2011-28846. Drawbridge Operation Regulation; Lake Washington Ship Canal, Seattle, WA  

  • Start Preamble

    AGENCY:

    Coast Guard, DHS.

    ACTION:

    Notice of temporary deviation from regulations.

    SUMMARY:

    The Commander, Thirteenth Coast Guard District, has issued a temporary deviation from the regulation governing the operation of the Burlington Northern Santa Fe Railway Bridge across the Lake Washington Ship Canal, mile 0.1, at Seattle, WA. The deviation is necessary to facilitate replacement of a counterweight trunnion bearing. This deviation allows the bridge to remain in the down or closed position during the maintenance period.

    DATES:

    This deviation is effective from 8 p.m. on November 8, 2011 through 5 p.m. on November 22, 2011.

    ADDRESSES:

    Documents mentioned in this preamble as being available in the docket are part of docket USCG-2011-0973 and are available online by going to http://www.regulations.gov,, inserting USCG-2011-0973 in the “Keyword” box and then clicking “Search”. They are also available for inspection or copying at the Docket Management Facility (M-30), U.S. Department of Transportation, West Building Ground Floor, Room W12-140, 1200 New Jersey Avenue SE., Washington, DC 20590, between 9 a.m. and 5 p.m., Monday through Friday, except Federal holidays.

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    If you have questions on this rule, call or email the Bridge Administrator, Coast Guard Thirteenth District; telephone (206) 220-7282 email randall.d.overton@uscg.mil. If you have questions on viewing the docket, call Renee V. Wright, Program Manager, Docket Operations, telephone (202) 366-9826.

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    Burlington Northern Santa Fe (BNSF) Railway has requested to not open the BNSF Rail Bascule Bridge across the Lake Washington Ship Canal, mile 0.1, for vessel traffic for a 14 day period to facilitate heavy maintenance on the bridge. The bridge provides 43 feet of vertical clearance above mean high water while in the closed position. Under normal operations this bridge opens on signal as required by 33 CFR 117.5 and 33 CFR 117.1051(c). The deviation period is from 8 p.m. November 8, 2011 through 5 p.m. November 22, 2011. This deviation allows the draw span of the BNSF Railway Bridge across the Lake Washington Ship Canal, mile 0.1, to remain in the closed position and to not open for maritime traffic from 8 p.m. November 8, 2011 through 5 p.m. November 22, 2011. This time frame was selected because it corresponds with the closure of the Army Corps of Engineering Hiram M. Chittenden lock immediately upstream or inland of the bridge on the Lake Washington Ship Canal. This stretch of the Lake Washington Ship Canal experiences heavy waterway usage and is utilized by vessels ranging from commercial tug and barge to pleasure craft. Mariners have been notified and will be kept informed of the bridge's operational status via the Coast Guard Notice to Mariners publication and Broadcast Notice to Mariners as appropriate. Vessels which do not require a bridge opening may continue to transit beneath the bridge during this closure period. Due to the nature of work being performed the draw span will be unable to open for maritime traffic during this maintenance period.

    In accordance with 33 CFR 117.35(e), the drawbridge must return to its regular operating schedule immediately at the end of the designated time period. This deviation from the operating regulations is authorized under 33 CFR 117.35.

    Start Signature

    Dated: October 26, 2011.

    Randall D. Overton,

    Bridge Administrator.

    End Signature End Supplemental Information

    [FR Doc. 2011-28846 Filed 11-7-11; 8:45 am]

    BILLING CODE 9110-04-P

Document Information

Comments Received:
0 Comments
Effective Date:
11/8/2011
Published:
11/08/2011
Department:
Coast Guard
Entry Type:
Rule
Action:
Notice of temporary deviation from regulations.
Document Number:
2011-28846
Dates:
This deviation is effective from 8 p.m. on November 8, 2011 through 5 p.m. on November 22, 2011.
Pages:
69131-69131 (1 pages)
Docket Numbers:
Docket No. USCG-2011-0973
PDF File:
2011-28846.pdf
CFR: (1)
33 CFR 117