2019-25625. Spencer Mountain Hydropower, LLC; Notice of Application Accepted for Filing, Soliciting Comments, Protests and Motions To Intervene  

  • Start Preamble

    Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection:

    a. Type of Proceeding: Extension of License Term.

    b. Project No.: P-2607-014.

    c. Date Filed: October 23, 2019.

    d. Licensee: Spencer Mountain Hydropower, LLC.

    e. Name and Location of the Project: The Spencer Mountain Project is located on the South Fork Catawba River, a tributary of the Catawba River, in Gaston County, North Carolina.

    f. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.

    g. Licensee Contact Information: Kevin Edwards and Amy Edwards, 916 Comer Rd., Stoneville, NC 27048, (336) 589-6138, smhydro@pht1.com.

    h. FERC Contact: Kim Nguyen, (202) 502-6105, Kim.Nguyen@ferc.gov.

    i. Deadline for filing comments, motions to intervene and protests is 30 days from the issuance date of this notice by the Commission. The Commission strongly encourages electronic filing. Please file motions to intervene, protests, comments, and recommendations, using the Commission's eFiling system at http://www.ferc.gov/​docs-filing/​efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at http://www.ferc.gov/​docs-filing/​ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. The first page of any filing should include docket number P-2607-014.

    j. Description of Proceeding: Spencer Mountain Hydropower, LLC filed an application to extend the license terms for the Spencer Mountain Hydroelectric Project. The licensee requests that the license term for the project be extended to July 1, 2035 to comport with the Commission's new policy for default licensing term of 40 years. Currently the license will expire on July 1, 2025.

    k. This notice is available for review and reproduction at the Commission in the Public Reference Room, Room 2A, 888 First Street NE, Washington, DC 20426. The filing may also be viewed on the Commission's website at http://www.ferc.gov/​docs-filing/​elibrary.asp. Enter the Docket number (P-2607-014) excluding the last three digits in the docket number field to access the notice. You may also register online at http://www.ferc.gov/​docs-filing/​esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, call toll-free 1-866-208-3676 or email FERCOnlineSupport@ferc.gov. For TTY, call (202) 502-8659.

    l. Individuals desiring to be included on the Commission's mailing list should so indicate by writing to the Secretary of the Commission.

    m. Comments, Protests, or Motions to Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the Start Printed Page 65150requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, and .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission's Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application.

    n. Filing and Service of Responsive Documents: Any filing must (1) bear in all capital letters the title COMMENTS, PROTEST, or MOTION TO INTERVENE as applicable; (2) set forth in the heading the name of the applicant(s) and the project number(s) of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, motions to intervene, or protests must set forth their evidentiary basis and otherwise comply with the requirements of 18 CFR 4.34(b). All comments, motions to intervene, or protests should relate to the requests to extend the license terms. Agencies may obtain copies of the applications directly from the applicants. A copy of any protest or motion to intervene must be served upon each representative of the applicant specified in the particular application. If an intervener files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. A copy of all other filings in reference to these applications must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.

    Start Signature

    Dated: November 20, 2019.

    Nathaniel J. Davis, Sr.,

    Deputy Secretary.

    End Signature End Preamble

    [FR Doc. 2019-25625 Filed 11-25-19; 8:45 am]

    BILLING CODE 6717-01-P

Document Information

Published:
11/26/2019
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
2019-25625
Pages:
65149-65150 (2 pages)
Docket Numbers:
Project No. 2607-014
PDF File:
2019-25625.pdf