97-31180. Southern Company Services, Inc., et al.; Electric Rate and Corporate Regulation Filings  

  • [Federal Register Volume 62, Number 229 (Friday, November 28, 1997)]
    [Notices]
    [Pages 63323-63327]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 97-31180]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    
    Federal Energy Regulatory Commission
    [Docket No. ER96-1794-002, et al.]
    
    
    Southern Company Services, Inc., et al.; Electric Rate and 
    Corporate Regulation Filings
    
    November 20, 1997.
        Take notice that the following filings have been made with the 
    Commission:
    
    1. Southern Company Services, Inc.
    
    [Docket No. ER96-1794-002]
    
        Take notice that on October 24, 1997, Southern Company Services, 
    Inc., tendered for filing its refund report in the above-referenced 
    docket.
        Comment date: December 4, 1997, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    2. Allegheny Power
    
    [Docket No. DR98-04-000]
    
        Take notice that on October 28, 1997, Allegheny Power, filed on 
    behalf of West Penn Power Company, an Application for approval of 
    depreciation rates pursuant to Section 302 of the Federal Power Act. 
    The proposed depreciation rates are for accounting purposes only. 
    Allegheny Power states that the proposed West Penn new depreciation 
    rates were approved for retail purposes by the Pennsylvania Public 
    Utility Commission as of January 1, 1997. Allegheny Power requests that 
    the Commission allow the proposed depreciation rates to become 
    effective on January 1, 1997.
        Comment date: December 15, 1997, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    3. Potomac Electric Power Company
    
    [Docket No. ER96-929-000]
    
        Take notice that on November 7, 1997, Potomac Electric Company 
    (PEPCO), tendered for filing a letter informing the Commission that 
    prior to the effective date of the settlement in this docket, PEPCO 
    provided no transmission service at rates in excess of the settlement 
    rates, and therefore, no refunds are due.
        Comment date: December 4, 1997, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    4. Northeast Utilities Service Company
    
    [Docket No. ER98-456-000]
    
        Take notice that on October 31, 1997, Northeast Utilities Service 
    Company (NUSCO), tendered for filing, a Service Agreement with DPL 
    Energy, Inc., under the NU System Companies' Sale for Resale, Tariff 
    No. 6.
    
    [[Page 63324]]
    
        NUSCO states that a copy of this filing has been mailed to DPL 
    Energy, Inc.
        NUSCO requests that the Service Agreement become effective October 
    28, 1997.
        Comment date: December 4, 1997, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    5. PP&L, Inc.
    
    [Docket No. ER98-457-000]
    
        Take Notice that on October 31, 1997, PP&L, Inc., (formerly known 
    as Pennsylvania Power & Light Company) (PP&L), filed a Service 
    Agreement dated October 28, 1997, with Southern Company Services, Inc., 
    as agent for Alabama Power Company, Georgia Power Company, Gulf Power 
    Company, Mississippi Power Company, and Savannah Electric and Power 
    Company (SCSI), under PP&L's FERC Electric Tariff, Original Volume No. 
    5. The Service Agreement adds SCSI as an eligible customer under the 
    Tariff.
        PP&L requests an effective date of October 31, 1997, for the 
    Service Agreement.
        PP&L states that copies of this filing have been supplied to SCSI 
    and to the Pennsylvania Public Utility Commission.
        Comment date: December 4, 1997, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    6. Maine Electric Power Company
    
    [Docket No. ER98-458-000]
    
        Take notice that on October 31, 1997, Maine Electric Power Company 
    (MEPCO), tendered for filing a service agreement for Non-Firm Point-to-
    Point Transmission Service entered into with NorAm Energy Services, 
    Inc. Service will be provided pursuant to MEPCO's Open Access 
    Transmission Tariff, designated rate schedule MEPCO--FERC Electric 
    Tariff, Original Volume No. 1, as supplemented.
        Comment date: December 4, 1997, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    7. Public Service Company of Colorado
    
    [Docket No. ER98-460-000]
    
        Take notice that on October 31, 1997, Public Service Company of 
    Colorado (Public Service), tendered for filing a new rate schedule for 
    service to UtiliCorp United Inc. (UtiliCorp), to be included in its 
    wholesale electric rate tariff. The new rate schedule is for additional 
    partial requirements service to UtiliCorp.
        Comment date: December 4, 1997, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    8. Northeast Utilities Service Company
    
    [Docket No. ER98-461-000]
    
        Take notice that on October 31, 1997, Northeast Utilities Service 
    Company (NUSCO), on behalf of its affiliates The Connecticut Light & 
    Power Company and Public Service Company of New Hampshire, tendered for 
    filing a request for a rate schedule change to the following rate 
    schedule: CL&P FERC Rate Schedule No. 2.
        NUSCO states that a copy of this filing has been mailed to The 
    Reading Municipal Light Department and the Massachusetts Department of 
    Public Utilities.
        Comment date: December 4, 1997, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    9. Southern California Edison Company
    
    [Docket No. ER98-462-000]
    
        Take notice that on October 31, 1997, Southern California Edison 
    Company (Edison), tendered for filing a change in rate for scheduling 
    and dispatching services as embodied in Edison's agreements with the 
    following entities:
    
    ------------------------------------------------------------------------
                Entity                     FERC rate schedule number        
    ------------------------------------------------------------------------
    1. City of Anaheim...........  130, 246.6, 246.8, 246.13, 246.29,       
                                    246.32.1, 246.33.1, 246.36.             
    2. City of Azusa.............  160, 247.4, 247.6, 247.8, 247.24, 247.29,
                                    247.29.6.                               
    3. City of Banning...........  159, 248.5, 248.7, 248.24, 248.29,       
                                    248.29.8, 248.37.                       
    4. City of Colton............  162, 249.4, 249.6, 249.8, 249.24, 249.29.
    5. City of Riverside.........  129, 250.6, 250.8, 250.10, 250.15,       
                                    250.21, 250.27, 250.30, 250.35, 250.41, 
                                    250.44, 250.46, 250.50.                 
    6. City of Vernon............  149, 154.24, 172, 207, 272, 276.         
    7. Arizona Electric Power      132, 161.                                
     Cooperative.                                                           
    8. Arizona Public Service      185, 348.                                
     Company.                                                               
    9. California Department of    112, 113, 181, 342.                      
     Water Resources.                                                       
    10. City of Burbank..........  166.                                     
    11. City of Glendale.........  143.                                     
    12. City of Los Angeles        102, 118, 140, 141, 163, 188.            
     Department of Water and                                                
     Power.                                                                 
    13. City of Pasadena.........  158.                                     
    14. Coastal Electric Services  347.                                     
     Company.                                                               
    15. Imperial Irrigation        259, 268.                                
     District.                                                              
    16. Metropolitan Water         292.                                     
     District of Southern                                                   
     California.                                                            
    17. M-S-R Public Power Agency  153, 339.                                
    18. Northern California Power  240.                                     
     Agency.                                                                
    19. Pacific Gas and Electric   117, 147, 256, 318.                      
     Company.                                                               
    20. PacifiCorp...............  275.                                     
    21. Rainbow Energy Marketing   346.                                     
     Corporation.                                                           
    22. San Diego Gas & Electric   151.                                     
     Company.                                                               
    23. Southern California Water  349.3.                                   
     Company.                                                               
    24. Western Area Power         120.                                     
     Administration.                                                        
    ------------------------------------------------------------------------
    
        Edison requests that the revised rate for these services be made 
    effective January 1, 1998.
        Copies of this filing were served upon the Public Utilities 
    Commission of the State of California and all interested parties.
        Comment date: December 4, 1997, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    10. Metropolitan Edison Company Pennsylvania Electric Company
    
    [Docket No. ER98-464-000]
    
        Take notice that on October 31, 1997, Metropolitan Edison Company 
    and Pennsylvania Electric Company (d/b/a
    
    [[Page 63325]]
    
    GPU Energy) filed executed Retail Transmission Service Agency 
    Agreements between GPU Energy and (1) NorAm Energy Management, Inc., 
    dated October 22, 1997; (2) DuPont Power Marketing, Inc., dated October 
    22, 1997; (3) Energis Resources, Inc., dated October 22, 1997; (4) PP&L 
    d/b/a PP&L EnergyPlus dated October 17, 1997; (5) GPU Advanced 
    Resources dated October 14, 1997; (6) CNG Retail Services Corporation 
    dated October 17, 1997; (7) Delmarva Power & Light Company d/b/a 
    Conectiv Energy dated October 23, 1997; and (8) QST Energy Trading, 
    Inc., dated October 23, 1997.
        GPU Energy requests a waiver of the Commission's notice 
    requirements for good cause shown and an effective date of November 1, 
    1997, for the Retail Transmission Service Agency Agreements.
        GPU Energy will be serving a copy of the filing on the Pennsylvania 
    Public Utility Commission.
        Comment date: December 4, 1997, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    11. Northern Indiana Public Service Company
    
    [Docket No. ER98-465-000]
    
        Take notice that on October 31, 1997, Northern Indiana Public 
    Service Company, tendered for filing an executed Sales Service 
    Agreement and an executed Standard Transmission Service Agreement for 
    Non-Firm Point-to-Point Transmission Service between Northern Indiana 
    Public Service Company and The Energy Authority, Inc.
        Under the Transmission Service Agreement, Northern Indiana Public 
    Service Company will provide Point-to-Point Transmission Service to The 
    Energy Authority, Inc., pursuant to the Transmission Service Tariff 
    filed by Northern Indiana Public Service Company in Docket No. OA96-47-
    000 and allowed to become effective by the Commission. Under the Sales 
    Service Agreement, Northern Indiana Public Service Company will provide 
    general purpose energy and negotiated capacity to The Energy Authority, 
    Inc., pursuant to the Wholesale Sales Tariff field by Northern Indiana 
    Public Service Company in Docket No. ER95-1222-000 as amended by the 
    Commission's order in Docket No. ER97-458-000 and allowed to become 
    effective by the Commission. Northern Indiana Public Service Company 
    has requested that the Service Agreements be allowed to become 
    effective as of October 31, 1997.
        Copies of this filing have been sent to the Indiana Utility 
    Regulatory Commission and the Indiana Office of Utility Consumer 
    Counselor.
        Comment date: December 4, 1997, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    12. Virginia Electric and Power Company
    
    [Docket No. ER98-467-000]
    
        Take notice that on October 31, 1997, Virginia Electric and Power 
    Company, tendered for filing three executed agreements with Old 
    Dominion Electric Cooperative: an amended Interconnection and 
    Operations Agreement, a Network Integration Transmission Agreement and 
    a Network Operating Agreement.
        Comment date: December 4, 1997, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    13. PECO Energy Company
    
    [Docket No. ER98-484-000]
    
        Take notice that on October 31, 1997, PECO Energy Company (PECO) 
    filed an executed Transmission Agency Agreement between PECO and 
    Eastern Group (hereinafter Supplier). The terms and conditions 
    contained within this Agreement are identical to the terms and 
    conditions contained with the Form of Transmission Agency Agreement 
    submitted to the Commission on October 3, 1997, as part of the joint 
    filing by the Pennsylvania Public Utility Commission and the 
    Pennsylvania PJM Utilities at Docket No. ER98-64-000. This filing 
    merely submits an individual executed copy of the Transmission Agency 
    Agreement between PECO and an alternative supplier participating in 
    PECO's Retail Access Pilot Program.
        Copies of the filing were served on the Supplier and the 
    Pennsylvania Public Utility Commission.
        Comment date: December 4, 1997, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    14. PECO Energy Company
    
    [Docket No. ER98-485-000]
    
        Take notice that on October 31, 1997, PECO Energy Company (PECO) 
    filed an executed Installed Capacity Obligation Allocation Agreement 
    between PECO and Eastern Group (hereinafter Supplier). The terms and 
    conditions contained within this Agreement are identical to the terms 
    and conditions contained with the Form of Installed Capacity Allocation 
    Agreement filed by PECO with the Commission on October 3, 1997, at 
    Docket No. ER98-28-000. This filing merely submits an individual 
    executed copy of the Installed Capacity Obligation Allocation Agreement 
    between PECO and an alternate supplier participating in PECO's Pilot.
        Copies of the filing were served on the Supplier and the 
    Pennsylvania Public Utility Commission.
        Comment date: December 4, 1997, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    15. Cinergy Services, Inc.
    
    [Docket No. ER98-488-000]
    
        Take notice that on October 31, 1997, Cinergy Services, Inc., on 
    behalf of its Operating Company affiliates, The Cincinnati Gas & 
    Electric Company and PSI Energy, Inc., (collectively referred to as 
    Cinergy), tendered for filing a Power Service Agreement between Cinergy 
    and the city of Bristol, Virginia (Bristol) as a Service Agreement for 
    a long-term market based sale in fulfillment of requirements imposed on 
    Cinergy by Order dated November 15, 1996, in Docket No. ER96-2506-000 
    or, in the alternative, as an original rate schedule. Cinergy has 
    requested an effective date of January 1, 1998, for the Power Service 
    Agreement.
        Copies of the filing have been served on the Bristol Virginia 
    Utilities Board, the State Corporation Commission of Virginia and the 
    parties to Docket No. ER96-2506-000.
        Comment date: December 4, 1997, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    16. Northern States Power Company (Minnesota); Northern States Power 
    Company (Wisconsin)
    
    [Docket No. ER98-489-000]
    
        Take notice that on October 31, 1997, Northern States Power Company 
    (Minnesota) and Northern States Power Company (Wisconsin) jointly 
    tendered for filing the existing Exhibit VII and revised Exhibits VIII 
    and IX to the Agreement to Coordinate Planning and Operations and 
    Interchange Power and Energy between Northern States Power Company 
    (Minnesota) and Northern States Power Company (Wisconsin) (Interchange 
    Agreement). The Interchange Agreement is NSP (Minnesota) FERC Rate 
    Schedule No. 437 and NSP (Wisconsin) FERC Rate Schedule No. 73.
        The NSP Companies request an effective date of January 1, 1998, 
    sixty-two days after filing, without suspension. Copies of the filing 
    letter and Exhibits VII, VIII and IX have been served upon the 
    wholesale and wheeling customers of the Companies. Copies of the filing 
    have also been mailed to the State Commissions of Michigan, Minnesota, 
    North Dakota, South Dakota and Wisconsin.
        Comment date: December 4, 1997, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    [[Page 63326]]
    
    17. Additional Signatories to PJM Interconnection, L.L.C. Operating 
    Agreement
    
    [Docket No. ER98-490-000]
    
        Take notice that on October 30, 1997, the PJM Interconnection, 
    L.L.C. (PJM), filed, on behalf of the Members of the LLC, membership 
    applications of Cinergy Resources, Inc., GPU Advanced Resources, The 
    Power Company of America, L.P., and UGI Power Supply, Inc. PJM requests 
    an effective date of October 31, 1997.
        Comment date: December 4, 1997, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    18. Additional Signatories to PJM Interconnection, L.L.C. Operating 
    Agreement
    
    [Docket No. ER98-491-000]
    
        Take notice that on October 31, 1997, the PJM Interconnection, 
    L.L.C. (PJM), filed, on behalf of the Members of the LLC, membership 
    application of Horizon Energy. PJM requests an effective date of 
    November 1, 1997.
        Comment date: December 4, 1997, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    19. Additional Signatories to PJM Interconnection, L.L.C. Operating 
    Agreement
    
    [Docket No. ER98-492-000]
    
        Take notice that on October 31, 1997, the PJM Interconnection, 
    L.L.C. (PJM), filed, on behalf of the Members of the LLC, membership 
    applications of DTE-Energy Trading and DTE-CoEnergy. PJM requests an 
    effective date of November 1, 1997.
        Comment date: December 4, 1997, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    20. San Diego Gas & Electric Company
    
    [Docket No. ER98-497-000]
    
        Take notice that on October 31, 1997, San Diego Gas & Electric 
    Company (SDG&E), tendered for filing seven (7) Service Agreements for 
    wholesale distribution service provided by SDG&E as a distribution 
    service provider to SDG&E's combustion turbines. SDG&E requests that 
    the proposed Service Agreements be made effective no later than January 
    1, 1998.
        SDG&E states that the Service Agreements specify rates, terms, and 
    conditions under which SDG&E will use its own distribution system to 
    make wholesale sales of electric power to the California Independent 
    System Operator or the California Power Exchange in the restructured 
    California marketplace. The form of these Service Agreements was filed 
    by SDG&E on August 15, 1997 in Docket No. ER97-4235-000.
        Comment date: December 4, 1997, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    21. Rocky Mountain Reserve Group
    
    [Docket No. ER98-498-000]
    
        Take notice that on October 31, 1997, Public Service Company of 
    Colorado (PSCO), on behalf of itself, Black Hills Corporation operating 
    as Black Hills Power and Light Company and the WestPlains Energy 
    division of UtiliCorp United Inc., filed the Articles of Incorporation, 
    Bylaws and initial Policies for the Rocky Mountain Reserve Group.
        PSCO requests an effective date of January 1, 1998.
        Copies of the filing have been served on the regulatory commissions 
    in Colorado, Nebraska, South Dakota, Utah and Wyoming.
        Comment date: December 4, 1997, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    22. Northeast Utilities Service Company
    
    [Docket No. ER98-501-000]
    
        Take notice that on October 31, 1997, Northeast Utilities Service 
    Company (NUSCO), on behalf of The Connecticut Light and Power Company, 
    Western Massachusetts Electric Company, Holyoke Water Power Company, 
    Holyoke Power and Electric Company and Public Service Company of New 
    Hampshire (collectively, the NU System Companies), hereby respectfully 
    requests that the Commission grant the NU System Companies a 30 day 
    extension of time to file the quarterly transaction report of NUSCO's 
    activity under the NU System Companies' Tariff No. 7 for the quarter 
    ending September 30, 1997.
        Comment date: December 4, 1997, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    23. Montaup Electric Company
    
    [Docket No. ER98-502-000]
    
        Take notice that on October 31, 1997, Montaup Electric Company 
    (Montaup) filed revisions to its open access transmission tariff which 
    (a) provide for retail transmission and subtransmission service within 
    the service territory of the Pascoag, Rhode Island, Fire District, and 
    (b) provide Pascoag with a revenue credit against its tariff payments 
    for network transmission service in the amount of any revenues 
    collected by Montaup for retail transmission and subtransmission 
    service. Montaup requests that these tariff revisions be allowed to 
    become effective on January 1, 1998.
        Comment date: December 4, 1997, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    24. Louisville Gas and Electric Company
    
    [Docket No. ER98-503-000]
    
        Take notice that on November 3, 1997, Louisville Gas and Electric 
    Company, tendered for filing copies of service agreements between 
    Louisville Gas and Electric Company and Electric Clearinghouse, Inc., 
    under Rate GSS.
        Comment date: December 4, 1997, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    25. New West Energy Corporation
    
    [Docket No. ER98-504-000]
    
        Take notice that on October 31, 1997, New West Energy Corporation 
    (New West) tendered for filing, pursuant to Rule 205, 18 CFR 385.205, a 
    petition for waivers and blanket approvals under various regulations of 
    the Commission, and requests that the Commission waive the 60-day 
    notice requirement so that its FERC Electric Rate Schedule No. 1, can 
    become effective on the first day following the filing.
        New West intends to engage in electric power and energy 
    transactions as a power marketer and, potentially, as a broker. In 
    transactions where New West sells wholesale electric power and energy, 
    it proposes to make such sales at rates, terms and conditions to be 
    mutually agreed to with the purchasing party. As outlined in the 
    application, New West is an affiliate of the Salt River Project 
    Agricultural Improvement and Power District, an agricultural 
    improvement district organized and existing under the laws of the State 
    of Arizona.
        Comment date: December 4, 1997, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    26. Allegheny Power Service Corporation, on behalf of Monongahela Power 
    Company, The Potomac Edison Company and West Penn Power Company 
    (Allegheny Power)
    
    [Docket No. ER98-505-000]
    
        Take notice that on November 3, 1997, Allegheny Power Service 
    Corporation on behalf of Monongahela Power Company, The Potomac Edison 
    Company and West Penn Power Company (Allegheny Power) filed Supplement 
    No. 34 to add eight (8) new Customers to the Standard Generation 
    Service Rate Schedule under which Allegheny Power offers standard 
    generation and emergency service on an hourly, daily, weekly, monthly 
    or yearly basis. Allegheny Power requests a
    
    [[Page 63327]]
    
    waiver of notice requirements to make service available as of November 
    1, 1997, to Allegheny Energy Solutions, Inc., Avista Energy, Inc., DTE 
    Energy Trading, Inc., Delmarva Power & Light Company, Energis Resources 
    Incorporated, Horizon Energy Company, Penn Power Energy, and Woodruff 
    Energy.
        Copies of the filing have been provided to the Public Utilities 
    Commission of Ohio, the Pennsylvania Public Utility Commission, the 
    Maryland Public Service Commission, the Virginia State Corporation 
    Commission, the West Virginia Public Service Commission, and all 
    parties of record.
        Comment date: December 4, 1997, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    27. Pacific Gas and Electric Company
    
    [Docket No. ER98-556-000]
    
        Take notice that on October 31, 1997, Pacific Gas and Electric 
    Company (PG&E), tendered for filing proposed formula rate tariff 
    language to recover from PG&E's existing wholesale power customers a 
    portion of the California Power Exchange (PX) Administrative Charge. 
    PG&E requests that its filing be made effective at the same time the 
    separately filed Restated PX Tariff is made effective.
        This filing is part of the comprehensive restructuring proposal for 
    the California electric power industry that is being filed with the 
    Federal Energy Regulatory Commission. Copies of this filing have been 
    served upon the California Public Utilities Commission and all other 
    parties listed as PG&E's existing wholesale power customers in this 
    filing.
        Comment date: December 4, 1997, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    28. Pacific Gas and Electric Company
    
    [Docket No. ER98-557-000]
    
        Take notice that on October 31, 1997, Pacific Gas and Electric 
    Company (PG&E), tendered for filing proposed formula rate tariff 
    language to recover from PG&E's existing wholesale transmission 
    customers and the Bay Area Rapid Transit District a portion of the 
    California Independent System Operator (ISO) Grid Management Charge. 
    PG&E requests that its filing be made effective at the same time the 
    separately filed Restated ISO Tariff is made effective.
        This filing is part of the comprehensive restructuring proposal for 
    the California electric power industry that is being filed with the 
    Federal Energy Regulatory Commission. Copies of this filing have been 
    served upon the California Public Utilities Commission and all other 
    parties listed as PG&E's existing transmission customers in this 
    filing.
        Comment date: December 4, 1997, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    29. Central Maine Power Company
    
    [Docket No. ES98-6-000]
    
        Take notice that on November 10, 1997, Central Maine Power Company 
    filed an application with the Commission pursuant to Section 204, of 
    the Federal Power Act, seeking authority to issue and renew on or 
    before February 29, 2000, Bank Loans, Commercial Paper and Medium-Term 
    Notes maturing one year or less after the date of issuance in an 
    aggregate face amount not exceeding $130,000,000 outstanding at any one 
    time.
        Comment date: December 9, 1997, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    30. Aroostook Valley Electric Company
    
    [Docket No. ES98-8-000]
    
        Take notice that on November 13, 1997, Aroostook Valley Electric 
    Company filed an Application under Section 204 of the Federal Power Act 
    seeking authority to issue and renew on or before March 1, 2000, bank 
    loans maturing one year or less after the date of issuance in an 
    aggregate face amount not exceeding $5,000,000.
        Comment date: December 15, 1997, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    31. Long Island Lighting Company
    
    [Docket No. OA98-5-000]
    
        Take notice that Long Island Lighting Company (LILCO) on November 
    4, 1997, tendered an amended filing in the above-referenced docket to 
    make certain modifications to LILCO's Power Sales Tariff (filed with 
    the Commission on August 10, 1995, as amended on April 4, 1996) in 
    order to comply with Order Nos. 888 and 888A and with LILCO's Open 
    Access Transmission Tariff (OATT), the settlement rates, terms and 
    conditions of which were approved by the Commission on May 14, 1997, in 
    Docket No. OA96-38-000.
        Copies of this filing have been served by LILCO on the New York 
    State Public Service Commission and on the existing purchasers who have 
    executed service agreements under LILCO's Power Sales Tariff and on 
    prospective purchasers under LILCO's Tariff.
        Comment date: December 8, 1997, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    32. Ohio Edison Company, Pennsylvania Power Company, The Cleveland 
    Electric Illuminating Co. and The Toledo Edison Company
    
    [Docket No. OA98-6-000]
    
        Take notice that on November 7, 1997, Ohio Edison Company, 
    Pennsylvania Power Company, The Cleveland Electric Illuminating 
    Company, and The Toledo Edison Company tendered for filing the 
    Standards of Conduct for the FirstEnergy operating companies effective 
    November 8, 1997. The FirstEnergy Standards of Conduct supersedes the 
    individual Standards of Conduct previously submitted by Ohio Edison 
    Company and Centerior Energy Corporation.
        Comment date: December 8, 1997, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    Standard Paragraph
    
        E. Any person desiring to be heard or to protest said filing should 
    file a motion to intervene or protest with the Federal Energy 
    Regulatory Commission, 888 First Street, N.E., Washington, D.C. 20426, 
    in accordance with Rules 211 and 214 of the Commission's Rules of 
    Practice and Procedure (18 CFR 385.211 and 18 CFR 385.214). All such 
    motions or protests should be filed on or before the comment date. 
    Protests will be considered by the Commission in determining the 
    appropriate action to be taken, but will not serve to make protestants 
    parties to the proceeding. Any person wishing to become a party must 
    file a motion to intervene. Copies of this filing are on file with the 
    Commission and are available for public inspection.
    Linwood A. Watson, Jr.,
    Acting Secretary.
    [FR Doc. 97-31180 Filed 11-25-97; 8:45 am]
    BILLING CODE 6717-01-P
    
    
    

Document Information

Published:
11/28/1997
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
97-31180
Dates:
December 4, 1997, in accordance with Standard Paragraph E at the end of this notice.
Pages:
63323-63327 (5 pages)
Docket Numbers:
Docket No. ER96-1794-002, et al.
PDF File:
97-31180.pdf