97-29339. ANR Pipeline Company; Notice of Request Under Blanket Authorization  

  • [Federal Register Volume 62, Number 215 (Thursday, November 6, 1997)]
    [Notices]
    [Page 60074]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 97-29339]
    
    
    
    [[Page 60074]]
    
    =======================================================================
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    
    Federal Energy Regulatory Commission
    [Docket No. CP98-47-000]
    
    
    ANR Pipeline Company; Notice of Request Under Blanket 
    Authorization
    
    October 31, 1997.
        Take notice that on October 24, 1997, ANR Pipeline Company (ANR), 
    500 Renaissance Center, Detroit, Michigan 48243, filed in Docket No. 
    CP98-47-000 a request pursuant to Sections 157.205 and 157.212 of the 
    Commission's Regulations under the Natural Gas Act (18 CFR 157.205 and 
    157.212) for authorization to install and operate a turbine meter at 
    its St. Henry Meter Station, located in Mercer County, Ohio, under 
    ANR's blanket certificate issued in Docket No. CP82-480-000, pursuant 
    to Section 7(c) of the Natural Gas Act, all as more fully set forth in 
    the request that is on file with the Commission and open to public 
    inspection.
        ANR proposes to install one 3-inch turbine meter at its existing 
    St. Henry Meter Station, located in Mercer County, Ohio. ANR states the 
    St. Henry Meter Station currently consists of one 4-inch turbine meter. 
    ANR declares it provides deliveries to West Ohio Gas Company at this 
    location. ANR asserts it is proposing to add the turbine meter at the 
    St. Henry Meter Station in order to meet customer demand that sometimes 
    exceeds the capability of the existing meter when gas pressure at the 
    station is low (less than 400 psig).
        ANR states the total cost of the proposed facility is estimated to 
    be approximately $57,500.
        Any person or the Commission's staff may, within 45 days after 
    issuance of the instant notice by the Commission, file pursuant to Rule 
    214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to 
    intervene or notice of intervention and pursuant to Section 157.205 of 
    the Regulations under the Natural Gas Act (18 CFR 157.205) a protest to 
    the request. If no protest is filed within the time allowed therefor, 
    the proposed activity shall be deemed to be authorized effective the 
    day after the time allowed for filing a protest. If a protest is filed 
    and not withdrawn within 30 days after the time allowed for filing a 
    protest, the instant request shall be treated as an application for 
    authorization pursuant to Section 7 of the Natural Gas Act.
    Lois D. Cashell,
    Secretary.
    [FR Doc. 97-29339 Filed 11-5-97; 8:45 am]
    BILLING CODE 6717-01-M
    
    
    

Document Information

Published:
11/06/1997
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
97-29339
Pages:
60074-60074 (1 pages)
Docket Numbers:
Docket No. CP98-47-000
PDF File:
97-29339.pdf