02-27986. Office of Fossil Energy; Notice of Filings of Coal Capability Powerplant and Industrial Fuel Use Act
-
Start Preamble
AGENCY:
Office of Fossil Energy, DOE.
ACTION:
Notice of filings.
SUMMARY:
The owners/operators of 10 baseload electric powerplants have submitted coal capability self-certifications pursuant to section 201(d) of the Powerplant and Industrial Fuel Use Act of 1978, as amended, in accordance with 10 CFR 501.60, 61.
ADDRESSES:
Copies of self-certification filings are available for public inspection, upon request, in the Office of Coal & Power Import/Export, Fossil Energy, Room 4G-039, FE-27, Forrestal Building, 1000 Independence Avenue, SW., Washington, DC 20585.
Start Further InfoFOR FURTHER INFORMATION CONTACT:
Ellen Russell at (202) 586-9624.
End Further Info End Preamble Start Supplemental InformationSUPPLEMENTARY INFORMATION:
Title II of the Powerplant and Industrial Fuel Use Act of 1978 (FUA), as amended (42 U.S.C. 8301 et seq.), provides that no new baseload electric powerplant may be constructed or operated without the capability to use coal or another alternate fuel as a primary energy source. In order to meet the requirement of coal capability, the owner or operator of such facilities proposing to use natural gas or petroleum as its primary energy source shall certify, pursuant to FUA section 201(d), to the Secretary of Energy prior to construction, or prior to operation as a base load electric powerplant, that such powerplant has the capability to use coal or another alternate fuel. Such certification establishes compliance with section 201(a) as of the date filed with the Department of Energy (DOE). The Secretary is required to publish a notice in the Federal Register that a certification has been filed. The following owners/operators of proposed new baseload electric powerplants have filed self-certifications pursuant to section 201(d) and in accordance with DOE regulations in 10 CFR 501.60, 61.
Start SignatureOwner/operator Capacity Plant location In-service date Los Esteros Critical Energy Facility 180 MW Santa Clara Cnty, CA 4th Qrt. 2002 Ocean Peaking Power 500 MW Lakewood, NJ January 2003 Reliant Energy Choctaw Cnty Facility 804 MW Choctaw County, MS June 1, 2003 Genova Arkansas I 550 MW Tontitown, AR January 2005 Genova Oklahoma I 550 MW Chickasha, OK January 2005 Beatrice Power Station 250 MW Gage County, NE March 2005 Black Rock Facility 62 MW Buffalo, NY 2nd Qtr. 2003 Blythe Energy Project 520 MW Blythe, CA December 2002 Acadia Power Project 1,200 MW Acadia Parish, LA May 2002 Wolfskill Energy Center 45 MW Solano Cnty, CA 1st Qtr. 2003 Issued in Washington, DC, on October 28, 2002.
Anthony J. Como,
Deputy Director, Electric Power Regulation, Office of Coal & Power Import/Export, Office of Coal & Power Systems, Office of Fossil Energy.
[FR Doc. 02-27986 Filed 11-1-02; 8:45 am]
BILLING CODE 6450-01-P
Document Information
- Published:
- 11/04/2002
- Department:
- Energy Department
- Entry Type:
- Notice
- Action:
- Notice of filings.
- Document Number:
- 02-27986
- Pages:
- 67154-67154 (1 pages)
- Docket Numbers:
- Certification Notice-209
- PDF File:
- 02-27986.pdf