2014-27892. Notice of Filing of Self-Certification of Coal Capability Under the Powerplant and Industrial Fuel Use Act
-
Start Preamble
AGENCY:
Office of Electricity Delivery and Energy Reliability, DOE.
ACTION:
Notice of filing.
SUMMARY:
On October 21, 2014, Footprint Power Salem Harbor Development LP, as owner and operator of a new base load electric powerplant, submitted a coal capability self-certification to the Department of Energy (DOE) pursuant to 201(d) of the Powerplant and Industrial Fuel Use Act of 1978 (FUA), as amended, and DOE regulations in 10 CFR 501.60, 61. FUA and regulations thereunder require DOE to publish a notice of filing of self-certification in the Federal Register. 42 U.S.C. 8311(d) and 10 CFR 501.61(c).
ADDRESSES:
Copies of coal capability self-certification filings are available for public inspection, upon request, in the Office of Electricity Delivery and Energy Reliability, Mail Code OE-20, Room 8G-024, Forrestal Building, 1000 Independence Avenue SW., Washington, DC 20585.
Start Further Info Start Printed Page 70170FOR FURTHER INFORMATION CONTACT:
Christopher Lawrence at (202) 586-5260.
End Further Info End Preamble Start Supplemental InformationSUPPLEMENTARY INFORMATION:
Title II of FUA, as amended (42 U.S.C. 8301 et seq.), provides that no new base load electric powerplant may be constructed or operated without the capability to use coal or another alternate fuel as a primary energy source. Pursuant to FUA in order to meet the requirement of coal capability, the owner or operator of such a facility proposing to use natural gas or petroleum as its primary energy source shall certify to the Secretary of Energy (Secretary) prior to construction, or prior to operation as a base load electric powerplant, that such powerplant has the capability to use coal or another alternate fuel. Such certification establishes compliance with FUA section 201(a) as of the date it is filed with the Secretary. 42 U.S.C. 8311.
The following owner of a proposed new base load electric powerplant has filed a self-certification of coal-capability with DOE pursuant to FUA section 201(d) and in accordance with DOE regulations in 10 CFR 501.60, 61:
OWNER: Footprint Power Salem Harbor Development LP.
CAPACITY: 630 megawatts (MW).
PLANT LOCATION: Salem, MA.
IN-SERVICE DATE: Second quarter of 2017.
Start SignatureIssued in Washington, DC, on November 18, 2014.
Brian Mills,
Director, Permitting and Siting, Office of Electricity Delivery and Energy Reliability.
[FR Doc. 2014-27892 Filed 11-24-14; 8:45 am]
BILLING CODE 6450-01-P
Document Information
- Published:
- 11/25/2014
- Department:
- Energy Department
- Entry Type:
- Notice
- Action:
- Notice of filing.
- Document Number:
- 2014-27892
- Dates:
- Second quarter of 2017.
- Pages:
- 70169-70170 (2 pages)
- Docket Numbers:
- Certification Notice-230
- PDF File:
- 2014-27892.pdf
- Supporting Documents:
- » Request for Information: Collection, Transportation, Sorting, Processing and Second Life Applications for End-of-Life Lithium Ion Batteries
- » Request for Information: Grid Resilience and Innovation Partnerships Program
- » Agency Information Collection Activities; Proposals, Submissions, and Approvals
- » Worker Safety and Health Program
- » Agency Information Collection Activities; Proposals, Submissions, and Approvals
- » Application: NRG Power Marketing, LLC
- » Application: Command Power Corp.
- » Agency Information Collection Activities; Proposals, Submissions, and Approvals: Weatherization Assistance Program
- » Agency Information Collection Activities; Proposals, Submissions, and Approvals