[Federal Register Volume 63, Number 215 (Friday, November 6, 1998)]
[Notices]
[Page 59989]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 98-29842]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
ER-FRL-5496-7]
Environmental Impact Statements and Regulations; Availability of
EPA Comments
Availability of EPA comments prepared October 19, 1998 Through
October 23, 1998 pursuant to the Environmental Review Process (ERP),
under Section 309 of the Clean Air Act and Section 102(2)(c) of the
National Environmental Policy Act as amended. Requests for copies of
EPA comments can be directed to the Office of Federal Activities at
(202) 564-7167. An explanation of the ratings assigned to draft
environmental impact statements (EISs) was published in FR dated April
10, 1998 (62 FR 17856).
Draft EISs
ERP No. D-DOA-G36149-OK. Rating LO, Double Creek Watershed Plan,
Implementation, Watershed Protection and Flood Prevention, National
Economic Development (NED), Town of Ramona, Washington and Osage
Counties, OK.
Summary: EPA had no objection to the selection of the lead agency's
preferred alternative as described in the DEIS.
ERP No. D-FAA-E51046-NC. Rating EC2, Charlotte/Douglas
International Airport, Construction and Operation, New Runway 17/35
(Future 18L/36R) Associated Taxiway Improvements, Master Plan
Development, Approval Airport Layout Plan (ALP) and COE Section 404
Permit, Mecklenburg County, NC.
Summary: EPA's review found that the noise analysis was deficient
and needs to be redone. Both general and transportation conformity
criteria must be met for the project to go forward.
ERP No. D-FHW-L40209-WA. Rating EC2, WA-16/Union Avenue Vicinity to
WA-302 Vicinity of Tacoma Improvements, Construction, Funding, Coast
Guard Permit, COE Section 10 and 404 Permits, Pierce County, WA.
Summary: EPA had concerns with the likely increase of urban growth
and the resulting impact. EPA requested that these issues be fully
discussed in the final EIS.
ERP No. D-NOA-E39044-FL. Rating LO, Guana, Tolomato, Matanizas,
Site Designation, National Estuarine Research Reserve, Management Plan,
City of Jacksonville, St. Johns and Flagler Counties, FL.
Summary: EPA supports the proposed action.
ERP No. D-NOA-E39045-MS. Rating EC2, Grand Bay National Estuarine
Research Reserve (NERR), Designation, To Conduct Research, Educational
Project and Construction, East of the City of Biloxi, Jackson County,
MS.
Summary: EPA requested additional information on phosphogypsum
waste storage facility impacts on ground surface water quality.
Comments were made on rock reed wastewater cell maintenance problems
compared to conventional septic tank systems.
ERP No. DS-NOA-A64057-00. Rating EC2, Comprehensive Amendment
Addressing Essential Fish Habitat in Fishery Management Plans for the
South Atlantic Region for Shrimp, Red Drum, Coral, Coral Reefs and
Live/Hard Bottom Habitat, Spiny Lobster, Snapper-Grouper, Coastal
Migratory Pelagics and Golden Crab, South Atlantic Region.
Summary: EPA expressed environmental concerns that the Calico
Scallop Fishery Management Plan contained data that was too old to
fully assess impact of the fishery and collateral impacts threatened
and endangered species. EPA requested that these issues be fully
discussed in the next environmental document.
Final EISs
ERP No. F-BLM-G65021-00. Rio Grande Corridor Coordinated Resource
Management Plan and Taos Management Plan Amendment, Activity-Level-
Plans, Implementation, NM and CO.
Summary: Review of the Final EIS was not deemed necessary. No
formal comment letter was sent to the preparing agency.
ERP No. F-DOE-L08053-00. Lower Valley Transmission Project,
Construction of a New 115 kV Transmission Line from Swan Valley
Substation near Swan Valley, Special-Use-Permits, Bonneville and Teton
Counties, ID and Teton County, WY.
Summary: Review of the final EIS was not deemed necessary. No
formal comment letter was sent to the preparing agency.
ERP No. F-JUS-K80035-CA. Service Processing Center (SPC) for
Detainees, Construction and Operation, Possible Sites, Stockton and
Tracy Sites, San Joaquin Counties, CA.
Summary: Review of the Final EIS was not deemed necessary. No
formal comment letter was sent to the preparing agency.
Dated: November 3, 1998.
William D. Dickerson,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. 98-29842 Filed 11-5-98; 8:45 am]
BILLING CODE 6560-50-U