[Federal Register Volume 62, Number 216 (Friday, November 7, 1997)]
[Notices]
[Pages 60239-60240]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 97-29428]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP98-49-000]
K N Wattenberg Transmission Limited Liability Company; Notice of
Application
November 3, 1997.
Take notice that on October 24, 1997, K N Wattenberg Transmission
Limited Liability Company (K N Wattenberg), P.O. Box 281304, Lakewood,
Colorado 80228-8304, filed an abbreviated application in Docket No.
CP98-49-000,\1\ pursuant to Section 7(c) of the Natural Gas Act, as
amended, and Part 157 of the Commission's Regulations, for a
certificate of public convenience and necessity authorizing it to
acquire, construct and operate, as necessary certain pipeline and
related facilities designated as the Front Runner Pipeline, all as more
fully set forth in the application on file with the
[[Page 60240]]
Commission and open to public inspection.
---------------------------------------------------------------------------
\1\ K N Wattenberg states that this application is substantively
identical to its application filed on August 25, 1997, in Docket No.
CP97-707-000, which was dismissed without prejudice by the
Commission on October 15, 1997, due to the lack of sufficient market
data as required in Section 157.14 of the Commission's regulations.
---------------------------------------------------------------------------
In its filing, K N Wattenberg seeks authorization to: (1) Construct
certain pipeline facilities, including a 45-mile segment of 24-inch of
pipeline extending from the Rockport Hub to a location southwest of
Greeley, Colorado, perform any necessary pipeline rerouting, and
construct several gas supply receipt and delivery interconnects; (2)
acquire from its affiliate, K N Gas Gathering Company (KNGG),
approximately 34 miles of existing 16-inch and smaller pipeline which
will be converted to interstate transportation service and incorporated
into the Front Runner Pipeline; and (3) operate the Front Runner
Pipeline. K N Wattenberg states that the Front Runner Pipeline will be
approximately 109 miles long, including secondary laterals, and will
stretch from the emerging Rockport Hub, located south of Cheyenne,
Wyoming, to just north of the Denver metropolitan area near Brighton
and the Denver International Airport. Approximately 77 miles of the
Front Runner Pipeline will be constructed, with the remainder to be
required from KNGG. Upon completion, K N Wattenberg claims that the
Front Runner Pipeline will have a design capacity of approximately 254
MMcf per day flowing north to south into the Front Range of the Rocky
Mountains in Northern Colorado, thus providing a competitive
transportation alternative for growing markets in the area.
The estimated cost of constructing the Front Runner Pipeline is $31
million. K N Wattenberg proposes to charge incremental transportation
rates as initial rates for service on the Front Runner Pipeline and is
not requesting a pre-determination for authorization to charge rolled-
in rates. K N Wattenberg plans to commence construction of the proposed
facilities between September and December 1998, so that the system can
be placed in interstate service for late winter 1998-99 operation.
Thus, K N Wattenberg requests that the Commission approve the requested
authorizations by June 1998.
Any person desiring to be heard or to make any protest with
reference to said application should, on or before November 24, 1997,
file with the Federal Energy Regulatory Commission, 888 First Street,
N.E., Washington, D.C., 20426, a motion to intervene or a protest in
accordance with the requirements of the Commission's Rules of Practice
and Procedure (18 CFR 385.211 and 385.214) and the Regulations under
the Natural Gas Act (18 CFR 157.10). All protests filed with the
Commission will be considered by it in determining the appropriate
action to be taken but will not serve to make the protestants parties
to the proceeding. The Commission's Rules require that protestors
provide copies of their protests to the party or parties against whom
the protests are directed. Any person wishing to become a party to a
proceeding or to participate as a party in any hearing therein must
file a motion to intervene in accordance with the Commission's Rules.
A person obtaining intervenor status will be placed on the service
list maintained by the Secretary of the Commission and will receive
copies of all documents filed by the applicant and by every one of the
intervenors. An inrtervenor can file for rehearing of any Commission
order and can petition for court review of any such order. However, an
intervenor must submit copies of comments or any other filings it makes
with the Commission to every other intervenor in the proceeding, as
well as an original and 14 copies with the Commission.
A person does not have to intervene, however, in order to have
environmental comments considered. A person, instead, may submit two
copies of comments to the Secretary of the Commission. Commenters will
be placed on the Commission's environmental mailing list, will receive
copies of environmental documents and will be able to participate in
meetings associated with the Commission's environmental review process.
Commenters will not be required to serve copies of filed documents on
all other parties. However, commenters will not receive copies of all
documents filed by other parties or issued by the Commission and will
not have the right to seek rehearing or appeal the Commission's final
order to a federal court.
The Commission will consider all comments and concerns equally,
whether filed by commenters or those requesting intervenor status.
Take further notice that, pursuant to the authority contained in
and subject to the jurisdiction conferred upon the Federal Energy
Regulatory Commission by Sections 7 and 15 of the Natural Gas Act and
the Commission's Rules of Practice and Procedure, a hearing will be
held without further notice before the Commission or its designee on
this application if no motion to intervene is filed within the time
required herein, if the Commission on its own review of the matter
finds that a grant of the certificate is required by the public
convenience and necessity. If a motion for leave to intervene is timely
filed, or if the Commission on its own motion believes that a formal
hearing is required, further notice of such hearing will be duly given.
Under the procedure herein provided for, unless otherwise advised,
it will be unnecessary for K N Wattenberg to appear or be represented
at the hearing.
Linwood W. Watson, Jr.,
Acting Secretary.
[FR Doc. 97-29428 Filed 11-6-97; 8:45 am]
BILLING CODE 6717-01-M