On October 5, 2021, Nature and People First Arizona PHS, LLC (NFPA) filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of Black Mesa Pumped Storage Project North to be located in Navajo County, Arizona. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land-disturbing activities or otherwise enter upon lands or waters owned by others without the owners' express permission.
The proposed project would consist of the following: (1) a new upper reservoir with a surface area of 3,300 acres and a total storage capacity of 100,000 acre-feet at a normal maximum operating elevation of 7,910 feet average mean sea level (msl); (2) a new lower reservoir west with a surface area of 1,200 acres and a total storage capacity of 39,000 acre-feet at a normal maximum operating elevation of 5,960 feet msl; (3) a new lower reservoir middle with a surface area of 420 acres and a total storage capacity of 15,000 acre-feet at a normal maximum operating elevation of 5,960 feet msl; (4) a new lower reservoir south with a surface area of 1,300 acres and a total storage capacity of 46,000 acre-feet at a normal maximum operating elevation of 5,960 feet msl; (5) a 6,800-foot-long, 23-foot-diameter concrete lined tunnel and 1,800-foot-long with three 18-foot-diameter concrete lined draft tube tunnel penstock connecting the upper and lower reservoir west to the powerhouse; (6) a 9,400-foot-long, 23-foot-diameter concrete lined tunnel and 2,100-foot-long with three 18-foot-diameter concrete lined draft tube tunnel penstock connecting the upper and lower reservoir middle to the powerhouse; (7) a 6,750-foot-long, 23- Start Printed Page 67033 foot-diameter concrete lined tunnel and 2,500-foot-long with three 18-foot-diameter concrete lined draft tube tunnel penstock connecting the upper and lower reservoir south to the powerhouse; (8) three 320-foot-long, 60-foot-wide and 100-foot-high new underground powerhouses containing three turbine-generator units each with a total rated capacity of 2,250 megawatts; (9) a new 80-mile-long, 230-kilovolt (kV) transmission line connecting the powerhouses to either Powell Glen Canyon's existing substation or the Navajo Generating Station's substation; and (10) appurtenant facilities. The estimated annual power generation at the Black Mesa Pumped Storage North would be 4,927.5 gigawatt-hours.
Applicant Contact: Mr. Denis Payre, President and CEO, Nature and People First Arizona PHS, LLC 405 Waltham St, Suite 145 Lexington, MA 02421, Denis.Payre@natureandpeoplefirst.com.
FERC Contact: Ousmane Sidibe; Phone: (202) 502-6245.
Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Competing applications and notices of intent must meet the requirements of 18 CFR 4.36.
The Commission strongly encourages electronic filing. Please file comments, motions to intervene, notices of intent, and competing applications using the Commission's eFiling system at https://ferconline.ferc.gov/FERCOnline.aspx. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https://ferconline.ferc.gov/QuickComment.aspx. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-8659 (TTY). In lieu of electronic filing, you may submit a paper copy. Submissions sent via the U.S. Postal Service must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 20426. Submissions sent via any other carrier must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. The first page of any filing should include docket number P-15233-000.
More information about this project, including a copy of the application, can be viewed or printed on the “eLibrary” link of Commission's website at https://www.ferc.gov/ferc-online/elibrary/overview. Enter the docket number (P-15233) in the docket number field to access the document. For assistance, contact FERC Online Support.
Start SignatureDated: November 1, 2022.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2022-24235 Filed 11-4-22; 8:45 am]
BILLING CODE 6717-01-P
Document Information
- Published:
- 11/07/2022
- Department:
- Federal Energy Regulatory Commission
- Entry Type:
- Notice
- Document Number:
- 2022-24235
- Pages:
- 67032-67033 (2 pages)
- Docket Numbers:
- Project No. 15233-000
- PDF File:
- 2022-24235.pdf