        The FAA is also considering additional rulemaking that would 
    require eddy current and ultrasonic inspections of the side fillet 
    radii of the stage 3-5 blade slot bottoms, the stage 6-9 blade slot 
    bottoms, and a module level inspection of the stage 3-5 bores.
        There are approximately 4,506 engines of the affected design in the 
    worldwide fleet. The FAA estimates that 1,197 engines installed on 
    aircraft of U.S. registry would be affected by this proposed AD, that 
    it would take approximately 216 work hours per engine to accomplish the 
    proposed actions, and that the average labor rate is $60 per work hour. 
    Based on these figures, the total cost impact of the proposed AD on 
    U.S. operators is estimated to be $15,485,340.
        The regulations proposed herein would not have substantial direct 
    effects on the States, on the relationship between the national 
    government and the States, or on the distribution of power and 
    responsibilities among the various levels of government. Therefore, in 
    accordance with Executive Order 12612, it is determined that this 
    proposal would not have sufficient federalism implications to warrant 
    the preparation of a Federalism Assessment.
        For the reasons discussed above, I certify that this proposed 
    regulation (1) is not a ``significant regulatory action'' under 
    Executive Order 12866; (2) is not a ``significant rule'' under the DOT 
    Regulatory Policies and Procedures (44 FR 11034, February 26, 1979); 
    and (3) if promulgated, will not have a significant economic impact, 
    positive or negative, on a substantial number of small entities under 
    the criteria of the Regulatory
    
    [[Page 65138]]
    
    Flexibility Act. A copy of the draft regulatory evaluation prepared for 
    this action is contained in the Rules Docket. A copy of it may be 
    obtained by contacting the Rules Docket at the location provided under 
    the caption ADDRESSES.
    
    List of Subjects in 14 CFR Part 39
    
        Air transportation, Aircraft, Aviation safety, Safety.
    
    The Proposed Amendment
    
        Accordingly, pursuant to the authority delegated to me by the 
    Administrator, the Federal Aviation Administration proposes to amend 
    part 39 of the Federal Aviation Regulations (14 CFR part 39) as 
    follows:
    
    PART 39--AIRWORTHINESS DIRECTIVES
    
        1. The authority citation for part 39 continues to read as follows:
    
        Authority: 49 U.S.C. 106(g), 40113, 44701.
    
    
    Sec. 39.13  [Amended]
    
        2. Section 39.13 is amended by removing amendment 39-9423 (60 FR 
    57803, November 21, 1995) and by adding a new airworthiness directive 
    to read as follows:
    
    General Electric Company: Docket No. 95-ANE-39. Supersedes AD 95-23-
    03, Amendment 39-9423.
    
        Applicability: General Electric Company (GE) CF6-45, -50, -80A, 
    -80C2 and -80E1 series turbofan engines, with High Pressure 
    Compressor Rotor (HPCR) stage 3-9 spools, part numbers (P/Ns) 
    1333M66G01, 1333M66G03, 1333M66G07, 1333M66G09, 1333M66G10, 
    1669M22G01, 1781M52P01, 1781M53G01, 1782M22G01, 1782M22G02, 
    1782M22G04, 1854M95P01, 1854M95P02, 1854M95P03, 1854M95P04, 
    1854M96P05, 1854M95P06, 9136M89G02, 9136M89G03, 9136M89G06, 
    9187M89G07, 9136M89G08, 9136M89G09, 9136M89G10, 9136M89G11, 
    9136M89G17, 9136M89G18, 9136M89G19, 9136M89G20, 9136M89G21, 
    9136M89G22, 9136M89G27, 9136M89G28, 9136M89G29, 9253M85G01, 
    9253M85G02, 9273M14G01, 9331M29G01, and 9380M28P05 installed. These 
    engines are installed on but not limited to Airbus A300, A310, and 
    A330 series, Boeing 747 and 767 series, and McDonnell Douglas DC-10 
    and MD-11 series aircraft.
    
        Note 1: This airworthiness directive (AD) applies to each engine 
    identified in the preceding applicability provision, regardless of 
    whether it has been modified, altered, or repaired in the area 
    subject to the requirements of this AD. For engines that have been 
    modified, altered, or repaired so that the performance of the 
    requirements of this AD is affected, the owner/operator must request 
    approval for an alternative method of compliance in accordance with 
    paragraph (k) of this AD. The request should include an assessment 
    of the effect of the modification, alteration, or repair on the 
    unsafe condition addressed by this AD; and, if the unsafe condition 
    has not been eliminated, the request should include specific 
    proposed actions to address it.
    
        Compliance: Required as indicated, unless accomplished 
    previously.
        To prevent HPCR stage 3-9 spool cracking and separation, which 
    can result in an uncontained engine failure and aircraft damage, 
    accomplish the following:
        (a) For the purpose of this AD, the following abbreviations 
    apply:
        (1) Cycles Since New (CSN).
        (2) Cycles Since Last Inspection (CSLI).
        (3) Cycles At Last Inspection (CALI).
        (4) Engine Shop Visit (ESV).
    
        Note 2: Paragraph (b) of this AD is only applicable to GE CF6-
    45/50 series engines. Paragraph (c) of this AD is only applicable to 
    GE CF6-80A series engines. Paragraph (d) of this AD is only 
    applicable to GE CF6-80C2 series engines. Paragraph (e) of this AD 
    is only applicable to GE CF6-80E1 series engines.
    
        (b) For HPCR stages 3-9 spools installed in CF6-45/50 series 
    engines, eddy current and ultrasonic inspect for cracks as follows:
        (1) Eddy current and ultrasonic inspect for cracks HPCR stage 3-
    9 spools with P/Ns 9136M89G02, 9136M89G03, 9136M89G06, 9136M89G07, 
    9136M89G08, 9136M89G09, 9136M89G17, 9136M89G18, 9136M89G19, 
    9136M89G21, 9136M89G22, 9136M89G27, 9136M89G29, 9253M85G01, 
    9253M85G02, 9273M14G01, and 9331M29G01, installed in GE CF6-45/-50 
    series engines, as follows:
        (i) Perform eddy current and ultrasonic inspections in 
    accordance with GE CF6-50 Service Bulletin (SB) No. 72-1157, 
    Original, dated June 10, 1998, at the next piece-part exposure after 
    1,000 CSN.
        (ii) Perform eddy current and ultrasonic inspections in 
    accordance with GE CF6-50 Alert Service Bulletin (ASB) No. 72-A1131, 
    Revision 1, dated March 12, 1998, at the next piece-part exposure 
    after 1,000 CSN.
        (iii) Remove from service, prior to further flight, HPCR stage 
    3-9 spools that equal or exceed the reject criteria established by 
    SB No. 72-1157, Original, dated June 10, 1998, or ASB No. 72-A1131, 
    Revision 1, dated March 12, 1998, as applicable, and replace with a 
    serviceable part.
        (2) Eddy current and ultrasonic inspect for cracks HPCR stage 3-
    9 spools with P/Ns 9136M89G08, 9253M85G02, 9273M14G01, and 
    9331M29G01 and with Serial Numbers (S/Ns) listed in Table 801 of GE 
    CF6-50 Shop Manual GEK50481, section 05-11-02 Time Limits, and with 
    P/Ns 9136M89G02 and 9136M89G06 installed in GE CF6-45/-50 series 
    engines. Perform the inspections in accordance with GE CF6-50 SB No. 
    72-1108, Revision 1, dated July 29, 1996, as follows:
        (i) For HPCR stage 3-9 spools that have not been previously 
    inspected using the procedures in GE SB No. 72-888, Revision 6, 
    dated December 22, 1995; or SB No. 72-1000, Revision 2, dated 
    September 9, 1993; or SB No. 72-1108, Revision 1, dated July 29, 
    1996, or any earlier versions of these SBs, inspect at the first 
    piece-part exposure after 1,000 CSN but prior to accumulating 3,500 
    CSN, or prior to exceeding 30 days from the effective date of this 
    AD, whichever occurs later.
        (ii) For HPCR stage 3-9 spools that have been previously 
    inspected using the procedures in GE SB No. 72-888, Revision 6, 
    dated December 22, 1995; or SB No. 72-1000, Revision 2, dated 
    September 9, 1993; or SB No. 72-1108, Revision 1, dated July 29, 
    1996, or any earlier versions of these SBs, perform repeat 
    inspections at the earliest occurrence of the requirements of Table 
    1, 2, or 3 of this AD, as applicable, based on elapsed calendar time 
    from the effective date of this AD, as specified in paragraph 
    (b)(2)(v) of this AD.
    
                                     Table 1
    ------------------------------------------------------------------------
     
    -------------------------------------------------------------------------
    First piece-part exposure after both 1,000 CSLI and 3,500 CSN, but not
     later than the first ESV after both 2,000 CSLI and 3,500 CSN, and
     before 3,500 CSLI.
    ------------------------------------------------------------------------
    
    
                                     Table 2
    ------------------------------------------------------------------------
     
    -------------------------------------------------------------------------
    First piece-part exposure after both 1,000 CSLI and 3,500 CSN, but not
     later than the first ESV after both 2,000 CSLI and 3,500 CSN, and
     before:
     
    3,500 CSLI, if spool CALI is 0-6,500, or
    9,500 CSN, if spool CALI is 6,501-7,000, or
    2,500 CSLI, if spool CALI is 7,001-8,000, or
    10,500 CSN, if spool CALI is 8,001-8,500, or
    2,000 CSLI, if spool CALI is greater than 8,500.
    ------------------------------------------------------------------------
    
    
    [[Page 65139]]
    
    
                                     Table 3
    ------------------------------------------------------------------------
     
    -------------------------------------------------------------------------
    First piece-part exposure after both 1,000 CSLI and 3,500 CSN, but not
     later than the first ESV after both 2,000 CSLI and 3,500 CSN, and
     before:
     
    3,500 CSLI, if spool CALI is 0-5,000, or
    8,500 CSN, if spool CALI is 5,001-5,500, or
    3,000 CSLI, if spool CALI is 5,501-6,500, or
    9,500 CSN, if spool CALI is 6,501-7,000, or
    2,500 CSLI, if spool CALI is 7,001-8,000, or
    10,500 CSN, if spool CALI is 8,001-8,500, or
    2,000 CSLI, if spool CALI is greater than 8,500.
    --------------------------------------------------------------------
        (iii) Thereafter, inspect HPCR stage 3-9 spools at intervals not 
    to exceed the earliest occurrence shown in Table 1, Table 2, or 
    Table 3 of this AD, as applicable, based on the elapsed calendar 
    time from the effective date of this AD, as specified in paragraph 
    (b)(2)(v) of this AD.
        (iv) Remove from service prior to further flight HPCR stage 3-9 
    spools that equal or exceed the reject criteria established by GE 
    CF6-50 SB No. 72-1108, Revision 1, dated July 29, 1996, and replace 
    with a serviceable part.
        (v) Use the Tables as follows:
        (A) Use Table 1 from the effective date of this AD to 18 months 
    from the effective date of this AD.
        (B) Use Table 2 after 18 months from the effective date of this 
    AD to 36 months from the effective date of this AD.
        (C) Use Table 3 after 36 months from the effective date of this 
    AD.
        (3) Eddy current and ultrasonic inspect for cracks HPCR stage 3-
    9 spools with P/Ns 9136M89G08, 9253M85G02, 9273M14G01, and 
    9331M29G01, with S/Ns not listed in Table 801 of GE CF6-50 Shop 
    Manual GEK50481, section 05-11-02 Time Limits, and with P/Ns 
    9136M89G03, 9136M89G07, 9136M89G09, 9136M89G17, 9136M89G18, and 
    9253M85G01 installed in GE CF6-45/-50 series engines. Perform the 
    inspections in accordance with GE CF6-50 SB No. 72-1108, Revision 1, 
    dated July 29, 1996, as follows:
        (i) For HPCR stage 3-9 spools that have not been previously 
    inspected using the procedures in GE SB No. 72-888, Revision 6, 
    dated December 22, 1995; or SB No. 72-1000, Revision 2, dated 
    September 9, 1993; or SB No. 72-1108, Revision 1, dated July 29, 
    1996, or any earlier versions of these SBs, inspect at the first 
    piece-part exposure after 1,000 CSN but not later than the first ESV 
    after 4,000 CSN.
        (ii) For HPCR stage 3-9 spools that have been previously 
    inspected using the procedures in GE SB No. 72-888, Revision 6, 
    dated December 22, 1995; or SB No. 72-1000, Revision 2, dated 
    September 9, 1993; or SB No. 72-1108, Revision 1, dated July 29, 
    1996, or any earlier versions of these SBs, perform repeat 
    inspections at the first piece-part exposure after both 1,000 CSLI 
    and 4,000 CSN, but not later than the first ESV after both 2,000 
    CSLI and 4,000 CSN.
        (iii) Thereafter, inspect HPCR stage 3-9 spools at intervals not 
    to exceed the first piece-part exposure after both 1,000 CSLI and 
    4,000 CSN, but not later than the first ESV after both 2,000 CSLI 
    and 4,000 CSN.
        (iv) Remove from service prior to further flight HPCR stage 3-9 
    spools that equal or exceed the reject criteria established by GE 
    CF6-50 SB No. 72-1108, Revision 1, dated July 29, 1996, and replace 
    with a serviceable part.
        (4) Eddy current and ultrasonic inspect for cracks HPCR stage 3-
    9 spools with P/Ns 9136M89G19, 9136M89G21, 9136M89G22, and 
    9136M89G27 installed in GE CF6-45/-50 series engines. Perform the 
    inspections in accordance with GE CF6-50 SB No. 72-1108, Revision 1, 
    dated July 29, 1996, as follows:
        (i) For HPCR stage 3-9 spools that have not been previously 
    inspected using the procedures in GE SB No. 72-888, Revision 6, 
    dated December 22,1995; or SB No. 72-1000, Revision 2, dated 
    September 9, 1993; or SB No. 72-1108, Revision 1, dated July 29, 
    1996, or any earlier versions of these SBs, inspect at the first 
    piece-part exposure after 1,000 CSN but not later than the first ESV 
    after 3,000 CSN, provided, however, from 18 to 36 months after the 
    effective date of this AD, inspect not later than 9,500 CSN, and 
    after 36 months after the effective date of this AD, inspect not 
    later than 3,500 CSN.
        (ii) For HPCR stage 3-9 spools that have been previously 
    inspected using the procedures in GE SB No. 72-888, Revision 6, 
    dated December 22,1995; or SB No. 72-1000, Revision 2, dated 
    September 9, 1993; or SB No. 72-1108, Revision 1, dated July 29, 
    1996, or any earlier versions of these SBs, perform repeat 
    inspections at the earliest occurrence of the requirements of Table 
    4, 5, or 6 of this AD, as applicable, based on elapsed calendar time 
    from the effective date of this AD, as specified in paragraph 
    (b)(4)(vi) of this AD.
    
                                     Table 4
    ------------------------------------------------------------------------
     
    -------------------------------------------------------------------------
    First piece-part exposure after both 1,000 CSLI and 5,000 CSN, but not
     later than the first ESV after both 2,000 CSLI and 5,000 CSN.
    ------------------------------------------------------------------------
    
    
                                     Table 5
    ------------------------------------------------------------------------
     
    -------------------------------------------------------------------------
    First piece-part exposure after both 1,000 CSLI and 5,000 CSN, but not
     later than the first ESV after both 2,000 CSLI and 5,000 CSN, and
     before:
     
    9,500 CSN, if spool CALI is 0-7,000, or
    2,500 CSLI, if spool CALI is 7,001-8,000, or
    10,500 CSN, if spool CALI is 8,001-8,500, or
    2,000 CSLI, if spool CALI is greater than 8,500.
    ------------------------------------------------------------------------
    
    
                                     Table 6
    ------------------------------------------------------------------------
     
    -------------------------------------------------------------------------
    First piece-part exposure after both 1,000 CSLI and 5,000 CSN, but not
     later than the first ESV after both 2,000 CSLI and 5,000 CSN, and
     before:
     
    5,000 CSN, if spool CALI is 0-1,500, or
    3,500 CSLI, if spool CALI is 1,501-5,000, or
    8,500 CSN, if spool CALI is 5,001-5,500, or
    3,000 CSLI, if spool CALI is 5,501-6,500, or
    
    [[Page 65140]]
    
     
    9,500 CSN, if spool CALI is 6,501-7,000, or
    2,500 CSLI, if spool CALI is 7,001-8,000, or
    10,500 CSN, if spool CALI is 8,001-8,500, or
    2,000 CSLI, if spool CALI is greater than 8,500.
    ------------------------------------------------------------------------
    
        (iii) Thereafter, inspect HPCR stage 3-9 spools at intervals not 
    to exceed the earliest occurrence shown in Table 4, Table 5, or 
    Table 6 of this AD, as applicable, based on the elapsed calendar 
    time from the effective date of this AD, as specified in paragraph 
    (b)(4)(vi) of this AD.
        (iv) Remove from service prior to further flight HPCR stage 3-9 
    spools that equal or exceed the reject criteria established by GE 
    CF6-50 SB No. 72-1108, Revision 1, dated July 29, 1996, and replace 
    with a serviceable part.
        (v) HPCR stage 3-9 spools with a CSN of 10,500 or greater may 
    not be put back in service after an ESV.
        (vi) Use the Tables as follows:
        (A) Use Table 4 from the effective date of this AD to 18 months 
    from the effective date of this AD.
        (B) Use Table 5 after 18 months from the effective date of this 
    AD to 36 months from the effective date of this AD.
        (C) Use Table 6 after 36 months from the effective date of this 
    AD.
        (5) Eddy current and ultrasonic inspect for cracks HPCR stage 3-
    9 spools with P/N 9136M89G29 installed in GE CF6-45/-50 series 
    engines. Perform the inspections in accordance with GE CF6-50 SB No. 
    72-1108, Revision 1, dated July 29, 1996, as follows:
        (i) For HPCR stage 3-9 spools that have not been previously 
    inspected using the procedures in GE SB No. 72-888, Revision 6, 
    dated December 22,1995; or SB No. 72-1000, Revision 2, dated 
    September 9, 1993; or SB No. 72-1108, Revision 1, dated July 29, 
    1996, or any earlier versions of these SBs, or any of the 
    combinations of service documents specified by Table 7 of this AD, 
    inspect at the next piece-part exposure after 1,000 CSN.
    
                                     Table 7
    ------------------------------------------------------------------------
     
    -------------------------------------------------------------------------
    Either any one of the following:
     
    CF6 Standard Practice Manual GEK9250 Procedures 70-32-09, Revision 71,
     dated October 1, 1995,
    CF6 Standard Practice Manual GEK9250 Procedures 70-32-09, Revision 72,
     dated November 15, 1996,
    CF6 Standard Practice Manual GEK9250 Procedures 70-32-09, Revision 74,
     dated May 1, 1998,
     
    and any one of the following:
     
    CF6 Standard Practice Manual GEK9250 Procedures 70-32-10, Revision 71,
     dated October 1, 1995,
    CF6 Standard Practice Manual GEK9250 Procedures 70-32-010, Revision 72,
     dated November 15, 1996,
    CF6 Standard Practice Manual GEK9250 Procedures 70-32-010, Revision 74,
     dated May 1, 1998;
     
    or any one of the following:
     
    CF6 Standard Practice Manual GEK9250 Procedures 70-32-13, Revision 70-
     25, dated August 26, 1996,
    CF6 Standard Practice Manual GEK9250 Procedure 70-32-13, Revision 72,
     dated November 15, 1996,
    CF6 Standard Practice Manual GEK9250 Procedures 70-32-13, Revision 73,
     dated November 1, 1997,
     
    and any one of the following:
     
    CF6 Standard Practice Manual GEK9250 Procedures 70-32-14, Revision 70-
     26, dated August 26, 1996,
    CF6 Standard Practice Manual GEK9250 Procedure 70-32-14, Revision 72,
     dated November 15, 1996,
    CF6 Standard Practice Manual GEK9250 Procedures 70-32-14, Revision 73,
     dated November 1, 1997.
    ------------------------------------------------------------------------
    
        (ii) For HPCR stage 3-9 spools that have been previously 
    inspected using the procedures in GE SB No. 72-888, Revision 6, 
    dated December 22,1995; or SB No. 72-1000, Revision 2, dated 
    September 9, 1993; or SB No. 72-1108, Revision 1, dated July 29, 
    1996, or any earlier versions of these SBs, or any of the 
    combinations of service documents specified by Table 7 of this AD, 
    inspect at first piece-part exposure after both 1,000 CSLI and 5,000 
    CSN.
        (iii) Thereafter, inspect HPCR stage 3-9 spools at piece part 
    exposure after both 1,000 CSLI and 5,000 CSN.
        (iv) Remove from service prior to further flight HPCR stage 3-9 
    spools that equal or exceed the reject criteria established by GE 
    CF6-50 SB No. 72-1108, Revision 1, dated July 29, 1996, and replace 
    with a serviceable part.
        (c) For HPCR stages 3-9 spools installed in GE CF6-80A/-80A1/-
    80A2/-80A3 series engines, eddy current and ultrasonic inspect for 
    cracks as follows:
        (1) Eddy current and ultrasonic inspect for cracks HPCR stage 3-
    9 spools with P/Ns 9136M89G10, 9136M89G11, 9136M89G20, 9136M89G21, 
    9136M89G22, 9136M89G27, and 9136M89G28 installed in GE CF6-80A/-
    80A1/-80A2/-80A3 series engines, as follows:
        (i) Perform eddy current and ultrasonic inspections in 
    accordance with GE CF6-80A SB No. 72-719, Revision 1, dated 
    September 24, 1998, at the next piece-part exposure after 1,000 CSN.
        (ii) Perform eddy current and ultrasonic inspections in 
    accordance with GE CF6-80A ASB No. 72-A691, Revision 2, dated 
    September 23, 1998, at the next piece-part exposure after 1,000 CSN.
        (iii) Remove from service, prior to further flight, HPCR stage 
    3-9 spools that equal or exceed the reject criteria established by 
    the SB No. 72-719, Revision 1, dated September 24, 1998, or ASB No. 
    72-A691, Revision 2, dated September 23, 1998, as applicable, and 
    replace with a serviceable part.
        (2) Eddy current and ultrasonic inspect for cracks HPCR stage 3-
    9 spools with P/N 9136M89G10, with the following S/Ns: MPOM0054, 
    MPOM7090, MPOM8303, MPOM8304, MPOM9263, MPOM9264, MPON0054, 
    MPON0071, MPON0072, MPON1643, MPON4251, and MPON4253 installed in GE 
    CF6-80A/-80A1/-80A2/-80A3 series engines. Perform the inspections in 
    accordance with GE CF6-80A SB No. 72-678, Revision 1, dated August 
    8, 1996, as follows:
        (i) For HPCR stage 3-9 spools that have not been previously 
    inspected using the procedures in GE SB No. 72-500, Revision 6, 
    dated December 22,1995; or SB No. 72-583, Revision 5, dated December 
    22, 1995; or SB No. 72-678, Revision 1, dated July 29, 1996, or any 
    earlier versions of these SBs, inspect at the first piece-part 
    exposure after 1,000 CSN but before accumulating 3,500 CSN, or prior 
    to exceeding 30 days from the effective date of this AD, whichever 
    is later.
        (ii) For HPCR stage 3-9 spools that have been previously 
    inspected using the procedures in GE SB No. 72-500, Revision 6, 
    dated December 22, 1995; or SB No. 72-583, Revision 5, dated 
    December 22, 1995; or SB No. 72-678, Revision 1, dated July 29, 
    1996, or any earlier versions of these SBs, perform repeat 
    inspections at the earliest occurrence of the requirements of Table 
    8, 9, or 10 of this AD, as applicable, based on elapsed calendar 
    time from the effective date of this AD, as specified in paragraph 
    (c)(2)(vi) of this AD.
    
    [[Page 65141]]
    
    
    
                                     Table 8
    ------------------------------------------------------------------------
     
    -------------------------------------------------------------------------
    First piece-part exposure after both 1,000 CSLI and 3,500
    CSN, but not later than the first ESV after both 3,500 CSN and 2,000
     CSLI (for GE CF6-80A1/A3 engines) or 1,500 CSLI (for GE CF6-80A/A2
     engines), and before 3,500 CSLI.
    ------------------------------------------------------------------------
    
    
                                     Table 9
    ------------------------------------------------------------------------
     
    -------------------------------------------------------------------------
    First piece part exposure after both 1,000 CSLI and 3,500 CSN, but not
     later than the first ESV after both 3,500 CSN and 2,000 CSLI (for GE
     CF6-80A1/A3 engines) or 1,500 CSLI (for GE CF6-80A/A2 engines), and
     before:
    3,500 CSLI, if spool CALI is 0--6,500, or
    9,500 CSN, if spool CALI is 6,501--7,000, or
    2,500 CSLI, if spool CALI is 7,001--8,000, or
    10,500 CSN, if spool CALI is 8,001-8,500, or
    2,000 CSLI, if spool CALI is greater than 8,500.
    ------------------------------------------------------------------------
    
    
                                    Table 10
    ------------------------------------------------------------------------
     
    -------------------------------------------------------------------------
    First piece-part exposure after both 1,000 CSLI and 3,500 CSN, but not
     later than the first ESV after both 2,000 CSLI (for GE CF6-80A1/A3) or
     1,500 CSLI (for GE CF6-80A/A2) and 3,500 CSN, and before:
     
    3,500 CSLI, if spool CALI is 0--5,000, or
    8,500 CSN, if spool CALI is 5,001--5,500, or
    3,000 CSLI, if spool CALI is 5,501--6,500, or
    9,500 CSN, if spool CALI is 6,501--7,000, or
    2,500 CSLI, if spool CALI is 7,001--8,000, or
    10,500 CSN, if spool CALI is 8,001--8,500, or
    2,000 CSLI, if spool CALI is greater than 8,500.
    ------------------------------------------------------------------------
    
        (iii) Thereafter, inspect HPCR stage 3-9 spools at intervals not 
    to exceed the earliest occurrence shown in Table 8, Table 9, or 
    Table 10 of this AD, as applicable, based on the elapsed calendar 
    time from the effective date of this AD, as specified in paragraph 
    (c)(2)(vi) of this AD.
        (iv) Remove from service prior to further flight HPCR stage 3-9 
    spools that equal or exceed the reject criteria established by GE 
    CF6-80A SB No. 72-678, Revision 1, dated August 8, 1996, and replace 
    with a serviceable part.
        (v) HPCR stage 3-9 spools with a CSN of 10,500 or greater may 
    not be put back in service after an ESV.
        (vi) Use the Tables as follows:
        (A) Use Table 8 from the effective date of this AD to 18 months 
    from the effective date of this AD.
        (B) Use Table 9 after 18 months from the effective date of this 
    AD to 36 months from the effective date of this AD.
        (C) Use Table 10 after 36 months from the effective date of this 
    AD.
        (3) Eddy current and ultrasonic inspect for cracks HPCR stage 3-
    9 spools with P/N 9136M89G10, with S/Ns other than those listed in 
    paragraph (c)(2) of this AD, and P/N 9136M89G11, installed in GE 
    CF6-80A/A2 series engines. Perform the inspections in accordance 
    with GE CF6-80A SB No. 72-678, Revision 1, dated August 8, 1996, as 
    follows:
        (i) For HPCR stage 3-9 spools that have not been previously 
    inspected using the procedures in GE SB No. 72-500, Revision 6, 
    dated December 22,1995; or SB No. 72-583, Revision 5, dated December 
    22, 1995; or SB No. 72-678, Revision 1, dated July 29, 1996, or any 
    earlier versions of these SBs, inspect at the first piece-part 
    exposure after 1,000 CSN, but not later than the first ESV after 
    5,000 CSN.
        (ii) For HPCR stage 3-9 spools that have been previously 
    inspected using the procedures in GE SB No. 72-500, Revision 6, 
    dated December 22, 1995; or SB No. 72-583, Revision 5, dated 
    December 22, 1995; or SB No. 72-678, Revision 1, dated July 29, 
    1996, or any earlier versions of these SBs, perform repeat 
    inspections at the first piece-part exposure after both 1,000 CSLI 
    and 5,000 CSN, but not later than the first ESV after both 1,500 
    CSLI and 5,000 CSN.
        (iii) Thereafter, inspect HPCR stage 3-9 spools at intervals not 
    to exceed the first piece-part exposure after both 1,000 CSLI and 
    5,000 CSN, but not later than the first ESV after both 1,500 CSLI 
    and 5,000 CSN.
        (iv) Remove from service prior to further flight HPCR stage 3-9 
    spools that equal or exceed the reject criteria established by GE 
    CF6-80A SB No. 72-678, Revision 1, dated August 8, 1996, and replace 
    with a serviceable part.
        (4) Eddy current and ultrasonic inspect for cracks HPCR stage 3-
    9 spools with P/N 9136M89G10, with S/Ns other than those listed in 
    paragraph (c)(2) of this AD, and P/N 9136M89G11, installed in GE 
    CF6-80A1/A3 series engines. Perform the inspections in accordance 
    with GE CF6-80A SB No. 72-678, Revision 1, dated August 8, 1996, as 
    follows:
        (i) For HPCR stage 3-9 spools that have not been previously 
    inspected using the procedures in GE SB No. 72-500, Revision 6, 
    dated December 22,1995; or SB No. 72-583, Revision 5, dated December 
    22, 1995; or SB No. 72-678, Revision 1, dated July 29, 1996, or any 
    earlier versions of these SBs, inspect at the first piece-part 
    exposure after 1,000 CSN but not later than the first ESV after 
    5,000 CSN.
        (ii) For HPCR stage 3-9 spools that have been previously 
    inspected using the procedures in GE SB No. 72-500, Revision 6, 
    dated December 22,1995; or SB No. 72-583, Revision 5, dated December 
    22, 1995; or SB No. 72-678, Revision 1, dated July 29, 1996, or any 
    earlier versions of these SBs, perform repeat inspections at the 
    first piece-part exposure after both 1,000 CSLI and 5,000 CSN, but 
    not later than the first ESV after both 2,000 CSLI and 5,000 CSN.
        (iii) Thereafter, inspect HPCR stage 3-9 spools at intervals not 
    to exceed the first piece-part exposure after both 1,000 CSLI and 
    5,000 CSN, but not later than the first ESV after both 2,000 CSLI 
    and 5,000 CSN.
        (iv) Remove from service prior to further flight HPCR stage 3-9 
    spools that equal or exceed the reject criteria established by GE 
    CF6-80A SB No. 72-678, Revision 1, dated August 8, 1996, and replace 
    with a serviceable part.
        (5) Eddy current and ultrasonic inspect for cracks HPCR stage 3-9 
    spools with P/Ns 9136M89G20, 9136M89G21, 9136M89G22 and 9136M89G27, 
    installed in GE CF6-80A1/A3 series engines. Perform the inspections in 
    accordance with GE CF6-80A SB No. 72-678, Revision 1, dated August 8, 
    1996, as follows:
        (i) For HPCR stage 3-9 spools that have not been previously 
    inspected using the procedures in GE SB No. 72-500, Revision 6, 
    dated December 22,1995; or SB No. 72-583, Revision 5, dated December 
    22, 1995; or SB No. 72-678, Revision 1, dated July 29, 1996, or any 
    earlier versions of these SBs, inspect at the first piece-part 
    exposure after 1,000 CSN but not later than the first ESV after 
    3,000 CSN, provided, however, from 18 to 36 months after the 
    effective date of this AD, inspect not later than 9,500 CSN, and 
    after 36 months after the effective date of this AD, inspect not 
    later than 3,500 CSN.
    
    [[Page 65142]]
    
        (ii) For HPCR stage 3-9 spools that have been previously 
    inspected using the procedures in GE SB No. 72-500, Revision 6, 
    dated December 22,1995; or SB No. 72-583, Revision 5, dated December 
    22, 1995; or SB No. 72-678, Revision 1, dated July 29, 1996, or any 
    earlier versions of these SBs, perform repeat inspections at the 
    earliest occurrence of the requirements of Table 11, 12, or 13 of 
    this AD, as applicable, based on elapsed calendar time from the 
    effective date of this AD, as specified in paragraph (c)(5)(vi) of 
    this AD.
    
                                    Table 11
    ------------------------------------------------------------------------
     
    -------------------------------------------------------------------------
    First piece-part exposure after both 1,000 CSLI and 5,000 CSN, but not
     later than the first ESV after both 2,000 CSLI and 5,000 CSN.
    ------------------------------------------------------------------------
    
    
                                    Table 12
    ------------------------------------------------------------------------
     
    -------------------------------------------------------------------------
    First piece-part exposure after both 1,000 CSLI and 5,000 CSN, but not
     later than the first ESV after both 2,000 CSLI and 5,000 CSN, and
     before:
     
    9,500 CSN, if spool CALI is 0-7,000, or
    2,500 CSLI, if spool CALI is 7,001-8,000, or
    10,500 CSN, if spool CALI is 8,001-8,500, or
    2,000 CSLI, if spool CALI is greater than 8,500.
    ------------------------------------------------------------------------
    
    
                                    Table 13
    ------------------------------------------------------------------------
     
    -------------------------------------------------------------------------
    First piece-part exposure after both 1,000 CSLI and 5,000 CSN, but not
     later than the first ESV after both 2,000 CSLI and 5,000 CSN, and
     before:
     
    5,000 CSN, if spool CALI is 0-1,500, or
    3,500 CSLI, if spool CALI is 1,501-5,000, or
    8,500 CSN, if spool CALI is 5,001-5,500, or
    3,000 CSLI, if spool CALI is 5,501-6,500, or
    9,500 CSN, if spool CALI is 6,501-7,000, or
    2,500 CSLI, if spool CALI is 7,001-8,000, or
    10,500 CSN, if spool CALI is 8,001-8,500, or
    2,000 CSLI, if spool CALI is greater than 8,500.
    ------------------------------------------------------------------------
    
        (iii) Thereafter, inspect HPCR stage 3-9 spools at intervals not 
    to exceed the earliest occurrence shown in Table 11, Table 12, or 
    Table 13 of this AD, as applicable, based on the elapsed calendar 
    time from the effective date of this AD, as specified in paragraph 
    (c)(5)(vi) of this AD.
        (iv) Remove from service prior to further flight HPCR stage 3-9 
    spools that equal or exceed the reject criteria established by GE 
    CF6-80A SB No. 72-678, Revision 1, dated August 8, 1996, and replace 
    with a serviceable part.
        (v) HPCR stage 3-9 spools with a CSN of 10,500 or greater may 
    not be put back in service after an ESV.
        (vi) Use the Tables as follows:
        (A) Use Table 11 from the effective date of this AD to 18 months 
    from the effective date of this AD.
        (B) Use Table 12 after 18 months from the effective date of this 
    AD to 36 months from the effective date of this AD.
        (C) Use Table 13 after 36 months from the effective date of this 
    AD.
        (6) Eddy current and ultrasonic inspect for cracks HPCR stage 3-
    9 spools with P/Ns 9136M89G20, 9136M89G21, 9136M89G22, and 
    9136M89G27 installed in GE CF6-80A/A2 series engines. Perform the 
    inspections in accordance with GE CF6-80A SB No. 72-678, Revision 1, 
    dated August 8, 1996, as follows:
        (i) For HPCR stage 3-9 spools that have not been previously 
    inspected using the procedures in GE SB No. 72-500, Revision 6, 
    dated December 22, 1995; or SB No. 72-583, Revision 5, dated 
    December 22, 1995; or SB No. 72-678, Revision 1, dated July 29, 
    1996, or any earlier versions of these SBs, inspect at the first 
    piece-part exposure after 1,000 CSN but not later than the first ESV 
    after 3,000 CSN, provided, however, from 18 to 36 months after the 
    effective date of this AD, inspect not later than 9,500 CSN, and 
    after 36 months after the effective date of this AD, inspect not 
    later than 3,500 CSN.
        (ii) For HPCR stage 3-9 spools that have been previously 
    inspected using the procedures in GE SB No. 72-500, Revision 6, 
    dated December 22, 1995; or SB No. 72-583, Revision 5, dated 
    December 22, 1995; or SB No. 72-678, Revision 1, dated July 29, 
    1996, or any earlier versions of these SBs, perform repeat 
    inspections at the earliest occurrence of the requirements of Table 
    14, 15, or 16 of this AD, as applicable, based on elapsed calendar 
    time from the effective date of this AD, as specified in paragraph 
    (c)(6)(vi) of this AD.
    
                                    Table 14
    ------------------------------------------------------------------------
     
    -------------------------------------------------------------------------
    First piece-part exposure after both 1,000 CSLI and 5,000 CSN, but not
     later than the first ESV after both 1,500 CSLI and 5,000 CSN.
    ------------------------------------------------------------------------
    
    
                                    Table 15
    ------------------------------------------------------------------------
     
    -------------------------------------------------------------------------
    First piece-part exposure after both 1,000 CSLI and 5,000 CSN, but not
     later than the first ESV after both 1,500 CSLI and 5,000 CSN, and
     before:
     
    9,500 CSN, if spool CALI is 0-7,000, or
    2,500 CSLI, if spool CALI is 7,001-8,000, or
    10,500 CSN, if spool CALI is 8,001-8,500, or
    2,000 CSLI, if spool CALI is greater than 8,500.
    ------------------------------------------------------------------------
    
    
    [[Page 65143]]
    
    
                                    Table 16
    ------------------------------------------------------------------------
     
    -------------------------------------------------------------------------
    First piece-part exposure after both 1,000 CSLI and 5,000 CSN, but not
     later than the first ESV after both 1,500 CSLI and 5,000 CSN, and
     before:
     
    5,000 CSN, if spool CALI is 0-1,500, or
    3,500 CSLI, if spool CALI is 1,501-5,000, or
    8,500 CSN, if spool CALI is 5,001-5,500, or
    3,000 CSLI, if spool CALI is 5,501-6,500, or
    9,500 CSN, if spool CALI is 6,501-7,000, or
    2,500 CSLI, if spool CALI is 7,001-8,000, or
    10,500 CSN, if spool CALI is 8,001-8,500, or
    2,000 CSLI, if spool CALI is greater than 8,500.
    ------------------------------------------------------------------------
    
        (iii) Thereafter, inspect HPCR stage 3-9 spools at intervals not 
    to exceed the earliest occurrence shown in Table 14, Table 15, or 
    Table 16 of this AD, as applicable, based on the elapsed calendar 
    time from the effective date of this AD, as specified in paragraph 
    (c)(6)(vi) of this AD.
        (iv) Remove from service prior to further flight HPCR stage 3-9 
    spools that equal or exceed the reject criteria established by GE 
    CF6-80A SB No. 72-678, Revision 1, dated August 8, 1996, and replace 
    with a serviceable part.
        (v) HPCR stage 3-9 spools with a CSN of 10,500 or greater may 
    not be put back in service after an ESV.
        (vi) Use the Tables as follows:
        (A) Use Table 14 from the effective date of this AD to 18 months 
    from the effective date of this AD.
        (B) Use Table 15 after 18 months from the effective date of this 
    AD to 36 months from the effective date of this AD.
        (C) Use Table 16 after 36 months from the effective date of this 
    AD.
        (7) Eddy current and ultrasonic inspect for cracks HPCR stage 3-
    9 spools with P/N 9136M89G28 installed in GE CF6-80A/A1/A2/A3 series 
    engines. Perform the inspections in accordance with GE CF6-80A SB 
    No. 72-678, Revision 1, dated August 8, 1996, as follows:
        (i) For HPCR stage 3-9 spools that have not been previously 
    inspected using the procedures in GE SB No. 72-500, Revision 6, 
    dated December 22,1995; or SB No. 72-583, Revision 5, dated December 
    22, 1995; or SB No. 72-678, Revision 1, dated July 29, 1996, or any 
    earlier versions of these SBs, or any of the combinations of service 
    documents specified by Table 7 of this AD, inspect at the first 
    piece-part exposure after both 1,000 CSN and the effective date of 
    this AD.
        (ii) For HPCR stage 3-9 spools that have been previously 
    inspected using the procedures in GE SB No. 72-500, Revision 6, 
    dated December 22, 1995; or SB No. 72-583, Revision 5, dated 
    December 22, 1995; or SB No. 72-678, Revision 1, dated July 29, 
    1996, or any earlier versions of these SBs, or any of the service 
    documents listed in Table 7 of this AD, inspect at first piece-part 
    exposure after both 1,000 CSLI and 5,000 CSN.
        (iii) Thereafter, inspect HPCR stage 3-9 spools at piece-part 
    exposure after both 1,000 CSLI and 5,000 CSN.
        (iv) Remove from service prior to further flight HPCR stage 3-9 
    spools that equal or exceed the reject criteria established by GE 
    CF6-80A SB No. 72-678, Revision 1, dated August 8, 1996, and replace 
    with a serviceable part.
        (d) For HPCR stages 3-9 spools installed in GE CF6-80C2 series 
    engines, eddy current and ultrasonic inspect for cracks as follows:
        (1) Eddy current and ultrasonic inspect for cracks HPCR stage 3-
    9 spools with P/Ns 1333M66G01, 1333M66G03, 1333M66G07, 1333M66G09, 
    1333M66G10, 1781M52P01, 1781M53G01, 1854M95P01, 1854M95P02, 
    1854M95P03, 1854M95P04, 1854M95P05, 1854M95P06, and 9380M28P05 
    installed in GE CF6-80C2 series engines, as follows:
        (i) Perform eddy current and ultrasonic inspections in 
    accordance with GE CF6-80C2 SB No. 72-934, Original, dated June 
    10,1998, at the next piece-part exposure after 1,000 CSN.
        (ii) Perform eddy current and ultrasonic inspections in 
    accordance with GE CF6-80C2 ASB No. 72-A848, Revision 2, dated March 
    12, 1998, at the next piece-part exposure after 1,000 CSN.
        (iii) Remove from service prior to further flight HPCR stage 3-9 
    spools that equal or exceed the reject criteria established by the 
    SB No. 72-934, Original, dated June 10, 1998 or ASB No. 72-A848, 
    Revision 2, dated March 12, 1998, as applicable and replace with a 
    serviceable part.
        (2) Eddy current and ultrasonic inspect for cracks HPCR stage 3-
    9 spools with P/Ns 1781M52P01, 1854M95P02, 1854M95P05, and 
    9380M28P05 installed in GE CF6-80C2 series engines. Perform the 
    inspections in accordance with GE CF6-80C2 SB No. 72-812, Revision 
    1, dated January 30, 1998, as follows:
        (i) For HPCR stage 3-9 spools that have not been previously 
    inspected using the procedures in GE SB No. 72-418, Revision 4, 
    dated December 22, 1995; or SB No. 72-758, Revision 1, dated 
    December 22, 1995; or SB No. 72-812, Revision 1, dated January 30, 
    1998, or any earlier versions of these SBs, inspect at the first 
    piece-part exposure after 1,000 CSN but prior to accumulating 3,500 
    CSN, or prior to exceeding 30 days from the effective date of this 
    AD, whichever occurs later.
        (ii) For HPCR stage 3-9 spools that have been previously 
    inspected using the procedures in GE SB No. 72-418, Revision 4, 
    dated December 22, 1995; or SB No. 72-758, Revision 1, dated 
    December 22, 1995; or SB No. 72-812, Revision 1, dated January 30, 
    1998, or any earlier versions of these SBs, perform repeat 
    inspections at the earliest occurrence of the requirements of Table 
    17, 18, or 19 of this AD, as applicable, based on elapsed calendar 
    time from the effective date of this AD, as specified in paragraph 
    (d)(2)(vi) of this AD.
    
                                    Table 17
    ------------------------------------------------------------------------
     
    -------------------------------------------------------------------------
    First piece-part or module level exposure after both 1,000 CSLI and
     3,500 CSN, but not later than the first ESV after both 1,500 CSLI and
     3,500 CSN, and before 3,500 CSLI.
    ------------------------------------------------------------------------
    
    
                                    Table 18
    ------------------------------------------------------------------------
     
    -------------------------------------------------------------------------
    First piece-part or module level exposure after both 1,000 CSLI and
     3,500 CSN, but not later than the first ESV after both 1,500 CSLI and
     3,500 CSN, and before:
     
    3,500 CSLI, if spool CALI is 0-6,500, or
    9,500 CSN, if spool CALI is 6,501-7,000, or
    2,500 CSLI, if spool CALI is 7,001-8,000, or
    10,500 CSN, if spool CALI is 8,001-8,500, or
    2,000 CSLI, if spool CALI is greater than 8,500.
    ------------------------------------------------------------------------
    
    
    [[Page 65144]]
    
    
                                    Table 19
    ------------------------------------------------------------------------
     
    -------------------------------------------------------------------------
    First piece-part or module level exposure after both 1,000 CSLI and
     3,500 CSN, but not later than the first ESV after both 1,500 CSLI and
     3,500 CSN, and before:
     
    3,500 CSLI, if spool CALI is 0-5,000, or
    8,500 CSN, if spool CALI is 5,001-5,500, or
    3,000 CSLI, if spool CALI is 5,501-6,500, or
    9,500 CSN, if spool CALI is 6,501-7,000, or
    2,500 CSLI, if spool CALI is 7,001-8,000, or
    10,500 CSN, if spool CALI is 8,001-8,500, or
    2,000 CSLI, if spool CALI is greater than 8,500.
    ------------------------------------------------------------------------
    
        (iii) Thereafter, inspect HPCR stage 3-9 spools at intervals not 
    to exceed the earliest occurrence shown in Table 17, Table 18, or 
    Table 19 of this AD, as applicable, based on the elapsed calendar 
    time from the effective date of this AD, as specified in paragraph 
    (d)(2)(vi) of this AD.
        (iv) Remove from service prior to further flight HPCR stage 3-9 
    spools that equal or exceed the reject criteria established by GE 
    CF6-80C2 SB No. 72-812, Revision 1, dated January 30, 1998, and 
    replace with a serviceable part.
        (v) HPCR stage 3-9 spools with a CSN of 10,500 or greater may 
    not be put back in service after an ESV.
        (vi) Use the Tables as follows:
        (A) Use Table 17 from the effective date of this AD to 18 months 
    from the effective date of this AD.
        (B) Use Table 18 after 18 months from the effective date of this 
    AD to 36 months from the effective date of this AD.
        (C) Use Table 19 after 36 months from the effective date of this 
    AD.
        (3) Eddy current and ultrasonic inspect for cracks HPCR stage 3-
    9 spools with P/Ns 1333M66G01, 1333M66G03, 1333M66G07, 1333M66G09, 
    1781M53G01, 1854M95P01, 1854M95P03, 1854M95P04, and 1854M95P06 
    installed in GE CF6-80C2 series engines. Perform the inspections in 
    accordance with GE CF6-80C2 SB No. 72-812, Revision 1, dated January 
    30, 1998, as follows:
        (i) For HPCR stage 3-9 spools that have not been previously 
    inspected using the procedures in GE SB No. 72-418, Revision 4, 
    dated December 22, 1995; or SB No. 72-758, Revision 1, dated 
    December 22, 1995; or SB No. 72-812, Revision 1, dated January 30, 
    1998, or any earlier versions of these SBs, inspect at the first 
    piece-part exposure after 1,000 CSN but not later than the first ESV 
    after 3,000 CSN, provided, however, from 18 to 36 months after the 
    effective date of this AD, inspect not later than 9,500 CSN, and 
    after 36 months after the effective date of this AD, inspect not 
    later than 3,500 CSN.
        (ii) For HPCR stage 3-9 spools that have been previously 
    inspected using the procedures in GE SB No. 72-418, Revision 4, 
    dated December 22, 1995; or SB No. 72-758, Revision 1, dated 
    December 22, 1995; or SB No. 72-812, Revision 1, dated January 30, 
    1998, or any earlier versions of these SBs, perform repeat 
    inspections at the earliest occurrence of the requirements of Table 
    20, 21, or 22 of this AD, as applicable, based on elapsed calendar 
    time from the effective date of this AD, as specified in paragraph 
    (d)(3)(vi) of this AD.
    
                                    Table 20
    ------------------------------------------------------------------------
     
    -------------------------------------------------------------------------
    First piece-part or module level exposure after both 1,000 CSLI and
     3,500 CSN, but not later than the first ESV after both 1,500 CSLI and
     3,500 CSN.
    ------------------------------------------------------------------------
    
    
                                    Table 21
    ------------------------------------------------------------------------
     
    -------------------------------------------------------------------------
    First piece-part or module level exposure after both 1,000 CSLI and
     3,500 CSN, but not later than the first ESV after both 1,500 CSLI and
     3,500 CSN, and before:
     
    9,500 CSN, if spool CALI is 0-7,000, or
    2,500 CSLI, if spool CALI is 7,001-8,000, or
     10,500 CSN, if spool CALI is 8,001-8,500, or
    2,000 CSLI, if spool CALI is greater than 8,500.
    ------------------------------------------------------------------------
    
    
                                    Table 22
    ------------------------------------------------------------------------
     
    -------------------------------------------------------------------------
    First piece-part or module level exposure after both 1,000 CSLI and
     3,500 CSN, but not later than the first ESV after both 1,500 CSLI and
     3,500 CSN, and before:
     
    3,500 CSLI, if spool CALI is 0-5,000, or
    8,500 CSN, if spool CALI is 5,001-5,500, or
    3,000 CSLI, if spool CALI is 5,501-6,500, or
    9,500 CSN, if spool CALI is 6,501-7,000, or
    2,500 CSLI, if spool CALI is 7,001-8,000, or
    10,500 CSN, if spool CALI is 8,001-8,500, or
    2,000 CSLI, if spool CALI is greater than 8,500.
    ------------------------------------------------------------------------
    
        (iii) Thereafter, inspect HPCR stage 3-9 spools at intervals not 
    to exceed the earliest occurrence shown in Table 21, Table 22, or 
    Table 23 of this AD, as applicable, based on elapsed calendar time 
    from the effective date of this AD, as specified in paragraph 
    (d)(3)(vi) of this AD.
        (iv) Remove from service prior to further flight HPCR stage 3-9 
    spools that equal or exceed the reject criteria established by GE 
    CF6-80C2 SB No. 72-812, Revision 1, dated January 30, 1998, and 
    replace with a serviceable part.
        (v) HPCR stage 3-9 spools with a CSN of 10,500 or greater may 
    not be put back in service after an ESV.
        (vi) Use the Tables as follows:
        (A) Use Table 21 from the effective date of this AD to 18 months 
    from the effective date of this AD.
        (B) Use Table 22 after 18 months from the effective date of this 
    AD to 36 months from the effective date of this AD.
        (C) Use Table 23 after 36 months from the effective date of this 
    AD.
        (4) Eddy current and ultrasonic inspect for cracks HPCR stage 3-
    9 spools with P/N 1333M66G10 installed in GE CF6-80C2 series 
    engines. Perform the inspections in accordance with GE CF6-80C2 SB 
    No. 72-812, Revision 1, dated January 30, 1998, as follows:
    
    [[Page 65145]]
    
        (i) For HPCR stage 3-9 spools that have not been previously 
    inspected using the procedures in GE SB No. 72-418, Revision 4, 
    dated December 22, 1995; or SB No. 72-758, Revision 1, dated 
    December 22, 1995; or SB No. 72-812, Revision 1, dated January 30, 
    1998, or any earlier versions of these SBs, or any of the 
    combinations of service documents specified by Table 7 of this AD, 
    inspect at the first piece-part exposure after both 1,000 CSN and 
    the effective date of this AD.
        (ii) For HPCR stage 3-9 spools that have been previously 
    inspected using the procedures in GE SB No. 72-418, Revision 4, 
    dated December 22, 1995; or SB No. 72-758, Revision 1, dated 
    December 22, 1995; or SB No. 72-812, Revision 1, dated January 30, 
    1998, or any earlier versions of these SBs, or any of the 
    combinations of service documents specified by Table 7 of this AD, 
    inspect at first piece part exposure after both 1,000 CSLI and 3,500 
    CSN.
        (iii) Thereafter, inspect HPCR stage 3-9 spools at piece part 
    exposure after both 1,000 CSLI and 3,500 CSN.
        (iv) Remove from service prior to further flight HPCR stage 3-9 
    spools that equal or exceed the reject criteria established by GE 
    CF6-80C2 SB No. 72-812, Revision 1, dated January 30, 1998, and 
    replace with a serviceable part.
        (e) For HPCR stages 3-9 spools installed in GE CF6-80E1 series 
    engines, eddy current and ultrasonic inspect for cracks as follows:
        (1) Eddy current and ultrasonic inspect for cracks HPCR stage 3-
    9 spools with P/Ns 1669M22G01, 1669M22G03, 1782M22G01, 1782M22G02, 
    and 1782M22G04 installed in GE CF6-80E1 series engines, as follows:
        (i) Perform eddy current and ultrasonic inspections in 
    accordance with GE CF6-80E1 SB No. 72-137, Original, dated June 9, 
    1998, at the next piece-part exposure after 1,000 CSN.
        (ii) Perform eddy current and ultrasonic inspections in 
    accordance with GE CF6-80E1 ASB No. 72-A126, Revision 1, dated March 
    31, 1998, at the next piece-part exposure after 1,000 CSN.
        (iii) Remove from service prior to further flight HPCR stage 3-9 
    spools that equal or exceed the reject criteria established by SB 
    No. 72-137, Original, dated June 9, 1998 or ASB No. 72-A126, 
    Revision 1, dated March 31, 1998, as applicable, and replace with a 
    serviceable part.
        (2) Eddy current and ultrasonic inspect for cracks HPCR stage 3-
    9 spools with P/Ns 1669M22G01, 1669M22G03, 1782M22G01, and 
    1782M22G02 installed in GE CF6-80E1 series engines. Perform the 
    inspections in accordance with GE CF6-80E1 ASB No. 72-A135, 
    Original, dated August 13, 1998, as follows:
        (i) For HPCR stage 3-9 spools that have not been previously 
    inspected in accordance with in accordance GE CF6-80E1 ASB No. 72-
    A135, Original, dated August 13, 1998, or any of the combinations of 
    service documents specified by Table 7 of this AD, inspect HPCR 
    stage 3-9 spools at the first piece-part exposure after 1,000 CSN, 
    but not later than the first ESV after 3,000 CSN, provided, however, 
    from 18 to 36 months after the effective date of this AD, inspect 
    not later than 9,500 CSN, and after 36 months after the effective 
    date of this AD, inspect not later than 3,500 CSN.
        (ii) For HPCR stage 3-9 spools that have been previously 
    inspected in accordance with GE CF6-80E1 ASB No. 72-A135, Original, 
    dated August 13, 1998, or any of the combinations of service 
    documents specified by Table 7 of this AD, perform repeat 
    inspections at the earliest occurrence of the requirements of Table 
    24, 25, or 26 of this AD, as applicable, based on elapsed calendar 
    time from the effective date of this AD, as specified in paragraph 
    (e)(2)(vi) of this AD.
    
                                    Table 24
    ------------------------------------------------------------------------
     
    -------------------------------------------------------------------------
    First piece-part or module level exposure after both 1,000 CSLI and
     3,500 CSN, but not later than the first ESV after both 1,500 CSLI and
     3,500 CSN.
    ------------------------------------------------------------------------
    
    
                                    Table 25
    ------------------------------------------------------------------------
     
    -------------------------------------------------------------------------
    First piece-part or module level exposure after both 1,000 CSLI and
     3,500 CSN, but not later than the first ESV after both 1,500 CSLI and
     3,500 CSN, and before:
     
    9,500 CSN, if spool CALI is 0-7,000, or
    2,500 CSLI, if spool CALI is 7,001-8,000, or
    10,500 CSN, if spool CALI is 8,001-8,500, or
    2,000 CSLI, if spool CALI is greater than 8,500.
    ------------------------------------------------------------------------
    
    
                                    Table 26
    ------------------------------------------------------------------------
     
    -------------------------------------------------------------------------
    First piece-part or module level exposure after both 1,000 CSLI and
     3,500 CSN, but not later than the first ESV after both 1,500 CSLI and
     3,500 CSN, and before:
     
    3,500 CSLI, if spool CALI is 0-5,000, or
     8,500 CSN, if spool CALI is 5,001-5,500, or
    3,000 CSLI, if spool CALI is 5,501-6,500, or
    9,500 CSN, if spool CALI is 6,501-7,000, or
    2,500 CSLI, if spool CALI is 7,001-8,000, or
    10,500 CSN, if spool CALI is 8,001-8,500, or
    2,000 CSLI, if spool CALI is greater than 8,500.
    ------------------------------------------------------------------------
    
        (iii) Thereafter, inspect HPCR stage 3-9 spools at intervals not 
    to exceed the earliest occurrence shown in Table 24, Table 25, or 
    Table 26 of this AD, as applicable, based on the elapsed calendar 
    time from the effective date of this AD, as specified in paragraph 
    (e)(2)(vi ) of this AD.
        (iv) Remove from service prior to further flight HPCR stage 3-9 
    spools that equal or exceed the reject criteria established by GE 
    CF6-80E1 ASB No. 72-A135, Original, dated August 13, 1998, and 
    replace with a serviceable part.
        (v) HPCR stage 3-9 spools with a CSN of 10,500 or greater may 
    not be put back in service after an ESV.
        (vi) Use the Tables as follows:
        (A) Use Table 24 from the effective date of this AD to 18 months 
    from the effective date of this AD.
        (B) Use Table 25 after 18 months from the effective date of this 
    AD to 36 months from the effective date of this AD.
        (C) Use Table 26 after 36 months from the effective date of this 
    AD.
        (3) Eddy current and ultrasonic inspect for cracks HPCR stage 3-
    9 spools with P/N 1782M22G04 installed in GE CF6-80E1 series 
    engines. Perform the inspections in accordance GE CF6-80E1 ASB No. 
    72-A135, Original, dated August 13, 1998, as follows:
        (i) For HPCR stage 3-9 spools that have not been previously 
    inspected in accordance with any of the service documents listed in 
    Table 24 of this AD, inspect at first piece-part exposure after both 
    1,000 CSN and the effective date of this AD.
        (ii) Thereafter, inspect at first piece part exposure after both 
    1,000 CSLI and 3,500 CSN.
    
    [[Page 65146]]
    
        (iii) Remove from service prior to further flight HPCR stage 3-9 
    spools that equal or exceed the reject criteria established by GE 
    CF6-80E1 ASB No. 72-A135, Original, dated August 13, 1998, and 
    replace with a serviceable part.
        (f) Report within 5 calendar days of inspection the results of 
    inspections that equal or exceed the reject criteria to: William 
    Ricci, Aerospace Engineer, Engine Certification Office, FAA, Engine 
    and Propeller Directorate, 12 New England Executive Park, 
    Burlington, MA 01803-5299; telephone (718) 238-7742, fax (781) 238-
    7199, as follows:
        (1) Engine model in which the HPCR stage 3-9 spool was 
    installed;
        (2) P/N;
        (3) S/N;
        (4) Part CSN;
        (5) Part CSLI;
        (6) Date and location of inspection.
    Reporting requirements have been approved by the Office of 
    Management and Budget and assigned OMB control number 2120-0056.
        (g) For the purpose of this AD, a serviceable part for 
    installation in an engine is defined as an HPCR stage 3-9 spool with 
    less than 1,000 CSN or with less than 1,000 CSLI, in accordance with 
    the inspection and pass/fail criteria contained in the applicable 
    service documents or combinations of service documents provided by 
    Table 27 of this AD.
    
                                    Table 27
    ------------------------------------------------------------------------
     
    -------------------------------------------------------------------------
    GE CF6-50 SB No. 72-888, Revision 3, dated January 31, 1991,
    GE CF6-50 SB No. 72-888, Revision 4, dated March 28, 1991,
    GE CF6-50 SB No. 72-888, Revision 5, dated November 7, 1994,
    GE CF6-50 SB No. 72-888, Revision 6, dated December 22, 1995,
    GE CF6-50 SB No. 72-1000, Original, dated December 14, 1990,
    GE CF6-50 SB No. 72-1000, Revision 1, dated March 28, 1991,
    GE CF6-50 SB No. 72-1000, Revision 2, dated September 9, 1993,
    GE CF6-50 SB No. 72-1000, Revision 3, dated December 22, 1995,
    GE CF6-50 SB No. 72-1108, Original, dated November 6, 1995,
    GE CF6-50 SB No. 72-1108, Revision 1, dated July 29, 1996,
    GE CF6-80A SB No. 72-500, Revision 3, dated March 19, 1991,
    GE CF6-80A SB No. 72-500, Revision 4, dated July 1, 1991,
    GE CF6-80A SB No. 72-500, Revision 5, dated November 7, 1994,
    GE CF6-80A SB No. 72-500, Revision 6, dated December 22, 1995,
    GE CF6-80A SB No. 72-583, Original, dated December 20, 1990,
    GE CF6-80A SB No. 72-583, Revision 1, dated March 18, 1991,
    GE CF6-80A SB No. 72-583, Revision 2, dated July 15, 1991,
    GE CF6-80A SB No. 72-583, Revision 3, dated July 24, 1991,
    GE CF6-80A SB No. 72-583, Revision 4, dated September 15, 1993,
    GE CF6-80A SB No. 72-583, Revision 5, dated December 22, 1995,
    GE CF6-80A SB No. 72-678, Original, dated November 6, 1995,
    GE CF6-80A SB No. 72-678, Revision 1, dated July 29, 1996,
    GE CF6-80C2 SB No. 72-418, Revision 2, May 14, 1991,
    GE CF6-80C2 SB No. 72-418, Revision 3, November 7, 1994,
    GE CF6-80C2 SB No. 72-418, Revision 4, December 22, 1995,
    GE CF6-80C2 SB No. 72-758, Original, dated November 7, 1994,
    GE CF6-80C2 SB No. 72-758, Revision 1, dated December 22, 1995,
    GE CF6-80C2 SB No. 72-812, Original, dated November 6, 1995,
    GE CF6-80C2 SB No. 72-812, Revision 1, dated January 30, 1998,
    GE CF6-80E1 ASB No. 72-A135, Original, dated August 13, 1998,
     
    Either any one of the following:
     
    CF6 Standard Practice Manual GEK9250 Procedures 70-32-09, Revision 71,
     dated October 1, 1995,
    CF6 Standard Practice Manual GEK9250 Procedures 70-32-09, Revision 72,
     dated November 15, 1996,
    CF6 Standard Practice Manual GEK9250 Procedures 70-32-09, Revision 74,
     dated May 1, 1998,
     
    and any one of the following:
     
    CF6 Standard Practice Manual GEK9250 Procedures 70-32-10, Revision 71,
     dated October 1, 1995,
    CF6 Standard Practice Manual GEK9250 Procedures 70-32-10, Revision 72,
     dated November 15, 1996,
    CF6 Standard Practice Manual GEK9250 Procedures 70-32-10, Revision 74,
     dated May 1, 1998;
     
    or any one of the following:
     
    CF6 Standard Practice Manual GEK9250 Procedures 70-32-13, Revision 70-
     25, dated August 26, 1996,
    CF6 Standard Practice Manual GEK9250 Procedures 70-32-13, Revision 72,
     dated November 15, 1996,
    CF6 Standard Practice Manual GEK9250 Procedures 70-32-13, Revision 73,
     dated November 1, 1997,
     
    and any one of the following:
     
    CF6 Standard Practice Manual GEK9250 Procedures 70-32-14, Revision 70-
     26, dated August 26, 1996,
    CF6 Standard Practice Manual GEK9250 Procedure 70-32-14, Revision 72,
     dated November 15, 1996,
    CF6 Standard Practice Manual GEK9250 Procedure 70-32-14, Revision 73,
     dated November 1, 1997.
    ------------------------------------------------------------------------
    
        (h) For the purpose of this AD, core module exposure is defined 
    as separation of the fan module from the engine.
        (i) For the purpose of this AD, piece-part exposure is defined 
    as disassembly and removal of the stage 3-9 spool from the HPC rotor 
    structure, regardless of any blades, locking lugs, bolts or balance 
    weights assembled to the spool.
        (j) For the purpose of this AD, an ESV is defined as the 
    introduction of an engine into a shop where the separation of a 
    major engine flange will occur after the effective date of this AD. 
    The following maintenance actions are not considered ESVs for the 
    purpose of this AD:
        (1) Introduction of an engine into a shop solely for removal of 
    the compressor top case for airfoil maintenance;
        (2) Introduction of an engine into a shop solely for removal or 
    replacement of the Stage 1 Fan Disk;
        (3) Introduction of an engine into a shop solely for replacement 
    of the Turbine Rear Frame;
        (4) Introduction of an engine into a shop solely for replacement 
    of the Accessory and/or Transfer Gearboxes;
    
    [[Page 65147]]
    
        (5) Introduction of an engine into a shop for any combination of 
    the above specified exceptions.
        (k) An alternative method of compliance or adjustment of the 
    compliance time that provides an acceptable level of safety may be 
    used if approved by the Manager, Engine Certification Office. 
    Operators shall submit their requests through an appropriate FAA 
    Principal Maintenance Inspector, who may add comments and then send 
    it to the Manager, Engine Certification Office.
    
        Note 3: Information concerning the existence of approved 
    alternative methods of compliance with this airworthiness directive, 
    if any, may be obtained from the Engine Certification Office.
    
        (l) Special flight permits may be issued in accordance with 
    sections 21.197 and 21.199 of the Federal Aviation Regulations (14 
    CFR 21.197 and 21.199) to operate the aircraft to a location where 
    the requirements of this AD can be accomplished.
    
        Issued in Burlington, Massachusetts, on November 17, 1998.
    Jay J. Pardee,
    Manager, Engine and Propeller Directorate, Aircraft Certification 
    Service.
    [FR Doc. 98-31437 Filed 11-24-98; 8:45 am]
    BILLING CODE 4910-13-P
    
    
    

Document Information

Published:
11/25/1998
Department:
Federal Aviation Administration
Entry Type:
Proposed Rule
Action:
Notice of proposed rulemaking (NPRM).
Document Number:
98-31437
Dates:
Comments must be received by January 25, 1999.
Pages:
65136-65147 (12 pages)
Docket Numbers:
Docket No. 95-ANE-39
RINs:
2120-AA64: Airworthiness Directives
RIN Links:
https://www.federalregister.gov/regulations/2120-AA64/airworthiness-directives
PDF File:
98-31437.pdf
CFR: (1)
14 CFR 39.13