E5-6527. Request for Comments  

  • Start Preamble

    AGENCY:

    Federal Railroad Administration, DOT.

    ACTION:

    Notice and request for comments.

    SUMMARY:

    In compliance with the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.), this notice announces that the Information Collection Requirements (ICRs) abstracted below have been forwarded to the Office of Management and Budget (OMB) for review and comment. The ICRs describe the nature of the information collections and their expected burdens. The Federal Register notice with a 60-day comment period soliciting comments on the following collections of information was published on September 16, 2005 (70 FR 54798).

    DATES:

    Comments must be submitted on or before December 28, 2005.

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    Mr. Robert Brogan, Office of Safety, Planning and Evaluation Division, RRS-21, Federal Railroad Administration, 1120 Vermont Ave., NW., Mail Stop 17, Washington, DC 20590 (telephone: (202) 493-6292), or Mr. Victor Angelo, Office of Support Systems, RAD-20, Federal Railroad Administration, 1120 Vermont Ave., NW., Mail Stop 35, Washington, DC 20590 (telephone: (202) 493-6470). (These telephone numbers are not toll-free.)

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    The Paperwork Reduction Act of 1995 (PRA), Public Law 104-13, section 2, 109 Stat. 163 (1995) (codified as revised at 44 U.S.C. 3501-3520), and its implementing regulations, 5 CFR part 1320, require Federal agencies to issue two notices seeking public comment on information collection activities before OMB may approve paperwork packages. 44 U.S.C. 3506, 3507; 5 CFR 1320.5, 1320.8(d)(1), 1320.12. On September 16, 2005, FRA published a 60-day notice in the Federal Register soliciting comment on ICRs that the agency was seeking OMB approval. 70 FR 54798. FRA received no comments after issuing this 60-day notice. Accordingly, DOT announces that these information collection activities have been re-evaluated and certified under 5 CFR 1320.5(a) and forwarded to OMB for review and approval pursuant to 5 CFR 1320.12(c).

    Before OMB decides whether to approve these proposed collections of information, it must provide 30 days for public comment. 44 U.S.C. 3507(b); 5 CFR 1320.12(d). Federal law requires OMB to approve or disapprove paperwork packages between 30 and 60 days after the 30 day notice is published. 44 U.S.C. 3507(b)-(c); 5 CFR 1320.12(d); see also 60 FR 44978, 44983, Aug. 29, 1995. OMB believes that the 30 day notice informs the regulated community to file relevant comments and affords the agency adequate time to digest public comments before it renders a decision. 60 FR 44983, Aug. 29, 1995. Therefore, respondents should submit their respective comments to OMB within 30 days of publication to best ensure having their full effect. 5 CFR 1320.12(c); see also 60 FR 44983, Aug. 29, 1995.

    The summaries below describe the nature of the information collection requirements (ICRs) and the expected burden. The revised requirements are being submitted for clearance by OMB as required by the PRA.

    Title: Inspection and Maintenance Standards For Steam Locomotives.

    OMB Control Number: 2130-0505.

    Type of Request: Extension of a currently approved collection.

    Affected Public: Railroads.

    Abstract: The Locomotive Boiler Inspection Act (LBIA) of 1911 requires each railroad subject to the Act to file copies of its rules and instructions for the inspection of locomotives. The original LBIA was expanded to cover the entire steam locomotive and tender and all its parts and appurtenances. This Act then requires carriers to make inspections and to repair defects to ensure the safe operation of steam locomotives. The collection of information is used by tourist or historic railroads and by locomotive owners/operators to provide a record for each day a steam locomotive is placed in service, as well as a record that the required steam locomotive inspections are completed. Additionally, the collection of information is used by FRA Federal inspectors to verify that necessary safety inspections and tests have been completed, and to ensure that steam locomotives are indeed “safe and suitable” for service and are properly operated and maintained.

    Annual Estimated Burden Hours: 314 hours.

    Title: Railroad Rehabilitation and Improvement Financing Program.

    OMB Control Number: 2130-0548.

    Type of Request: Extension of a currently approved collection.

    Affected Public: State and local governments, government sponsored authorities and corporations, railroads (including Amtrak), and joint ventures that include at least one railroad.

    Abstract: Prior to the enactment of the Transportation Equity Act of the 21st Century (“TEA 21”), Title V of the Railroad Revitalization and Regulatory Reform Act of 1976 (the “Act”), 45 U.S.C. 821 et seq., authorized FRA to provide railroad financial assistance through the purchase of preference shares (45 U.S.C. 825), and the issuance of loan guarantees (45 U.S.C. 831). The FRA regulations implementing the preference share program were eliminated on February 9, 1996, due to the fact that the authorization for the program expired (28 FR 4937). The FRA regulations implementing the loan guarantee provisions of Title V of the Act are contained in 49 CFR part 260. Section 7203 of TEA 21, Public Law 105-178 (June 9, 1998), replaces the existing Title V financing programs. The collection of information is used by FRA staff to determine the financial eligibility of applicants for a loan regarding eligible projects for the improvement/rehabilitation of rail equipment or facilities, the refinancing of outstanding debt for these purposes, or the development of new intermodal or railroad facilities. The aggregate unpaid principal amounts of obligations can not exceed $3.5 billion at any one time and not less than $1 billion is to be available solely for projects benefitting freight railroads other than Class I carriers.

    Annual Estimated Burden Hours: 2,213 hours.

    Start Printed Page 71370

    Title: U.S. Locational Requirement for Dispatching U.S. Rail Operations.

    OMB Control Number: 2130-0556.

    Type of Request: Extension of a currently approved collection.

    Affected Public: Railroads.

    Abstract: Part 241 requires, in the absence of a waiver, that all dispatching of railroad operations that occurs in the United States be performed in this country, with a minor exception. A railroad is allowed to conduct extraterritorial dispatching from Mexico or Canada in emergency situations, but only for the duration of the emergency. A railroad relying on the exception must provide written notification of its action to the FRA Regional Administrator of each FRA region in which the railroad operation occurs; such notification is not required before addressing the emergency situation. The information collected under this rule will be used as part of FRA's oversight function to ensure that extraterritorial dispatchers comply with applicable safety regulations.

    Annual Estimated Burden Hours: 16 hours.

    Addressee: Send comments regarding this information collection to the Office of Information and Regulatory Affairs, Office of Management and Budget, 725 Seventeenth Street, NW., Washington, DC 20503, Attention: FRA Desk Officer.

    Comments are invited on the following: Whether the proposed collections of information are necessary for the proper performance of the functions of the Department, including whether the information will have practical utility; the accuracy of the Department's estimates of the burden of the proposed information collections; ways to enhance the quality, utility, and clarity of the information to be collected; and ways to minimize the burden of the collections of information on respondents, including the use of automated collection techniques or other forms of information technology.

    A comment to OMB is best assured of having its full effect if OMB receives it within 30 days of publication of this notice in the Federal Register.

    Start Authority

    Authority: 44 U.S.C. 3501-3520.

    End Authority Start Signature

    Issued in Washington, DC on November 16, 2005.

    D.J. Stadtler,

    Director, Office of Budget, Federal Railroad Administration.

    End Signature End Supplemental Information

    [FR Doc. E5-6527 Filed 11-25-05; 8:45 am]

    BILLING CODE 4910-06-P

Document Information

Published:
11/28/2005
Department:
Federal Railroad Administration
Entry Type:
Notice
Action:
Notice and request for comments.
Document Number:
E5-6527
Dates:
Comments must be submitted on or before December 28, 2005.
Pages:
71369-71370 (2 pages)
PDF File:
e5-6527.pdf