94-27256. Tenaska Power Services Co., et al.; Electric Rate and Corporate Regulation Filings  

  • [Federal Register Volume 59, Number 212 (Thursday, November 3, 1994)]
    [Unknown Section]
    [Page 0]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 94-27256]
    
    
    [[Page Unknown]]
    
    [Federal Register: November 3, 1994]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    [Docket No. ER94-389-001, et al.]
    
     
    
    Tenaska Power Services Co., et al.; Electric Rate and Corporate 
    Regulation Filings
    
    October 27, 1994.
        Take notice that the following filings have been made with the 
    Commission:
    
    1. Tenaska Power Services Co.
    
    [Docket No. ER94-389-001]
    
        Take notice that on September 23, 1994, Tenaska Power Services 
    Company (TPS) filed certain information as required by the Commission's 
    May 26, 1994, letter order in Docket No. ER94-389-001. Copies of TPS's 
    informational filing are on file with the Commission and are available 
    for public inspection.
    
    2. Eastern Power Distribution, Inc.
    
    [Docket No. ER94-964-003]
    
        Take notice that on October 11, 1994, Eastern Power Distribution, 
    Inc. (EPD) filed certain information as required by the Commission's 
    April 5, 1994, letter order in Docket No. ER94-964-002. Copies of EPD's 
    informational filing are on file with the Commission and are available 
    for public inspection.
    
    3. Portland General Electric Co.
    
    [Docket No. ER94-1420-000]
    
        Take notice that on October 24, 1994, Portland General Electric 
    Company (PGE) tendered for filing supplemental information relating to 
    its July 1, 1994, filing in the above-captioned Docket of a service 
    agreement under PGE-1 with City of Redding, California. The information 
    consists of language for PGE FERC Electric Tariff, Original Volume No. 
    1 (PGE-1), as accepted by the Commission on October 14, 1994 in Docket 
    Nos. ER93-462-000, ER93-703-000, and ER94-1295-000. Copies of the 
    filing have been served on the parties listed in the Certificate of 
    Service attached to the filing letter.
        Comment date: November 10, 1994, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    4. Arizona Public Service Co.
    
    [Docket No. ER94-1681-000]
    
        Take notice that on October 21, 1994, Arizona Public Service 
    Company tendered for filing, at Staff's request, an amendment to its 
    filing in this Docket.
        A copy of this filing has been served on the Arizona Corporation 
    Commission.
        Comment date: November 10, 1994, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    5. PECO Energy Co.
    
    [Docket No. ER95-26-000]
    
        Take notice that on October 6, 1994, PECO Energy Company tendered 
    for filing a Notice of Succession indicating that Philadelphia Electric 
    Company had changed its name to PECO Energy Company.
        Comment date: November 10, 1994, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    6. Tucson Electric Power
    
    [Docket No. ER95-36-000]
    
        Take notice that on October 13, 1994, Tucson Electric Power Company 
    (Tucson) tendered for filing a Notice of Cancellation of the 1992 short 
    term power sale agreement between Tucson and Citizens Utilities 
    Company.
        Comment date: November 10, 1994, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    7. New England Power Co.
    
    [Docket No. ER95-52-000]
    
        Take notice that on October 20, 1994, New England Power Company 
    (NEP) tendered for filing a Notice of Termination for Rate Schedule No. 
    373 between NEP and Bangor Hydro Electric Company.
        Comment date: November 10, 1994, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    Standard Paragraphs
    
        E. Any person desiring to be heard or to protest said filing should 
    file a motion to intervene or protest with the Federal Energy 
    Regulatory Commission, 825 North Capitol Street, N.E., Washington, D.C. 
    20426, in accordance with Rules 211 and 214 of the Commission's Rules 
    of Practice and Procedure (18 CFR 385.211 and 18 CFR 385.214). All such 
    motions or protests should be filed on or before the comment date. 
    Protests will be considered by the Commission in determining the 
    appropriate action to be taken, but will not serve to make protestants 
    parties to the proceeding. Any person wishing to become a party must 
    file a motion to intervene. Copies of this filing are on file with the 
    Commission and are available for public inspection.
    Lois D. Cashell,
    Secretary.
    [FR Doc. 94-27256 Filed 11-2-94; 8:45 am]
    BILLING CODE 6717-01-P
    
    
    

Document Information

Published:
11/03/1994
Department:
Energy Department
Entry Type:
Uncategorized Document
Document Number:
94-27256
Dates:
November 10, 1994, in accordance with Standard Paragraph E at the end of this notice.
Pages:
0-0 (1 pages)
Docket Numbers:
Federal Register: November 3, 1994, Docket No. ER94-389-001, et al.