    UMETCO Minerals Corporation
    
    AGENCY: Nuclear Regulatory Commission.
    
    ACTION: Notice of Receipt of Application from Umetco Minerals 
    Corporation to change a site-reclamation milestone in Condition 59 of 
    Source Material License SUA-648 for the Gas Hills, Wyoming Uranium Mill 
    site Notice of Opportunity for a Hearing.
    
    -----------------------------------------------------------------------
    
    SUMMARY: Notice is hereby given that the U.S. Nuclear Regulatory 
    Commission (NRC) has received, by letter dated October 11, 1995, an 
    application from Umetco Minerals Corporation (Umetco) to amend License 
    Condition (LC) 59 A.(3) of Source Material License No. SUA-648 for the 
    Gas Hills Wyoming uranium mill site. The license amendment application 
    proposes to modify LC 59 A.(3) to change the completion date for a 
    site-reclamation milestone. The new date proposed by Umetco would 
    extend completion of placement of final radon barrier on the Heap Leach 
    Impoundment by two years.
    
    FOR FURTHER INFORMATION CONTACT: Mohammad W. Haque, High-Level Waste 
    and Uranium Recovery Projects Branch, Division of Waste Management, 
    U.S. Nuclear Regulatory Commission, Washington, DC 20555. Telephone 
    (301) 415-6640.
    
    SUPPLEMENTARY INFORMATION: The portion of LC 59 A.(3) with the proposed 
    change would read as follows:
        A. (3) Placement of final radon barrier designed and constructed to 
    limit radon emissions to an average flux of no more than 20 pCi/m\2\/s 
    above background:
        For the Heap Leach Impoundment--December 31, 1997.
        Umetco's application to amend LC 59 A.(3) of Source Material 
    License SUA-648, which describes the proposed change to the license 
    condition and the 
    
    [[Page 56071]]
    reason for the request is being made available for public inspection at 
    the NRC's Public Document Room at 2120 L Street, NW (Lower Level), 
    Washington, DC 20555.
        The NRC hereby provides notice of an opportunity for a hearing on 
    the license amendment under the provisions of 10 CFR Part 2, Subpart L, 
    ``Informal Hearing Procedures for Adjudications in Materials and 
    Operator Licensing Proceedings.'' Pursuant to Sec. 2.1205(a), any 
    person whose interest may be affected by this proceeding may file a 
    request for a hearing. In accordance with Sec. 2.1205(c), a request for 
    hearing must be filed within 30 days of the publication of this notice 
    in the Federal Register. The request for a hearing must be filed with 
    the Office of the Secretary, either:
        (1) By delivery to the Docketing and Service Branch of the Office 
    of the Secretary at One White Flint North, 11555 Rockville Pike, 
    Rockville, MD 20852; or
        (2) By mail or telegram addressed to the Secretary, U.S. Nuclear 
    Regulatory Commission, Washington, DC 20555, Attention: Docketing and 
    Service Branch.
        In accordance with 10 CFR 2.1205(e), each request for a hearing 
    must also be served, by delivering it personally or by mail, to:
        (1) The applicant, Umetco Minerals Corporation, P.O. Box 1029, 
    Grand Junction, Colorado 81502, Attention: Pat Lyons; and
        (2) The NRC staff, by delivery to the Executive Director for 
    Operations, One White Flint North, 11555 Rockville Pike, Rockville, MD 
    20852 or by mail addressed to the Executive Director for Operations, 
    U.S. Nuclear Regulatory Commission, Washington, DC 20555.
        In addition to meeting other applicable requirements of 10 CFR Part 
    2 of the NRC's regulations, a request for a hearing filed by a person 
    other than an applicant must describe in detail:
        (1) The interest of the requestor in the proceeding;
        (2) How that interest may be affected by the results of the 
    proceeding, including the reasons why the requestor
    should be permitted a hearing, with particular reference to the factors 
    set out in Sec. 2.1205(g);
        (3) The requestor's areas of concern about the licensing activity 
    that is the subject matter of the proceeding; and
        (4) The circumstances establishing that the request for a hearing 
    is timely in accordance with Sec. 2.1205(c).
        The request must also set forth the specific aspect or aspects of 
    the subject matter of the proceeding as to which petitioner wishes a 
    hearing.
    
        Dated at Rockville, Maryland, this 30th day of October 1995.
    Joseph J. Holonich,
    Chief, High-Level Waste and Uranium Recovery Projects Branch, Division 
    of Waste Management, Office of Nuclear Material Safety and Safeguards.
    [FR Doc. 95-27413 Filed 11-3-95; 8:45 am]
    BILLING CODE 7590-01-P
    
    

Document Information

Published:
11/06/1995
Department:
Nuclear Regulatory Commission
Entry Type:
Notice
Action:
Notice of Receipt of Application from Umetco Minerals Corporation to change a site-reclamation milestone in Condition 59 of Source Material License SUA-648 for the Gas Hills, Wyoming Uranium Mill site Notice of Opportunity for a Hearing.
Document Number:
95-27413
Pages:
56070-56071 (2 pages)
Docket Numbers:
Docket Number 40-0299
PDF File:
95-27413.pdf