01-28037. Transcontinental Gas Pipe Line Corporation; Notice of Tariff Filing  

  • Start Preamble November 2, 2001.

    Take notice that on October 25, 2001, Transcontinental Gas Pipe Line Corporation (Transco) tendered for filing as part of its FERC Gas Tariff, Third Revised Volume No. 1, certain revised tariff sheets, which sheets are enumerated in Appendix A attached to the filing. The proposed effective date of such tariff sheets is October 1, 2001.

    Transco states that the purpose of the instant filing is to track rate changes attributable to: (1) Storage service purchased from National Fuel Gas Supply Corporation (National Fuel) under its Rate Schedule SS-1, the costs of which are included in the rates and charges payable under Transco's Rate Schedules LSS and SS-2, (2) storage service purchased from Dominion Transmission, Inc. (Dominion) under its Rate Schedule GSS, the costs of which are included in the rates and charges payable under Transco's Rate Schedules GSS and LSS, (3) transportation service purchased from National Fuel under its Rate Schedule X-54, the costs of which are included in the rates and charges payable under Transco's Rate Schedule SS-2, (4) transportation service purchased from Texas Gas Transmission Corporations (Texas Gas) under its Rate Schedule FT, the costs of which are included in the rates and charges payable under Transco's Rate Schedule FT-NT, and (5) storage service purchased from Texas Eastern Transmission Corporation (TETCO) under its Rate Schedule X-28 the costs of which are included in the rates and charges payable under Transco's Rate Schedule S-2. This filing is being made pursuant to tracking provisions under Section 4 of Transco's Rate Schedule LSS, Section 4 of Transco's Rate Schedule SS-2, Section 4 of Transco's Rate Schedule FT-NT, Section 3 of Transco's Rate Schedule GSS and Section 26 of the General Terms and Conditions of Transco's Third Revised Volume No. 1 Tariff.

    Transco states that included in Appendices B through F attached to the filing are the explanations of the rate changes and details regarding the computation of the revised GSS, LSS, SS-2, FT-NT and S-2 rates.

    Transco states that copies of the filing are being mailed to affected customers and interested State Commissions. Start Printed Page 56550

    Any person desiring to be heard or to protest said filing should file a motion to intervene or a protest with the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426, in accordance with sections 385.214 or 385.211 of the Commission's Rules and Regulations. All such motions or protests must be filed in accordance with section 154.210 of the Commission's Regulations. Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceedings. Any person wishing to become a party must file a motion to intervene. Copies of this filing are on file with the Commission and are available for public inspection. This filing may also be viewed on the web at http://www.ferc.gov using the “RIMS” link, select “Docket#” and follow the instructions (call 202-208-2222 for assistance). Comments, protests and interventions may be filed electronically via the Internet in lieu of paper. See, 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's web site under the “e-Filing” link.

    Start Signature

    Linwood A. Watson, Jr.,

    Acting Secretary.

    End Signature End Preamble

    [FR Doc. 01-28037 Filed 11-7-01; 8:45 am]

    BILLING CODE 6717-01-P

Document Information

Published:
11/08/2001
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
01-28037
Pages:
56549-56550 (2 pages)
Docket Numbers:
Docket No. RP02-25-000
EOCitation:
of 2001-11-02
PDF File:
01-28037.pdf