94-29322. Hydroelectric Applications [Duke Power Company, et al.]; Applications  

  • [Federal Register Volume 59, Number 228 (Tuesday, November 29, 1994)]
    [Unknown Section]
    [Page 0]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 94-29322]
    
    
    [[Page Unknown]]
    
    [Federal Register: November 29, 1994]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    [Project Nos. 2232-303, et al.]
    
     
    
    Hydroelectric Applications [Duke Power Company, et al.]; 
    Applications
    
        Take notice that the following hydroelectric applications have been 
    filed with the Commission and are available for public inspection:
    
        1a. Type of Application: Revised Shoreline Management Plan.
        b. Project No.: 2232-303.
        c. Date Filed: October 11, 1994.
        d. Applicant: Duke Power Company.
        e. Name of Project: Catawba-Wateree Project.
        f. Location: Lakes James, Rhodhiss, Hickory, Norman, Mountain 
    Island, Wylie, Fishing Creek, Great Falls, Rocky Creek, Wateree, and 
    Lookout Shoals Lake in Burke, McDowell, Caldwell, Alexander, Catawba, 
    Iredell, Mecklenburg, Lincoln, and Gaston Counties, N.C., and York, 
    Lancaster, Chester, Fairfield, and Kershaw Counties, S.C.
        g. Filed Pursuant to: Federal Power Act, 16 U.S.C. Section 791(a)-
    825(r).
        h. Applicant Contact: Karol Mack, Duke Power Company, Legal 
    Department, 422 South Church Street, Charlotte, NC 28242-0001, (704) 
    382-8104.
        i. FERC Contact: Scott Riedmann, (202) 219-0076.
        j. Comment Date: December 23, 1994.
        k. Description of Project: In accordance with the Federal Energy 
    Regulatory Commission's Order dated April 14, 1994, the Duke Power 
    Company has submitted its revised Shoreline Management Plan for the 
    Catawba-Wateree Project. The submittal describes Duke Power's shoreline 
    management planning methodology and explains the programs that will be 
    used to implement the Shoreline Management Plan.
        l. This notice also consists of the following standard paragraphs: 
    B, C1, D2.
    
        2a. Type of Application: Recreation Plan.
        b. Project No.: 10661-015.
        c. Date Filed: October 19, 1994.
        d. Applicant: Indiana Michigan Power Company.
        e. Name of Project: Constantine.
        f. Location: St. Joseph River, St. Joseph County, Michigan.
        g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
        h. Applicant Contact: Mr. Bruce Bennett, American Electric Power 
    Service, One Riverside Plaza, Columbus, OH 43215, (614) 223-2900.
        i. FERC Contact: Patti Pakkala, (202) 219-0025.
        j. Comment Date: December 27, 1994.
        k. Description of Project: Indiana Michigan Power Company (IMPC), 
    licensee for the Constantine Project, requests approval of a recreation 
    plan. As part of the recreation plan, IMPC requests approval of an 
    impoundment boat launch and related facilities, immediately west of the 
    headgate structure for the Constantine Project. The impoundment boat 
    launch would enhance the project's recreational facilities, as it would 
    be the only handicap-accessible boat launch within 10 miles of the 
    project.
        l. This notice also consists of the following standard paragraphs: 
    B, C1, and D2.
    
        3a. Type of Application: Approval To Delete the Requirement for a 
    Canoe Portage Facility From the Reusens Hydroelectric Project License.
        b. Project No: 2376-004.
        c. Date Filed: September 16, 1994.
        d. Applicant: Appalachian Power Company.
        e. Name of Project: Reusens Hydroelectric Project.
        f. Location: Amherst and Bedford Counties, Virginia.
        g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
        h. Applicant Contact: Mr. Jim L. Fariss, Appalachian Power Company 
    P.O. Box 2021, Roanoke, VA 24022-2121, (703) 985-2348.
        i. FERC Contact: Jean Potvin, (202) 219-0022.
        j. Comment Date: December 23, 1994.
        k. Description of Project: The licensee requests approval to amend 
    its license and not build a canoe portage path around its Reusens power 
    station.
        l. This notice also consists of the following standard paragraphs: 
    B, C1, and D2.
    
        4a. Type of Application: Conduit Exemption (Tendered Notice).
        b. Project No.: 11503-000.
        c. Date filed: October 26, 1994.
        d. Applicant: City of Soda Springs.
        e. Name of Project: Soda Creek Project No. 4.
        f. Location: At the new Kackley Ditch canal, which diverts water 
    from Soda Creek near the base of Soda dam, in Caribou County, Idaho.
        g. Filed Pursuant to: Federal Power Act 16 USC Secs. 791(a)-825(r).
        h. Applicant Contact: W. Lee Godfrey, Director of City Services, 
    City of Soda Springs, 9 West Second South, Soda Springs, ID 83276.
        i. FERC Contact: Hector M. Perez at (202) 219-2843.
        j. Description of Project: The existing project consists of: (1) An 
    intake structure at the main canal; (2) a 42-inch-diameter, 270-feet-
    long welded steel penstock; (3) a powerhouse containing a single 
    turbine-generator unit with a rated capacity of 500 kilowatts; and (4) 
    a 100-foot-long tailrace.
        k. Under Section 4.32 (b)(7) of the Commission's regulations (18 
    CFR), if any resource agency, Indian Tribe, or person believes that the 
    applicant should conduct an additional scientific study to form an 
    adequate factual basis for a complete analysis of the application on 
    its merits, they must file a request for the study with the Commission, 
    not later than 60 days after the application is filed, and must serve a 
    copy of the request on the applicant.
    
        5a. Type of Application: Recreation Plan.
    
        b. Project No.: 2666-004.
        c. Date Filed: September 16, 1994.
        d. Applicant: Bangor Hydro-Electric Company.
        e. Name of Project: Medway.
        f. Location: West Branch of the Penobscot River, Penobscot County, 
    Maine.
        g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
        h. Applicant Contact: Mr. Douglas Morrell, P.O. Box 932, 33 State 
    Street, Bangor, ME 04401, (207) 945-5621.
        i. FERC Contact: Patti Pakkala, (202) 219-0025.
        j. Comment Date: December 27, 1994.
        k. Description of Project: Bangor Hydro-Electric Company, licensee 
    for the Medway Project, requests approval of a recreation plan. The 
    licensee proposes to construct a trailer-mounted boat launch, parking 
    area, and portage trail to enhance recreation access to the West Branch 
    of the Penobscot River.
        l. This notice also consists of the following standard paragraphs: 
    B, C1, and D2.
    
    Standard Paragraphs
    
        B. Comments, Protests, or Motions to Intervene--Anyone may submit 
    comments, a protest, or a motion to intervene in accordance with the 
    requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, 
    .214. In determining the appropriate action to take, the Commission 
    will consider all protests or other comments filed, but only those who 
    file a motion to intervene in accordance with the Commission's Rules 
    may become a party to the proceeding. Any comments, protests, or 
    motions to intervene must be received on or before the specified 
    comment date for the particular application.
        C1. Filing and Service of Responsive Documents--Any filings must 
    bear in all capital letters the title ``COMMENTS'', ``RECOMMENDATIONS 
    FOR TERMS AND CONDITIONS'', ``PROTEST'', OR ``MOTION TO INTERVENE'', as 
    applicable, and the Project Number of the particular application to 
    which the filing refers. Any of the above-named documents must be filed 
    by providing the original and the number of copies provided by the 
    Commission's regulations to: The Secretary, Federal Energy Regulatory 
    Commission, 825 North Capitol Street, N.E., Washington, D.C. 20426. A 
    copy of any motion to intervene must also be served upon each 
    representative of the Applicant specified in the particular 
    application.
        D2. Agency Comments--Federal, state, and local agencies are invited 
    to file comments on the described application. A copy of the 
    application may be obtained by agencies directly from the Applicant. If 
    an agency does not file comments within the time specified for filing 
    comments, it will be presumed to have no comments. One copy of an 
    agency's must also be sent to the Applicant's representatives.
    
        Dated: November 23, 1994, Washington, DC.
    Lois D. Cashell,
    Secretary.
    [FR Doc. 94-29322 Filed 11-28-94; 8:45 am]
    BILLING CODE 6717-01-P
    
    
    

Document Information

Published:
11/29/1994
Department:
Energy Department
Entry Type:
Uncategorized Document
Document Number:
94-29322
Dates:
December 23, 1994.
Pages:
0-0 (1 pages)
Docket Numbers:
Federal Register: November 29, 1994, Project Nos. 2232-303, et al.