99-30839. Milford Power Limited Partnership, et al.; Electric Rate and Corporate Regulation Filings  

  • [Federal Register Volume 64, Number 228 (Monday, November 29, 1999)]
    [Notices]
    [Pages 66626-66630]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 99-30839]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    
    Federal Energy Regulatory Commission
    [Docket No. EG00-20-000, et al.]
    
    
    Milford Power Limited Partnership, et al.; Electric Rate and 
    Corporate Regulation Filings
    
    November 16, 1999.
        Take notice that the following filings have been made with the 
    Commission:
    
    1. Milford Power Limited Partnership
    
    [Docket No. EG00-20-000]
    
        Take notice that on November 5, 1999, Milford Power Limited 
    Partnership, 100 Clinton Square, Suite 403, Syracuse, New York 13202, 
    filed with the Federal Energy Regulatory Commission an application for 
    determination of exempt wholesale generator status pursuant to Part 365 
    of the Commission's regulations.
        Milford Power Limited Partnership owns and operates a cogeneration 
    facility in Milford, New Jersey, with a name plate capacity of 
    approximately 30.5 MW (Facility). Milford Power Limited Partnership 
    sells electric energy and capacity from the Facility at wholesale to CL 
    Power Sales Nine, L.L.C., a power marketer.
        Comment date: December 7, 1999, in accordance with Standard 
    Paragraph E at the end of this notice. The Commission will limit its 
    consideration of comments to those that concern the adequacy or 
    accuracy of the application.
    
    2. Liberty Electric Power, LLC
    
    [Docket No. EG00-21-000]
    
        Take notice that on November 5, 1999, Liberty Electric Power, LLC 
    (Liberty Electric), with its principal offices c/o Columbia Electric 
    Corporation, 13880 Dulles Corner Lane, Herndon, VA 20171, filed with 
    the Federal Energy Regulatory Commission an application for 
    determination of exempt wholesale generator status pursuant to Section 
    32 of the Public Utility Holding Company Act of 1935, as amended, and 
    Part 365 of the Commission's regulations.
        Liberty Electric is a Delaware limited liability company which will 
    be engaged exclusively in the business of owning and operating a 
    nominal 500 MW natural gas-fired generating facility in Eddystone, 
    Pennsylvania and selling electricity at wholesale.
        Comment date: December 7, 1999, in accordance with Standard 
    Paragraph E at the end of this notice. The Commission will limit its 
    consideration of comments to those that concern the adequacy or 
    accuracy of the application.
    
    [[Page 66627]]
    
    3. Sithe New Jersey Holdings LLC
    
    [Docket No. EG00-23-000]
    
        Take notice that on November 5, 1999, Sithe New Jersey Holdings LLC 
    (SNJH) filed with the Federal Energy Regulatory Commission an 
    application for determination of exempt wholesale generator status 
    pursuant to Part 365 of the Commission's regulations.
        SNJH is an indirect subsidiary of Sithe Energies, Inc., and will 
    own and operate five (5) generation facilities in New Jersey (the 
    ``SNJH Facilities'') after the acquisition of those facilities from 
    Jersey Central Power & Light Company, Metropolitan Edison Company and 
    Pennsylvania Electric Company. SNJH will be engaged directly and 
    exclusively in the business of owning and/or operating the SNJH 
    Facilities and selling the SNJH Facilities' electric energy at 
    wholesale.
        Comment date: December 7, 1999, in accordance with Standard 
    Paragraph E at the end of this notice. The Commission will limit its 
    consideration of comments to those that concern the adequacy or 
    accuracy of the application.
    
    4. Sithe Pennsylvania Holdings LLC
    
    [Docket No. EG00-24-000]
    
        Take notice that on November 5, 1999, Sithe Pennsylvania Holdings 
    LLC (SPH) filed with the Federal Energy Regulatory Commission an 
    application for determination of exempt wholesale generator status 
    pursuant to Part 365 of the Commission's regulations.
        SPH is an indirect subsidiary of Sithe Energies, Inc., and will own 
    and operate sixteen generation facilities in Pennsylvania (the SPH 
    facilities) after the acquisition of those facilities from Jersey 
    Central Power & Light Company, Metropolitan Edison Company and 
    Pennsylvania Electric Company. SPH will be engaged directly and 
    exclusively in the business of owning and/or operating the SPH 
    Facilities and selling the SPH Facilities' electric energy at 
    wholesale.
        Comment date: December 7, 1999, in accordance with Standard 
    Paragraph E at the end of this notice. The Commission will limit its 
    consideration of comments to those that concern the adequacy or 
    accuracy of the application.
    
    5. Pacific Gas and Electric Company
    
    [Docket No. EL98-48-001]
    
        Take notice that on November 1, 1999, Pacific Gas and Electric 
    Company (PG&E), tendered for filing a ``First Amendment to the 
    Settlement Agreement Between Turlock Irrigation District and Pacific 
    Gas and Electric Company'' in order to comply with the Federal Energy 
    Regulatory Commission's (Commission) September 30, 1999 Letter. Copies 
    of this filing have been served upon the Turlock Irrigation District 
    and the California Public Utilities Commission.
        Comment date: December 1, 1999, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    6. Tenaska Power Services Co.; and TransAlta Energy Marketing 
    (U.S.) Inc.
    
    [Docket Nos. ER94-389-021 and ER98-3184-006]
    
        Take notice that on October 29, 1999, the above-mentioned power 
    marketers filed quarterly reports with the Commission in the above-
    mentioned proceedings for information only.
    
    7. Sithe Power Marketing, Inc.
    
    [Docket No. ER98-107-009]
    
        Take notice that on November 2, 1999, the above-mentioned power 
    marketers filed quarterly reports with the Commission in the above-
    mentioned proceedings for information only.
    
    8. INFINERGY Services, LLC; Pacific Energy & Development 
    Corporation; Entergy Power Marketing Corp.; and Quantum Energy 
    Resources, Inc.
    
    [Docket Nos. ER98-3478-004; ER98-1824-007; ER95-1615-020; ER96-947-012; 
    ER96-947-013; and ER96-947-014]
    
        Take notice that on November 4, 1999, the above-mentioned power 
    marketers filed quarterly reports with the Commission in the above-
    mentioned proceedings for information only.
    
    9. CL Power Sales Seven, L.L.C.; CL Power Sales Eight, L.L.C.; CL 
    Power Sales Ten, L.L.C.; CL Power Sales Nine, L.L.C.; CP Power 
    Sales Fifteen, L.L.C.; CP Power Sales Fourteen, L.L.C.; CP Power 
    Sales Thirteen, L.L.C.; CP Power Sales Twelve, L.L.C.; CP Power 
    Sales Nineteen, L.L.C.; CP Power Sales Seventeen, L.L.C.; CP Power 
    Sales Eighteen, L.L.C.; CP Power Sales Twenty, L.L.C.; and H.Q. 
    Energy Services (U.S.) Inc.
    
    [Docket Nos. ER96-2652-038; ER96-2652-039; ER96-652-040; ER96-2652-041; 
    ER99-890-004; ER99-891-004; ER99-892-004; ER99-893-004; ER99-4228-001; 
    ER99-4229-001; ER99-4230-001; ER99-4231-001; and ER97-851-010]
    
        Take notice that on November 1, 1999, the above-mentioned power 
    marketers filed quarterly reports with the Commission in the above-
    mentioned proceedings for information only.
    
    10. Reliant Energy Etiwanda, LLC
    
    [Docket No. ER99-4398-000]
    
        Take notice that on November 4, 1999, Reliant Energy Etiwanda, LLC 
    (Reliant Etiwanda) tendered for filing an amendment to its filing in 
    the above-captioned docket.
        Comment date: November 29, 1999, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    11. Enron Power Marketing, Inc.
    
    [Docket No. ER00-497-000]
    
        Take notice that on November 1, 1999, Enron Power Marketing, Inc. 
    (EPMI), tendered for filing with the Commission an amendment to 
    Electric Rate Schedule No. 1, to allow EPMI to sell specified ancillary 
    services at market-based rates to the New England Power Pool. 
    Consistent with the Commission's current requirements, EPMI also amends 
    its rate schedule to specifically state that it sells the ancillary 
    services of spinning reserve, non-spinning reserve, and regulation to 
    the California ISO at market-based rates.
        EPMI requests that the tariff amendment be made effective on 
    January 1, 2000.
        Comment date: November 26, 1999, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    12. Rochester Gas and Electric Corporation
    
    [Docket No. ER00-528-000]
    
        Take notice that on November 8, 1999, Rochester Gas and Electric 
    Corporation (RG&E), tendered for filing with the Federal Energy 
    Regulatory Commission (Commission) a Service Agreement between RG&E and 
    Columbia Energy Power Marketing (Transmission Customer) for service 
    under RG&E's open access transmission tariff. Specifically dealing with 
    the Retail Access Program under RG&E's open access transmission tariff.
        RG&E requests waiver of the Commission's notice requirements for 
    good cause shown and an effective date of November 1, 1999, for the 
    Columbia Energy Power Marketing Service Agreement.
        A copy of this Service Agreement has been served on the 
    Transmission Customer and the New York Public Service Commission.
        Comment date: November 26, 1999, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    13. Idaho Power Company
    
    [Docket No. ER99-4560-000]
    
        Take notice that on September 28, 1999, Idaho Power Company filed a 
    service agreement for firm point-to-point transmission service to 
    Arizona Public Service Company under Idaho Power Company's transmission 
    tariff.
        The service agreement is proposed to become effective October 1, 
    1999.
    
    [[Page 66628]]
    
        Comment date: December 2, 1999, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    14. Illinova Power Marketing, Inc.
    
    [Docket No. ER00-431-000]
    
        Take notice that on November 8, 1999, Illinova Power Marketing, 
    Inc. (IPMI), tendered for filing an errata to the Electric Transaction 
    Service Agreement filed in this docket on November 1, 1999, under which 
    certain customers will take service pursuant to IPMI's power sales 
    tariff, Rate Schedule FERC No. 1.
        IPMI has requested an effective date of October 1, 1999, for each 
    service agreement.
        Comment date: November 26, 1999, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    15. Portland General Electric Company
    
    [Docket No. ER00-516-000]
    
        Take notice that on November 8, 1999, Portland General Electric 
    Company (PGE), tendered for filing under PGE's Final Rule pro forma 
    tariff (FERC Electric Tariff First Revised Volume No. 8, Docket No. 
    OA96-137-000), executed Service Agreements for Short-Term Firm and Non-
    Firm Point-to-Point Transmission Service with PG&E Energy Trading-
    Power, LP.
        Pursuant to 18 CFR Section 35.11, and the Commission's Order in 
    Docket No. PL93-2-002 issued July 30, 1993, PGE respectfully requests 
    that the Commission grant a waiver of the notice requirements of 18 CFR 
    Section 35.3 to allow the Service Agreement to become effective October 
    22, 1999.
        A copy of this filing was caused to be served upon PG&E Energy 
    Trading-Power, LP, as noted in the filing letter.
        Comment date: November 26, 1999, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    16. St. Joseph Light & Power Company
    
    [Docket No. ER00-517-000]
    
        Take notice that on November 8, 1999, St. Joseph Light & Power Co., 
    (SJLP), tendered for filing eight executed agreements for transmission 
    service under its Open Access Transmission Tariff. The eight agreements 
    consist of two agreements for each of four customers, one for firm 
    point-to-point service and one for non-firm point-to-point service. The 
    four customers are The Energy Authority, Inc.; Energy Transfer Group, 
    L.L.C.; NewEnergy, Inc.; and TransAlta Energy Marketing (U.S.) Inc. 
    Also included in this filing is the Third Revised Sheet No. 72, to 
    Tariff No.1 which is the Index of SJLP's point-to-point transmission 
    service customers.
        Copies of the filing were served on each of these four companies.
        Comment date: November 26, 1999, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    17. Ameren Services Company
    
    [Docket No. ER00-518-000]
    
        Take notice that on November 8, 1999, Ameren Services Company 
    (ASC), tendered for filing a Service Agreement for Firm Point-to-Point 
    Transmission Services between ASC and Omaha Public Power District 
    (Omaha). ASC asserts that the purpose of the Agreement is to permit ASC 
    to provide transmission service to Omaha pursuant to Ameren's Open 
    Access Transmission Tariff filed in Docket No. ER 96-677-004.
        Comment date: November 26, 1999, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    18. Ameren Services Company
    
    [Docket No. ER00-519-000]
    
        Take notice that on November 8, 1999, Ameren Services Company 
    (ASC), tendered for filing a Service Agreement for Non-Firm Point-to-
    Point Transmission Service between ASC and Omaha Public Power District 
    (Omaha). ASC asserts that the purpose of the Agreement is to permit ASC 
    to provide transmission service to Omaha pursuant to Ameren's Open 
    Access Transmission Tariff filed in Docket No. ER96-677-004.
        Comment date: November 26, 1999, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    19. FirstEnergy Corp., and Pennsylvania Power Company
    
    [Docket No. ER00-520-000]
    
        Take notice that on November 8, 1999, FirstEnergy Corp., tendered 
    for filing on behalf of itself and Pennsylvania Power Company, a 
    Service Agreement for Network Integration Service and an Operating 
    Agreement for the Network Integration Transmission Service under the 
    Pennsylvania Electric Choice Program with Utility.com, Inc. pursuant to 
    the FirstEnergy System Open Access Tariff. These agreements will enable 
    the parties to obtain Network Integration Service under the 
    Pennsylvania Electric Choice Program in accordance with the terms of 
    the Tariff.
        The proposed effective date under these agreements is November 1, 
    1999.
        Comment date: November 26, 1999, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    20. Allegheny Power Service Corporation, on behalf of Monongahela 
    Power Company, The Potomac Edison Company, and West Penn Power 
    Company, (Allegheny Power)
    
    [Docket No. ER00-521-000]
    
        Take notice that on November 8, 1999, Allegheny Power Service 
    Corporation on behalf of Monongahela Power Company, The Potomac Edison 
    Company and West Penn Power Company (Allegheny Power), tendered for 
    filing Supplement Nos. 64, 65 and 66 to add West Penn Power d/b/a 
    Allegheny Energy to Allegheny Power Open Access Transmission Service 
    Tariff which has been accepted for filing by the Federal Energy 
    Regulatory Commission.
        The proposed effective date under each Service Agreement is 
    December 1, 1999.
        Copies of the filing have been provided to the Public Utilities 
    Commission of Ohio, the Pennsylvania Public Utility Commission, the 
    Maryland Public Service Commission, the Virginia State Corporation 
    Commission, the West Virginia Public Service Commission.
        Comment date: November 26, 1999, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    21. Alliant Energy Corporate Services, Inc.
    
    [Docket No. ER00-523-000]
    
        Take notice that on November 8, 1999, Alliant Energy Corporate 
    Services, Inc., tendered for filing executed Service Agreements for 
    short-term firm point-to-point transmission service and non-firm point-
    to-point transmission service, establishing Delmarva Power & Light 
    Company as a point-to-point Transmission Customer under the terms of 
    the Alliant Energy Corporate Services, Inc., transmission tariff.
        Alliant Energy Corporate Services, Inc., requests an effective date 
    of October 22, 1999, and accordingly, seeks waiver of the Commission's 
    notice requirements.
        A copy of this filing has been served upon the Illinois Commerce 
    Commission, the Minnesota Public Utilities Commission, the Iowa 
    Department of Commerce, and the Public Service Commission of Wisconsin.
        Comment date: November 26, 1999, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    [[Page 66629]]
    
    22. Niagara Mohawk Power Corporation
    
    [Docket No. ER00-524-000]
    
        Take notice that on November 8, 1999, Niagara Mohawk Power 
    Corporation (Niagara Mohawk), tendered for filing notice that effective 
    upon the start date of the New York Independent System Operator 
    (NYISO), the portion of Rate Schedule FERC No. 33, effective date 
    December 12, 1983, and any supplements thereto, and filed with the 
    Federal Energy Regulatory Commission by Niagara Mohawk that pertain to 
    397 MW of capacity from Moses 17-18 and the Niagara Plant to Niagara 
    Mohawk's Edic substation is to be canceled. The balance of Rate 
    Schedule FERC No. 33 is unaffected by this cancellation.
        Notice of the proposed cancellation has been served upon Power 
    Authority of the State of New York.
        Comment date: November 26, 1999, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    23. Rochester Gas and Electric Corporation
    
    [Docket No. ER00-525-000]
    
        Take notice that on November 8, 1999, Rochester Gas and Electric 
    Corporation (RG&E), tendered for filing with the Federal Energy 
    Regulatory Commission (Commission) a Service Agreement between RG&E and 
    TXU Energy Services (Transmission Customer) for service under RG&E's 
    open access transmission tariff. Specifically dealing with the Retail 
    Access Program under RG&E's open access transmission tariff.
        RG&E requests waiver of the Commission's notice requirements for 
    good cause shown and an effective date of November 1, 1999, for the TXU 
    Energy Services Service Agreement.
        A copy of this Service Agreement has been served on the 
    Transmission Customer and the New York Public Service Commission.
        Comment date: November 26, 1999, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    24. Rochester Gas and Electric Corporation
    
    [Docket No. ER00-526-000]
    
        Take notice that on November 8, 1999, Rochester Gas and Electric 
    Corporation (RG&E), tendered for filing with the Federal Energy 
    Regulatory Commission (Commission) a Service Agreement between RG&E and 
    North American Energy, Inc., (Transmission Customer) for service under 
    RG&E's open access transmission tariff. Specifically dealing with the 
    Retail Access Program under RG&E's open access transmission tariff.
        RG&E requests waiver of the Commission's notice requirements for 
    good cause shown and an effective date of November 1, 1999, for the 
    North American Energy, Inc., Service Agreement
        A copy of this Service Agreement has been served on the 
    Transmission Customer and the New York Public Service Commission.
        Comment date: November 26, 1999, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    25. Rochester Gas and Electric Corporation
    
    [Docket No. ER00-527-000]
    
        Take notice that on November 8, 1999, Rochester Gas and Electric 
    Corporation (RG&E), tendered for filing with the Federal Energy 
    Regulatory Commission (Commission) a Service Agreement between RG&E and 
    Monroe County (Transmission Customer) for service under RG&E's open 
    access transmission tariff. Specifically dealing with the Retail Access 
    Program under RG&E's open access transmission tariff.
        RG&E requests waiver of the Commission's notice requirements for 
    good cause shown and an effective date of November 1, 1999, for the 
    Monroe County Service Agreement
        A copy of this Service Agreement has been served on the 
    Transmission Customer and the New York Public Service Commission.
        Comment date: November 26, 1999, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    26. Rochester Gas and Electric Corporation
    
    [Docket No. ER00-529-000]
    
        Take notice that on November 8, 1999, Rochester Gas and Electric 
    Corporation (RG&E), tendered for filing with the Federal Energy 
    Regulatory Commission (Commission) a Service Agreement between RG&E and 
    Energetix, Inc., (Transmission Customer) for service under RG&E's open 
    access transmission tariff. Specifically dealing with the Retail Access 
    Program under RG&E's open access transmission tariff.
        RG&E requests waiver of the Commission's notice requirements for 
    good cause shown and an effective date of November 1, 1999, for the 
    Energetix, Inc., Service Agreement
        A copy of this Service Agreement has been served on the 
    Transmission Customer and the New York Public Service Commission.
        Comment date: November 26, 1999, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    27. New England Power Pool
    
    [Docket No. ER00-530-000]
    
        Take notice that on November 8, 1999, the New England Power Pool 
    (NEPOOL), Participants Committee tendered for filing the Forty-Seventh 
    Agreement Amending the New England Power Pool Agreement (the Forty-
    Seventh Agreement) which modifies prospectively how capital 
    expenditures and capitalized project costs of the ISO New England Inc., 
    incurred on or after January 1, 2000 are to be allocated among and paid 
    by the Participants.
        The NEPOOL Participants Committee states that copies of these 
    materials were sent to the New England state governors and regulatory 
    commissions and the NEPOOL Participants.
        Comment date: November 26, 1999, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    28. Duquesne Light Company
    
    [Docket No. ER00-532-000]
    
        Take notice that November 8, 1999, Duquesne Light Company (DLC), 
    tendered for filing a Service Agreement dated November 5, 1999 with 
    FirstEnergy Trading Services, Inc., under DLC's Open Access 
    Transmission Tariff (Tariff). The Service Agreement adds FirstEnergy 
    Trading Services, Inc., as a customer under the Tariff.
        DLC requests an effective date of November 5, 1999, for the Service 
    Agreement.
        Comment date: November 26, 1999, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    29. Duquesne Light Company
    
    [Docket No. ER00-533-000]
    
        Take notice that on November 8, 1999, Duquesne Light Company (DLC), 
    tendered for filing a Service Agreement for Network Integration 
    Transmission Service and a Network Operating Agreement for Transmission 
    Service dated November 1, 1999 with Allegheny Power Service under DLC's 
    Open Access Transmission Tariff (Tariff). The Service Agreement and 
    Network Operating Agreement adds Allegheny Power Service as a customer 
    under the Tariff.
        DLC requests an effective date of November 1, 1999, for the Service 
    Agreement.
        Comment date: November 26, 1999, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    [[Page 66630]]
    
    30. Duquesne Light Company
    
    [Docket No. ER00-535-000]
    
        Take notice that on November 8, 1999, Duquesne Light Company (DLC), 
    tendered for filing a Non-Firm Point-to-Point Service Agreement dated 
    November 5, 1999 with TXU Energy Trading Company under DLC's Open 
    Access Transmission Tariff (Tariff). The Service Agreement adds TXU 
    Energy Trading Company as a customer under the Tariff.
        DLC requests an effective date of November 5, 1999, for the Service 
    Agreement.
        Comment date: November 26, 1999, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    31. McDonough Power Cooperative
    
    [Docket No. ER00-537-000]
    
        Take notice that on November 9, 1999, McDonough Power Cooperative 
    (McDonough), tendered for filing its Agreement between McDonough Power 
    Cooperative and Central Illinois Public Service Company (CIPS 
    Agreement) pursuant to Sec. 205 of the Federal Power Act (FPA), 16 
    U.S.C. Sec. 824d, and Sec. 35.12 of the Regulations of the Federal 
    Energy Regulatory Commission (Commission), 18 CFR 35.12.
        McDonough requests that the Commission accept the agreements with 
    an effective date of November 18, 1999.
        McDonough's filing is available for public inspection at its 
    offices in Macomb, Illinois.
        Comment date: November 29, 1999, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    32. Alliant Energy Corporate Services, Inc.
    
    [Docket No. ER00-538-000]
    
        Take notice that on November 9, 1999, Alliant Energy Corporate 
    Services, Inc., tendered for filing executed Service Agreements for 
    short-term firm point-to-point transmission service and non-firm point-
    to-point transmission service, establishing Conectiv Energy Supply, 
    Inc., as a point-to-point Transmission Customer under the terms of the 
    Alliant Energy Corporate Services, Inc., transmission tariff.
        Alliant Energy Corporate Services, Inc. requests an effective date 
    of October 22, 1999, and accordingly, seeks waiver of the Commission's 
    notice requirements.
        A copy of this filing has been served upon the Illinois Commerce 
    Commission, the Minnesota Public Utilities Commission, the Iowa 
    Department of Commerce, and the Public Service Commission of Wisconsin.
        Comment date: November 29, 1999, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    33. Minnesota Power, Inc.
    
    [Docket No. ER00-539-000]
    
        Take notice that on November 9, 1999, Minnesota Power, Inc., 
    tendered for filing a signed Service Agreement with UtiliCorp United 
    Inc., and with OGE Energy Resources, Inc., under its market-based 
    Wholesale Coordination Sales Tariff (WCS-2) to satisfy its filing 
    requirements under this tariff.
        Comment date: November 29, 1999, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    34. Niagara Mohawk Power Corporation
    
    [Docket No. ER00-501-000]
    
        Take notice that on November 5, 1999, Niagara Mohawk Power 
    Corporation (Niagara Mohawk), tendered for filing with the Federal 
    Energy Regulatory Commission an executed Transmission Service Agreement 
    between Niagara Mohawk and Sithe Power Marketing, Inc. This 
    Transmission Service Agreement specifies that Sithe Power Marketing, 
    Inc., has signed on to and has agreed to the terms and conditions of 
    Niagara Mohawk's Open Access Transmission Tariff as filed in Docket No. 
    OA96-194-000. This Tariff, filed with FERC on July 9, 1996, will allow 
    Niagara Mohawk and Sithe Power Marketing, Inc., to enter into 
    separately scheduled transactions under which Niagara Mohawk will 
    provide non-firm transmission service for Sithe Power Marketing, Inc., 
    as the parties may mutually agree.
        Niagara Mohawk requests an effective date of November 2, 1999. 
    Niagara Mohawk has requested waiver of the notice requirements for good 
    cause shown.
        Niagara Mohawk has served copies of the filing upon the New York 
    State Public Service Commission and Sithe Power Marketing, Inc.
        Comment date: November 26, 1999, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    35. Cinergy Services, Inc.
    
    [Docket No. ER00-540-000]
    
        Take notice that on November 9, 1999, Cinergy Services, Inc. 
    (Cinergy), tendered for filing a Non-Firm Point-To-Point Service 
    Agreement under Cinergy's Open Access Transmission Service Tariff (the 
    Tariff) entered into between Cinergy and Edison Mission Marketing & 
    Trading, Inc., (Western).
        Cinergy and Western are requesting an effective date of October 9, 
    1999.
        Comment date: November 29, 1999, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    36. Baltimore Gas and Electric Company; Constellation Power Source, 
    Inc.
    
    [Docket Nos. ER99-2948-001 and ER97-2261-013]
    
        Take notice that on November 12, 1999, Baltimore Gas and Electric 
    Company and its affiliate, Constellation Power Source, Inc., tendered 
    for filing notification of a change in status to reflect certain 
    departures from the facts the Commission relied upon in granting 
    market-based rate authority.
        Comment date: December 2, 1999, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    37. Pittsfield Generating Company, L.P.
    
    [Docket No. ER00-496-000]
    
        Take notice that on November 4, 1999, Pittsfield Generating 
    Company, L.P. filed their quarterly report for the quarter ending 
    September 30, 1999.
        Comment date: November 29, 1999, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    Standard Paragraphs
    
        E. Any person desiring to be heard or to protest such filing should 
    file a motion to intervene or protest with the Federal Energy 
    Regulatory Commission, 888 First Street, N.E., Washington, D.C. 20426, 
    in accordance with Rules 211 and 214 of the Commission's Rules of 
    Practice and Procedure (18 CFR 385.211 and 385.214). All such motions 
    or protests should be filed on or before the comment date. Protests 
    will be considered by the Commission in determining the appropriate 
    action to be taken, but will not serve to make protestants parties to 
    the proceeding. Any person wishing to become a party must file a motion 
    to intervene. Copies of these filings are on file with the Commission 
    and are available for public inspection. This filing may also be viewed 
    on the Internet at http://www.ferc.fed.us/online/rims.htm (call 202-
    208-2222 for assistance).
    Linwood A. Watson, Jr.,
    Acting Secretary.
    [FR Doc. 99-30839 Filed 11-26-99; 8:45 am]
    BILLING CODE 6717-01-P
    
    
    

Document Information

Published:
11/29/1999
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
99-30839
Dates:
December 7, 1999, in accordance with Standard Paragraph E at the end of this notice. The Commission will limit its consideration of comments to those that concern the adequacy or accuracy of the application.
Pages:
66626-66630 (5 pages)
Docket Numbers:
Docket No. EG00-20-000, et al.
PDF File:
99-30839.pdf