95-27268. Northwest Pipeline Corporation; Notice of Request Under Blanket Authorization
[Federal Register Volume 60, Number 213 (Friday, November 3, 1995)]
[Notices]
[Page 55839]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 95-27268]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
[Docket No. CP96-37-000]
Northwest Pipeline Corporation; Notice of Request Under Blanket
Authorization
October 30, 1995.
Take notice that on October 25, 1995, Northwest Pipeline
Corporation (Northwest), 295 Chipeta Way, Salt Lake City, Utah 84158,
filed in Docket No. CP96-37-000 a request pursuant to Sections 157.205,
157.211 and 157.216 of the Commission's Regulations under the Natural
Gas Act (18 CFR 157.205, 157.211) for authorization to abandon delivery
point facilities and construct and operate replacement facilities in
Douglas County, Oregon, to accommodate deliveries of natural gas to the
Washington Water Power Company (WWP), under Northwest's blanket
certificate issued in Docket No. CP82-433-000 pursuant to Section 7 of
the Natural Gas Act, all as more fully set forth in the request that is
on file with the Commission and open to public inspection.
Northwest proposes to modify its existing Winston-Dillard Meter
Station by replacing 2 obsolete 2-inch regulators to better accommodate
deliveries to WWP and to increase the capacity of the meter station. It
is stated that construction of the meter station was authorized by the
Commission in Docket No. CP62-265. The cost of the proposed
modification of facilities is estimated at $1,959, including both
removal and construction. It is asserted that Northwest is authorized
to provide a firm transportation service for WWP under the terms of its
Rate Schedule TF-1, with maximum daily delivery obligations for up to
1,070 dt equivalent of gas per day. It is explained that the
replacement regulators would increase the capacity of the meter station
from 2,633 dt equivalent per day to 3,438 dt equivalent per day. It is
asserted that no significant impact on Northwest's peak day or annual
deliveries will result from the proposed modification of the Winston-
Dillard Meter Station.
Any person or the Commission's staff may, within 45 days after
issuance of the instant notice by the Commission, file pursuant to Rule
214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to
intervene or notice of intervention and pursuant to Section 157.205 of
the Regulations under the Natural Gas Act (18 CFR 157.205) a protest to
the request. If no protest is filed within the time allowed therefor,
the proposed activity shall be deemed to be authorized effective the
day after the time allowed for filing a protest. If a protest is filed
and not withdrawn within 30 days after the time allowed for filing a
protest, the instant request shall be treated as an application for
authorization pursuant to Section 7 of the Natural Gas Act.
Lois D. Cashell,
Secretary.
[FR Doc. 95-27268 Filed 11-2-95; 8:45 am]
BILLING CODE 6717-01-M
Document Information
- Published:
- 11/03/1995
- Department:
- Energy Department
- Entry Type:
- Notice
- Document Number:
- 95-27268
- Pages:
- 55839-55839 (1 pages)
- Docket Numbers:
- Docket No. CP96-37-000
- PDF File:
-
95-27268.pdf