95-27268. Northwest Pipeline Corporation; Notice of Request Under Blanket Authorization  

  • [Federal Register Volume 60, Number 213 (Friday, November 3, 1995)]
    [Notices]
    [Page 55839]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 95-27268]
    
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    [Docket No. CP96-37-000]
    
    
    Northwest Pipeline Corporation; Notice of Request Under Blanket 
    Authorization
    
    October 30, 1995.
        Take notice that on October 25, 1995, Northwest Pipeline 
    Corporation (Northwest), 295 Chipeta Way, Salt Lake City, Utah 84158, 
    filed in Docket No. CP96-37-000 a request pursuant to Sections 157.205, 
    157.211 and 157.216 of the Commission's Regulations under the Natural 
    Gas Act (18 CFR 157.205, 157.211) for authorization to abandon delivery 
    point facilities and construct and operate replacement facilities in 
    Douglas County, Oregon, to accommodate deliveries of natural gas to the 
    Washington Water Power Company (WWP), under Northwest's blanket 
    certificate issued in Docket No. CP82-433-000 pursuant to Section 7 of 
    the Natural Gas Act, all as more fully set forth in the request that is 
    on file with the Commission and open to public inspection.
        Northwest proposes to modify its existing Winston-Dillard Meter 
    Station by replacing 2 obsolete 2-inch regulators to better accommodate 
    deliveries to WWP and to increase the capacity of the meter station. It 
    is stated that construction of the meter station was authorized by the 
    Commission in Docket No. CP62-265. The cost of the proposed 
    modification of facilities is estimated at $1,959, including both 
    removal and construction. It is asserted that Northwest is authorized 
    to provide a firm transportation service for WWP under the terms of its 
    Rate Schedule TF-1, with maximum daily delivery obligations for up to 
    1,070 dt equivalent of gas per day. It is explained that the 
    replacement regulators would increase the capacity of the meter station 
    from 2,633 dt equivalent per day to 3,438 dt equivalent per day. It is 
    asserted that no significant impact on Northwest's peak day or annual 
    deliveries will result from the proposed modification of the Winston-
    Dillard Meter Station.
        Any person or the Commission's staff may, within 45 days after 
    issuance of the instant notice by the Commission, file pursuant to Rule 
    214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to 
    intervene or notice of intervention and pursuant to Section 157.205 of 
    the Regulations under the Natural Gas Act (18 CFR 157.205) a protest to 
    the request. If no protest is filed within the time allowed therefor, 
    the proposed activity shall be deemed to be authorized effective the 
    day after the time allowed for filing a protest. If a protest is filed 
    and not withdrawn within 30 days after the time allowed for filing a 
    protest, the instant request shall be treated as an application for 
    authorization pursuant to Section 7 of the Natural Gas Act.
    Lois D. Cashell,
    Secretary.
    [FR Doc. 95-27268 Filed 11-2-95; 8:45 am]
    BILLING CODE 6717-01-M
    
    

Document Information

Published:
11/03/1995
Department:
Energy Department
Entry Type:
Notice
Document Number:
95-27268
Pages:
55839-55839 (1 pages)
Docket Numbers:
Docket No. CP96-37-000
PDF File: