DEPARTMENT OF ENERGY
[Docket No. CP97-55-000, et al.]
NorAm Gas Transmission Company, et al.; Natural Gas Certificate
Filings
October 30, 1996.
Take notice that the following filings have been made with the
Commission:
1. NorAm Gas Transmission Company
[Docket No. CP97-55-000]
Take notice that on October 21, 1996, NorAm Gas Transmission
Company (NGT), 525 Milam Street, P.O. Box 21734, Shreveport, Louisiana
71151, filed in Docket No. CP97-55-000 a request pursuant to Sections
157.205 and 157.211 of the Commission's Regulations under the Natural
Gas Act (18 CFR 157.205, 157.211) for authorization to continue
operating a 2-inch tap and 2-inch U-Shape meter station, located in
Faulkner County, Arkansas, to provide transportation services to ARKLA,
a distribution division of NorAm Energy Corporation (ARKLA) under NGT's
blanket certificate issued in Docket No. CP82-384-000, pursuant to
Section 7(c) of the Natural Gas Act, all as more fully set forth in the
request that is on file with the Commission and open to public
inspection.
NGT proposes to continue operating a 2-inch tap and a 2-inch U-
Shape meter station on their Line B to provide transportation services
under Subpart G of Part 284 of the Commission's Regulations. NGT states
this tap was originally installed solely to provide services authorized
under Section 311 of the Commission's Regulations, to ARKLA, and is
located in Faulkner County, Arkansas.
NGT advises that the estimated volumes to be delivered through
these facilities are approximately 10,000 MMBtu annually and 30 MMBtu
on a peak day on a firm basis to ARKLA's new Rural Extension No. 1391,
consisting of 4,066 feet of 4-inch plastic pipe installed along state
highway right-
[[Page 57407]]
of-way. NGT states the facilities were constructed in October, 1996,
at an estimated cost of $3,316 and ARKLA will reimburse NGT $2,661 of
the total construction cost.
Comment date: December 16, 1996, in accordance with Standard
Paragraph G at the end of this notice.
2. Equitrans, Inc.
[Docket No. CP97-57-000]
Take notice that on October 21, 1996, Equitrans, Inc. (Equitrans),
3500 Park Lane, Pittsburgh, Pennsylvania 15275, filed in Docket No.
CP97-57-000 a request pursuant to Sections 157.205 and 157.212 of the
Commission's Regulations under the Natural Gas Act (18 CFR 157.205,
157.212) for authorization to install one delivery tap under
Equitrans's blanket certificate issued in Docket No. CP83-508-000 and
CP86-676-000 pursuant to Section 7 of the Natural Gas Act, all as more
fully set forth in the request that is on file with the Commission and
open to public inspection.
Equitrans proposes to install the proposed delivery tap on
Equitrans field gathering pipeline No. F-986 in Upshur County, West
Virginia. The tap will be instituted to provide transportation
deliveries to Equitable Gas for ultimate distribution to one
residential customer. Equitrans will charge Equitable the applicable
transportation rate contained in Equitrans FERC Gas Tariff on file with
and approved by the Commission. Equitrans projects that the 1 Mcf per
day of peak service requested within the entitlements of Equitable Gas,
and will not impact Equitrans peak day and annual deliveries. Equitrans
has sufficient capacity to accomplish the deliveries described herein
without detriment to its other customers.
Equitrans states that the new delivery tap is not prohibited by its
existing tariff and the total volumes delivered to Equitable Gas will
not exceed total volumes authorized prior to the request.
Comment date: December 16, 1996, in accordance with Standard
Paragraph G at the end of this notice.
3. NorAm Gas Transmission Company
[Docket No. CP97-62-000]
Take notice that on October 23, 1996, NorAm Gas Transmission
Company (NGT), 1600 Smith Street, Houston, Texas 77002, filed in the
above docket a request pursuant to Sections 157.205 and 157.211 of the
Regulations (18 CFR Sections 157.205 and 157.211) under its blanket
certificate in Docket Nos. CP82-384-000 and CP82-384-001 to construct
and operate certain facilities in Arkansas and Louisiana to deliver gas
to ARKLA, a distribution division of NorAm Energy Corp., all as more
fully set forth in the application which is on file with the Commission
and open to public inspection.
Specifically, NGT proposes to: (a) operate an existing 2-inch tap
on NGT's Line AC in Pike County, Arkansas for delivery of natural gas
to ARKLA's customers to other than the right-of-way grantor for whom
the tap was originally installed; (b) construct and operate a new 2-
inch delivery tap and 2-inch U-Shape meter station on NGT's Line F in
Bossier Parish, Louisiana, to provide an additional town border station
for ARKLA to serve its Princeton system and, (c) construct and operate
a new 2-inch delivery tap and 4-inch meter run on NGT's Line LIT-1 in
Caddo Parish, Louisiana, to provide service to ARKLA.
NGT states that the estimated volumes to be delivered through these
facilities are 76,083 MMBtu annually and 346 MMBtu on a peak day. The
facilities will be constructed at an estimated cost of $64,444, and
ARKLA will reimburse NGT for all costs.
NGT states that it will transport gas to ARKLA and provide service
under its tariff, that the volumes delivered are within ARKLA's
certificated entitlement and NGT's tariff does not prohibit the
addition of new delivery points. NGT states that it has sufficient
capacity to accomplish the deliveries without detriment or disadvantage
to its other customers.
Comment date: December 16, 1996, in accordance with Standard
Paragraph G at the end of this notice.
4. Florida Gas Transmission Company
[Docket No. CP97-68-000]
Take notice that on October 25, 1996, Florida Gas Transmission
Company (Applicant), 1400 Smith Street, Suite 3963, Houston, Texas
77251, filed under Section 7(b) of the Natural Gas Act, for authority
to abandon, a certificated firm transportation service for Southern
Natural Gas Company (SNG). The service is Applicant's Rate Schedule X-
22 in its FERC Gas Tariff, Original Volume No. 3. Applicant's proposal
is more fully set forth in the application which is on file with the
Commission and open to public inspection.
Applicant states that FGT and SNG have agreed to end the gas
transportation service agreement dated February 10, 1981 designated in
FGT's Tariff as Rate Schedule X-22. FGT states that the proposed
abandonment will not result in the abandonment of facilities or service
to other customers.
Comment date: November 20, 1996, in accordance with Standard
Paragraph F at the end of this notice.
5. Northern Natural Gas Company
[Docket No. CP97-69-000]
Take notice that on October 25, 1996, Northern Natural Gas Company
(Northern), 1111 South 103rd Street, Omaha, Nebraska 68124-1000, filed
in Docket No. CP97-69-000 a request pursuant to Sections 157.205 and
157.216 of the Commission's Regulations under the Natural Gas Act (18
CFR 157.205, 157.216) for authorization to abandon a segment of
pipeline in Saline County, Nebraska, under Northern's blanket
certificate issued in Docket No. CP82-401-000, pursuant to Section 7 of
the Natural Gas Act, all as more fully set forth in the request that is
on file with the Commission and open to public inspection.
Northern proposes to abandon and remove approximately 1.2 miles of
2-inch pipeline (the Wilber, Nebraska, branchline) and appurtenant
facilities. It is stated that the line was installed to serve the town
of Wilber, Nebraska, but is no longer needed to serve current customer
needs. It is explained that the customers are served by another line, a
3-inch loop line serving the Wilber Town Border Station, and that this
line has adequate capacity to serve the customers formerly served by
the 2-inch line. It is asserted that the proposed abandonment will not
result in the abandonment of service to any of Northern's existing
customers. It is further asserted that the customers served by the 2-
inch line have agreed to the abandonment.
Comment date: December 16, 1996, in accordance with Standard
Paragraph G at the end of this notice.
Standard Paragraphs
F. Any person desiring to be heard or make any protest with
reference to said filing should on or before the comment date file with
the Federal Energy Regulatory Commission, 888 First Street, NE.,
Washington, DC 20426, a motion to intervene or a protest in accordance
with the requirements of the Commission's Rules of Practice and
Procedure (18 CFR 385.211 and 385.214) and the Regulations under the
Natural Gas Act (18 CFR 157.10). All protests filed with the Commission
will be considered by it in determining the appropriate action to be
taken but will not serve to make the protestants parties to the
proceeding. Any person wishing to become a party to a proceeding or to
participate as a party in any hearing therein must file a motion to
intervene in accordance with the Commission's Rules.
[[Page 57408]]
Take further notice that, pursuant to the authority contained in
and subject to jurisdiction conferred upon the Federal Energy
Regulatory Commission by Sections 7 and 15 of the Natural Gas Act and
the Commission's Rules of Practice and Procedure, a hearing will be
held without further notice before the Commission or its designee on
this filing if no motion to intervene is filed within the time required
herein, if the Commission on its own review of the matter finds that a
grant of the certificate is required by the public convenience and
necessity. If a motion for leave to intervene is timely filed, or if
the Commission on its own motion believes that a formal hearing is
required, further notice of such hearing will be duly given.
Under the procedure herein provided for, unless otherwise advised,
it will be unnecessary for the applicant to appear or be represented at
the hearing.
G. Any person or the Commission's staff may, within 45 days after
the issuance of the instant notice by the Commission, file pursuant to
Rule 214 of the Commission's Procedural Rules (18 CFR 385.214) a motion
to intervene or notice of intervention and pursuant to Section 157.205
of the Regulations under the Natural Gas Act (18 CFR 157.205) a protest
to the request. If no protest is filed within the time allowed
therefore, the proposed activity shall be deemed to be authorized
effective the day after the time allowed for filing a protest. If a
protest is filed and not withdrawn within 30 days after the time
allowed for filing a protest, the instant request shall be treated as
an application for authorization pursuant to Section 7 of the Natural
Gas Act.
Lois D. Cashell,
Secretary.
[FR Doc. 96-28465 Filed 11-5-96; 8:45 am]