-
Start Preamble
AGENCY:
Coast Guard, DOT.
ACTION:
Notice of temporary deviation from regulations.
SUMMARY:
The Commander, Eighth Coast Guard District has issued a temporary deviation from the regulation governing the operation of the Elgin, Joliet & Eastern Railway Drawbridge, across the Illinois Waterway, mile 290.1 at Joliet, Illinois. This deviation allows the drawbridge to remain closed to navigation for three separate 28-hour increments starting at 6 a.m., November 4, 2002, and ending at 10 a.m., November 15, 2002, Central Standard Time. The deviation is necessary to facilitate maintenance work on the bridge that is essential to the continued safe operation of the drawbridge.
DATES:
This temporary deviation is effective from 6 a.m., November 4, 2002, until 10 a.m., November 15, 2002.
ADDRESSES:
Materials referred to in this rule are available for inspection or copying at the office of the Eighth Coast Guard District, Bridge Administration Branch, Commander (obr), Eighth Coast Guard District, 1222 Spruce Street, St. Louis, MO 63103-2832, between 8 a.m. and 4 p.m., Monday through Friday, except federal holidays. The Bridge Administration Branch maintains the Start Printed Page 67552public docket for this temporary deviation.
Start Further InfoFOR FUTHER INFORMATION CONTACT:
Roger K. Wiebusch, Bridge Administrator, Commander (obr), Eighth Coast Guard District, 1222 Spruce Street, St. Louis, MO 63103-2832, (314) 539-3900, extension 2378.
End Further Info End Preamble Start Supplemental InformationSUPPLEMENTARY INFORMATION:
The Elgin, Joliet & Eastern Railway Company requested a temporary deviation on September 23, 2002, for the operation of the drawbridge to allow the bridge owner time for preventative maintenance. The drawbridge operation regulations found at 33 CFR 117.393(d) require that the drawbridge be maintained in the open-to-navigation position and close only for the passage of rail traffic. This deviation allows the bridge to remain closed to navigation for four separate 28-hour intervals from 6 a.m., November 4, 2002, until 10 a.m., November 5, 2002, from 6 a.m., November 7, 2002, until 10 a.m., November 8, 2002, from 6 a.m., November 11, 2002, until 10 a.m., November 12, 2002 and from 6 a.m., November 14, 2002, until 10 a.m., November 15, 2002. Vessels not exceeding the vertical clearance of the drawbridge may pass under the drawbridge during repairs. There are no alternate routes for vessels transiting through mile 290.1 on the Illinois Waterway. The drawbridge will be incapable of opening for emergencies during the 28-hour repair periods.
The Elgin, Joliet & Eastern Railway drawbridge provides a vertical clearance of 24.6 feet above normal pool in the closed to navigation position. Navigation on the waterway consists primarily of commercial tows and recreational watercraft. In order to repair and replace gear reducers, roller bearings, gears and shafts, the bridge must be kept inoperative and in the closed to navigation position. This deviation has been coordinated with waterway users. No objections were received.
In accordance with 33 CFR 117.35(c), this work will be performed with all due speed in order to return the bridge to normal operation as soon as possible. This deviation from the operating regulations is authorized under 33 CFR 117.35.
Start SignatureDated: October 29, 2002.
Roger K. Wiebusch,
Bridge Administrator.
[FR Doc. 02-28134 Filed 11-5-02; 8:45 am]
BILLING CODE 4910-15-U
Document Information
- Effective Date:
- 11/4/2002
- Published:
- 11/06/2002
- Department:
- Coast Guard
- Entry Type:
- Rule
- Action:
- Notice of temporary deviation from regulations.
- Document Number:
- 02-28134
- Dates:
- This temporary deviation is effective from 6 a.m., November 4, 2002, until 10 a.m., November 15, 2002.
- Pages:
- 67551-67552 (2 pages)
- Docket Numbers:
- CGD08-02-025
- RINs:
- 2115-AE47: Drawbridge Regulations
- RIN Links:
- https://www.federalregister.gov/regulations/2115-AE47/drawbridge-regulations
- PDF File:
- 02-28134.pdf
- CFR: (1)
- 33 CFR 117