[Federal Register Volume 63, Number 227 (Wednesday, November 25, 1998)]
[Notices]
[Page 65188]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 98-31448]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP99-70-000]
Northwest Pipeline Corporation; Notice of Request Under Blanket
Authorization
November 19, 1998.
Take notice that on November 12, 1998, Northwest Pipeline
Corporation (Northwest), 295 Chipeta Way, Salt Lake City, Utah 84158,
filed in Docket No. CP99-70-000, a request pursuant to Sections 157.205
and 157.216 of the Commission's Regulations under the Natural Gas Act
(18 CFR 157.205 and 157.212) for authorization to abandon by removal
its Green Circle Farms and Lambert Farms Meter Stations in Benton and
Yakima Counties, Washington, respectively, under Northwest's blanket
certificate issued in Docket No. CP82-433-000, pursuant to Section 7(c)
of the Natural Gas Act, all as more fully set forth in the request
which is on file with the Commission and open to public inspection.
Northwest proposes to abandon the Green Circle Farms and Lambert
Farms Meter Stations because no deliveries have been made in many years
to either meter station. By letter dated September 8, 1998, Cascade
Natural Gas Corporation, the local distribution company downstream of
the meter stations, confirmed that it does not object to Northwest
abandoning and removing these two meter stations.
Northwest states the cost of removing the meter stations is
estimated to be approximately $6,400. Northwest relates that all
removed facilities will be scrapped. Northwest states it has sent a
copy of this prior notice request to the Washington Utilities and
Transportation Commission.
Any person or the Commission's staff may, within 45 days after
issuance of the instant notice by the Commission, filed with the
Federal Energy Regulatory Commission, 888 First Street, N.E.,
Washington D.C. 20426, pursuant to Rule 214 of the Commission's
Procedural Rules (18 CFR 385.214) a motion to intervene or notice of
intervention and pursuant to Section 157.205 of the Regulations under
the Natural Gas Act (18 CFR 157.205) a protest to the request. If no
protest is filed within the time allowed therefor, the proposed
activity shall be deemed to be authorized effective the day after the
time allowed for filing a protest. If a protest is filed and not
withdrawn within 30 days after the time allowed for filing a protest,
the instant request shall be treated as an application for
authorization pursuant to Section 7 of the Natural Gas Act.
Linwood A. Watson, Jr.,
Acting Secretary.
[FR Doc. 98-31448 Filed 11-24-98; 8:45 am]
BILLING CODE 6717-01-M