96-28643. North American Energy Services Company, et al. Electric Rate and Corporate Regulation Filings  

  • [Federal Register Volume 61, Number 217 (Thursday, November 7, 1996)]
    [Notices]
    [Pages 57667-57669]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 96-28643]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    [Docket No. EG97-5-000, et al.]
    
    
    North American Energy Services Company, et al. Electric Rate and 
    Corporate Regulation Filings
    
    October 31, 1996.
        Take notice that the following filings have been made with the 
    Commission:
    
    1. North American Energy Services Company
    
    [Docket No. EG97-5-000]
    
        Take notice that on October 21, 1996, North American Energy 
    Services Company, a Washington corporation, 999 Lake Drive, Suite 310, 
    Issaquah, Washington 98027 (the ``Applicant''), filed with the Federal 
    Energy Regulatory Commission an application for determination of exempt 
    wholesale generator (EWG) status pursuant to Part 365 of the 
    Commission's regulations.
        The Applicant will be engaged in managing daily operations and 
    maintenance of eligible facilities to be constructed in Argentina: the 
    77 MW Central Termica Patagonia power plant located near Comodoro 
    Rivadavia, Argentina, consisting of two General Electric Frame-6 simple 
    cycle gas turbine-generator sets and associated equipment and real 
    estate. The turbines are natural gas-fired only.
        Comment date: November 22, 1996, in accordance with Standard 
    Paragraph E at the end of this notice. The Commission will limit its 
    consideration of comments to those that concern the adequacy or 
    accuracy of the application
    
    2. Jorf Lasfar Energy Company SCA
    
    [Docket No. EG97-6-000]
    
        On October 23, 1996, Jorf Lasfar Energy Company SCA 
    (``Applicant''), with its principal office at c/o CMS Generation Co., 
    Fairlane Plaza South, 330 Town Center Drive, Suite 1000, Dearborn, 
    Michigan 48126, filed with the Federal Energy Regulatory Commission an 
    application for determination of exempt wholesale generator status 
    pursuant to Part 365 of the Commission's regulations.
        Applicant states that it is a company in the process of formation 
    under the laws of Morocco, and will operate two existing 330 MW coal-
    fired units and construct and operate two additional 348 MW units. 
    Electric energy produced by the Facility will be sold at wholesale to 
    the state-owned Office National de l'Electricite. In no event will any 
    electric energy be sold to consumers in the United States.
        Comment date: November 22, 1996, in accordance with Standard 
    Paragraph E at the end of this notice. The Commission will limit its 
    consideration of comments to those that concern the adequacy or 
    accuracy of the application.
    
    3. CMS Ensenada S.A.
    
    [Docket No. EG97-7-000]
    
        On October 29, 1996, CMS Ensenada S.A., Alsina 495, piso 5 (1087), 
    Capital Federal, Buenos Aires, Argentina, filed with the Federal Energy 
    Regulatory Commission an application for determination of exempt 
    wholesale generator status pursuant to Part 365 of the Commission's 
    regulations.
        CMS Ensenada S.A. is a subsidiary of CMS Generation Co., a Michigan 
    corporation, which is a wholly-owned indirect subsidiary of CMS Energy 
    Corporation, also a Michigan corporation. CMS Ensenada S.A. is 
    currently constructing a 128 megawatt natural gas-fired electric co-
    generation facility on the grounds of a refinery owned by YPF S.A. in 
    Ensenada, province of Buenos Aires, Argentina.
        Comment date: November 22, 1996, in accordance with Standard 
    Paragraph E at the end of this notice. The Commission will limit its 
    consideration
    
    [[Page 57668]]
    
    of comments to those that concern the adequacy or accuracy of the 
    application.
    
    4. P.H. Don Pedro, S.A.
    
    [Docket No. EG97-8-000]
    
        On October 29, 1996, P.H. Don Pedro, S.A., a corporation (sociedad 
    anonima) organized under the laws of Costa Rica (``Applicant''), with 
    its principal place of business at Santo Domingo de Heredia del Hotel 
    Bouganville 200 Mts. al Este de la Iglesia Catolica (Primera Entrada 
    Porton con Ruedas de Artilleria) Heredia, Costa Rica, filed with the 
    Federal Energy Regulatory Commission an application for determination 
    of exempt wholesale generator status pursuant to Part 365 of the 
    Commission's regulations.
        Applicant intends to own and operate an approximately 14 megawatt 
    (net), hydroelectric power production facility located in the District 
    of Sarapiqui, Canton of Alajuela, Province of Alajuela, Costa Rica.
        Comment date: November 22, 1996, in accordance with Standard 
    Paragraph E at the end of this notice. The Commission will limit its 
    consideration of comments to those that concern the adequacy or 
    accuracy of the application.
    
    5. Wholesale Power Services, Inc. Koch Power Services, Inc. Proven 
    Alternatives, Amoco Energy Trading Corporation, Entergy Power Marketing 
    Corp., Questar Energy Trading Company, SCANA Energy Marketing, Inc.
    
    [Docket Nos. ER93-730-004, ER95-218-007, ER95-473-006, ER95-1359-005, 
    ER95-1615-004, ER96-404-003, ER96-1086-002 (not consolidated)]
    
        Take notice that the following informational filings have been made 
    with the Commission and are on file and available for inspection and 
    copying in the Commission's Public Reference Room:
        On October 23, 1996, Wholesale Power Services, Inc. filed certain 
    information as required by the Commission's September 22, 1995, order 
    in Docket No. ER93-730-000.
        On October 29, 1996, Koch Power Services, Inc. filed certain 
    information as required by the Commission's January 4, 1995, order in 
    Docket No. ER95-218-000.
        On October 28, 1996, Proven Alternatives filed certain information 
    as required by the Commission's March 29, 1995, order in Docket No. 
    ER95-473-000.
        On October 29, 1996, Amoco Energy Trading Corporation filed certain 
    information as required by the Commission's November 29, 1995, order in 
    Docket No. ER95-1359-000.
        On October 28, 1996, Entergy Power Marketing Corp. filed certain 
    information as required by the Commission's February 14, 1996, order in 
    Docket No. ER95-1615-000.
        On October 29, 1996, SCANA Energy Marketing, Inc. filed certain 
    information as required by the Commission's May 13, 1996, order in 
    Docket No. ER96-1086-000.
        On October 23, 1996, Questar Energy Trading filed certain 
    information as required by the Commission's January 29, 1996, order in 
    Docket No. ER96-404-000.
    
    6. InterCoast Power Marketing Company, Rainbow Energy Marketing 
    Corporation, Electrade Corporation, JPower, Vantus Power Services, 
    Bonneville Fuels Management Corp., Power Providers, Inc.
    
    [Docket Nos. ER94-6-005, ER94-1061-010, ER94-1478-009, ER95-1421-006, 
    ER95-1614-007, ER96-659-003, ER96-2303-001 (not consolidated)]
    
        Take notice that the following informational filings have been made 
    with the Commission and are on file and available for inspection and 
    copying in the Commission's Public Reference Room:
        On October 28, 1996, InterCoast Power Marketing Company filed 
    certain information as required by the Commission's June 10, 1994, 
    order in Docket No. ER94-6-000.
        On October 28, 1996, Rainbow Energy Marketing Corporation filed 
    certain information as required by the Commission's June 10, 1994, 
    order in Docket No. ER94-1061-000.
        On October 28, 1996, Electrade Corporation filed certain 
    information as required by the Commission's August 25, 1994, order in 
    Docket No. ER94-1478-000.
        On October 24, 1996, JPower filed certain information as required 
    by the Commission's August 25, 1995, order in Docket No. ER95-1421-000.
        On October 25, 1996, Vantus Power Services filed certain 
    information as required by the Commission's October 20, 1995, order in 
    Docket No. ER95-1614-000.
        On October 25, 1996, Bonneville Fuels Management Corp. filed 
    certain information as required by the Commission's February 28, 1996, 
    order in Docket No. ER96-659-000.
        On October 28, 1996, Power Providers, Inc. filed certain 
    information as required by the Commission's September 3, 1996, order in 
    Docket No. ER96-2303-000.
    
    7. Vitol Gas and Electric, L.L.C. NorAm Energy Services, Inc. Phibro 
    Inc. El Paso Energy Marketing Company Heath Petra Resources, Inc. 
    LISCO, Inc. Mid-American Power, LLC
    
    [Docket Nos. ER94-155-015, ER94-1247-011, ER95-430-007, ER96-118-005, 
    ER96-381-004, ER96-1406-001, ER96-1858-002 (not consolidated)]
    
        Take notice that the following informational filings have been made 
    with the Commission and are on file and available for inspection and 
    copying in the Commission's Public Reference Room:
        On October 28, 1996, Vitol Gas and Electric, L.L.C. filed certain 
    information as required by the Commission's January 14, 1994, order in 
    Docket No. ER94-155-000.
        On October 25, 1996, NorAm Energy Services, Inc. filed certain 
    information as required by the Commission's July 25, 1994, order in 
    Docket No. ER94-1247-000.
        On October 24, 1996, Phibro Inc. filed certain information as 
    required by the Commission's June 9, 1995, order in Docket No. ER95-
    430-000.
        On October 25, 1996, El Paso Energy Marketing Company filed certain 
    information as required by the Commission's November 28, 1995, order in 
    Docket No. ER96-118-000.
        On October 25, 1996, Heath Petra Resources, Inc. filed certain 
    information as required by the Commission's December 20, 1995, order in 
    Docket No. ER96-381-000.
        On October 21, 1996, LISCO, Inc. filed certain information as 
    required by the Commission's June 10, 1996, order in Docket No. ER96-
    1406-000.
        On October 25, 1996, Mid-American Power, LLC filed certain 
    information as required by the Commission's June 16, 1996, order in 
    Docket No. ER96-1858-000.
    
    8. Tenaska Power Services Company Energy Source Power, Inc. Southern 
    Energy Marketing, Inc. J Power J.D. Loock & Associates Energyonline, 
    Inc. Paragon Gas Marketing
    
    [Docket Nos. ER94-389-009, ER94-1168-010, ER95-976-006, ER95-1421-005, 
    ER95-1826-003, ER96-138-002, ER96-380-004 (not consolidated)]
    
        Take notice that the following informational filings have been made 
    with the Commission and are on file and available for inspection and 
    copying in the Commission's Public Reference Room:
        On October 25, 1996, Tenaska Power Services Company filed certain 
    information as required by the Commission's May 26, 1994, order in 
    Docket No. ER94-389-000.
    
    [[Page 57669]]
    
        On October 16, 1996, Energy Source Power, Inc. filed certain 
    information as required by the Commission's July 8, 1994, order in 
    Docket No. ER94-1168-000.
        On October 25, 1996, Southern Energy Marketing, Inc. filed certain 
    information as required by the Commission's September 29, 1995 order in 
    Docket No. ER95-976-000.
        On October 21, 1996, JPower filed certain information as required 
    by the Commission's August 25, 1995 order in Docket No. ER95-1421-000.
        On October 21, 1996, J.D. Loock & Associates filed certain 
    information as required by the Commission's October 27, 1995 order in 
    Docket No. ER95-1826-000.
        On October 21, 1996, Energyonline, Inc. filed certain information 
    as required by the Commission's January 5, 1996 order in Docket No. 
    ER96-138-000.
        On October 25, 1996, Paragon Gas Marketing filed certain 
    information as required by the Commission's December 20, 1995 order in 
    Docket No. ER96-380-000.
    
    9. Florida Power & Light Company
    
    [Docket Nos. ER96-495-001 and ER96-1001-001]
    
        Take notice that on October 23, 1996, Florida Power & Light Company 
    (FPL), filed a refund report in the above-captioned dockets.
        Comment date: November 14, 1996, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    10. Southern Company Services, Inc.
    
    [Docket No. ER96-2573-002]
    
        Take notice that on October 25, 1996, Southern Company Services, 
    Inc. acting on behalf of Georgia Power Company has filed a Service 
    Agreement by and among itself, as agent for Georgia Power company and 
    the City of Hampton, Georgia pursuant to which Georgia Power will make 
    wholesale power sales to the City of Hampton for a term in excess of 
    one (1) year. This filing is submitted in compliance with the letter 
    order issued in this proceeding by the Federal Energy Regulatory 
    Commission on September 25, 1996. Southern Company Services, Inc., 76 
    FERC para. 61,321 (1996).
        Comment date: November 14, 1996, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    11. Central Louisiana Electric Company
    
    [Docket No. ER96-2677-001]
    
        Take notice that on October 21, 1996, Central Louisiana Electric 
    Company tendered for filing its compliance filing in the above-
    referenced docket.
        Comment date: November 14, 1996, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    12. PECO Energy Company
    
    [Docket No. ER96-2883-000]
    
        Take notice that on September 20, 1996, PECO Energy Company filed a 
    request to withdraw the filing of a letter dated August 2, 1996 in this 
    docket.
        Comment date: November 14, 1996, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    13. Louisville Gas and Electric Company
    
    [Docket No. ER97-141-000]
    
        Take notice that on October 21, 1996, Louisville Gas and Electric 
    Company (LG&E) tendered for filing a correction to its initial filing 
    of October 8, 1996, in the above-cited docket.
        Comment date: November 14, 1996, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    Standard Paragraph
    
        E. Any person desiring to be heard or to protest said filing should 
    file a motion to intervene or protest with the Federal Energy 
    Regulatory Commission, 888 First Street, N.E., Washington, D.C. 20426, 
    in accordance with Rules 211 and 214 of the Commission's Rules of 
    Practice and Procedure (18 CFR 385.211 and 18 CFR 385.214). All such 
    motions or protests should be filed on or before the comment date. 
    Protests will be considered by the Commission in determining the 
    appropriate action to be taken, but will not serve to make protestants 
    parties to the proceeding. Any person wishing to become a party must 
    file a motion to intervene. Copies of this filing are on file with the 
    Commission and are available for public inspection.
    Lois D. Cashell,
    Secretary.
    [FR Doc. 96-28643 Filed 11-06-96; 8:45 am]
    BILLING CODE 6717-01-P
    
    
    

Document Information

Published:
11/07/1996
Department:
Energy Department
Entry Type:
Notice
Document Number:
96-28643
Dates:
November 22, 1996, in accordance with Standard Paragraph E at the end of this notice. The Commission will limit its consideration of comments to those that concern the adequacy or accuracy of the application
Pages:
57667-57669 (3 pages)
Docket Numbers:
Docket No. EG97-5-000, et al.
PDF File:
96-28643.pdf