95-29159. NorAm Gas Transmission Company; Notice of Request Under Blanket Authorization
[Federal Register Volume 60, Number 229 (Wednesday, November 29, 1995)]
[Notices]
[Page 61252]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 95-29159]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
[Docket No. CP96-58-000]
NorAm Gas Transmission Company; Notice of Request Under Blanket
Authorization
November 22, 1995.
Take notice that on November 9, 1995, NorAm Gas Transmission
Company (NGT) 1600 Smith Street, Houston, Texas 77002, in Docket No.
CP96-58-000, filed a request pursuant to Sections 157.205 and 157.216
of the Commission's Regulations under the Natural Gas Act (18 CFR
157.205 and 157.216) and under its blanket authority issued in Docket
Nos. CP82-384-000 and CP82-384-001, to abandon certain facilities in
Louisiana, all as more fully set forth in the request that is on file
with the Commission and open to public inspection.
Specifically, NorAm proposes to abandon an inactive 2-inch domestic
tap on NGT's Line NM-3, at pipeline station no 186+84 in Section 7,
Township 16 North, Range 14 West, Caddo Parish, Louisiana. NGT
installed this tap in 1967 and certificated in Docket No. CP67-83-000
to provide service to a domestic customer served by Arkla, a division
of NorAm Energy Corp. NFT states that Arkla has informed NGT that this
tap is no longer active. The cost of the facilities to be abandoned is
$230.00. NGT states that this tap will be removed and capped, as a
result of the proposed modification.
Any person or the Commission's staff may, within 45 days after
issuance of the instant notice by the Commission, file pursuant to Rule
214 of the Commission's Rules of Practice and Procedure (18 CFR
385.214) a motion to intervene or notice of intervention and pursuant
to Section 157.205 of the Regulations under the Natural Gas Act (18 CFR
157.205) a protest to the request. If no protest is filed within the
time allowed therefor, the proposed activity is deemed to be authorized
effective on the day after the time allowed for filing a protest. If a
protest is filed and not withdrawn within 30 days after the time
allowed for filing a protest, the instant request shall be treated as
an application for authorization pursuant to Section 7 of the Natural
Gas Act.
Lois D. Cashell,
Secretary.
[FR Doc. 95-29159 Filed 11-28-95; 8:45 am]
BILLING CODE 6717-01-M
Document Information
- Published:
- 11/29/1995
- Department:
- Energy Department
- Entry Type:
- Notice
- Document Number:
- 95-29159
- Pages:
- 61252-61252 (1 pages)
- Docket Numbers:
- Docket No. CP96-58-000
- PDF File:
-
95-29159.pdf