2022-24276. Brainerd Public Utilities; Notice of Application Accepted for Filing, Soliciting Motions To Intervene and Protests, Ready for Environmental Analysis and Soliciting Comments, Recommendations, Preliminary Terms and Conditions, and ...  

  • Start Preamble

    Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection.

    a. Type of Application: New Major License.

    b. Project No.: 2533-062.

    c. Date filed: March 1, 2021.

    d. Applicant: Brainerd Public Utilities.

    e. Name of Project: Brainerd Hydroelectric Project (Brainerd Project).

    f. Location: On the Mississippi River, in the City of Brainerd, in Crow Wing County, Minnesota. The project does not occupy federal land.

    g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).

    h. Applicant Contact: Scott Magnuson, Superintendent, Brainerd Public Utilities, 8027 Highland Scenic Road, P.O. Box 273, Brainerd, MN 56401. Phone (218) 825-3213 or email at smagnuson@bpu.org.

    i. FERC Contact: Patrick Ely at patrick.ely@ferc.gov or (202) 502-8570.

    j. Deadline for filing comments, recommendations, terms and conditions, and prescriptions: 60 days from the issuance date of this notice; reply comments are due 105 days from the issuance date of this notice.

    The Commission strongly encourages electronic filing. Please file comments, recommendations, preliminary terms and conditions, and preliminary fishway prescriptions using the Commission's eFiling system at https://ferconline.ferc.gov/​FERCOnline.aspx. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https://ferconline.ferc.gov/​QuickComment.aspx. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-8659 (TTY). In lieu of electronic filing, you may submit a paper request. Submissions sent via the U.S. Postal Service must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 20426. Submissions sent via any other carrier must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. The first page of any filing should include docket number P-2533-062.

    The Commission's Rules of Practice require all intervenors filing documents with the Commission to serve a copy of that document on each person on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a Start Printed Page 67477 particular resource agency, they must also serve a copy of the document on that resource agency.

    k. This application has been accepted for filing and is now ready for environmental analysis.

    The Council on Environmental Quality (CEQ) issued a final rule on April 20, 2022, revising the regulations under 40 CFR parts 1502, 1507, and 1508 that federal agencies use to implement the National Environmental Policy Act (NEPA) (see National Environmental Policy Act Implementing Regulations Revisions, 87 FR 23,453-70). The final rule became effective on May 20, 2022. Commission staff intends to conduct its NEPA review in accordance with CEQ's new regulations.

    l. The Brainerd Project consists of the following facilities: (1) a short left embankment; (2) a 256-foot-long powerhouse containing five turbine generators with a totaled installed capacity of 2.9425 megawatts (MW); (3) a 78-foot-long slide gate section; (4) a 207-foot-long bascule (crest) gate section; (5) a single 20-foot-wide steel Tainter gate; (6) a 200-foot-long right embankment; (7) a 236-foot-long, 2.4-kilovolt overhead transmission line; (8) a 25-foot-high dam; and (9) 2,500-acre impoundment.

    The Brainerd Project is operated in a run-of-river mode with an estimated annual energy production of approximately 19,392 megawatt hours. Brainerd Public Utilities proposes to continue operating the project as a run-of-river facility and does not propose any new construction to the project. A license amendment allows for a sixth turbine generator unit, which would increase the total installed capacity to 3.5425 MW. The sixth turbine generator unit has not yet been installed. See 156 FERC ¶ 62,045 (2016).

    m. A copy of the application can be viewed on the Commission's website at http://www.ferc.gov using the “eLibrary” link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support. At this time, the Commission has suspended access to the Commission's Public Reference Room, due to the proclamation declaring a National Emergency concerning the Novel Coronavirus Disease (COVID-19), issued by the President on March 13, 2020. For assistance, contact FERC at FERCOnllineSupport@ferc.gov or call toll-free, (886) 208-3676 or TTY, (202) 502-8659.

    You may also register online at http://www.ferc.gov/​docs-filing/​esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support.

    n. Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, and .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission's Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application.

    All filings must (1) bear in all capital letters the title “PROTEST”, “MOTION TO INTERVENE”, “COMMENTS,” “REPLY COMMENTS,” “RECOMMENDATIONS,” “PRELIMINARY TERMS AND CONDITIONS,” or “ PRELIMINARY FISHWAY PRESCRIPTIONS;” (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, recommendations, terms and conditions or prescriptions must set forth their evidentiary basis and otherwise comply with the requirements of 18 CFR 4.34(b). Agencies may obtain copies of the application directly from the applicant. A copy of any protest or motion to intervene must be served upon each representative of the applicant specified in the particular application. A copy of all other filings in reference to this application must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.

    o. The license applicant must file no later than 60 days following the date of issuance of this notice: (1) a copy of the water quality certification; (2) a copy of the request for certification, including proof of the date on which the certifying agency received the request; or (3) evidence of waiver of water quality certification. Please note that the certification request must be sent to the certifying authority and to the Commission concurrently.

    p. Procedural schedule: The application will be processed according to the following schedule. Revisions to the schedule will be made as appropriate.

    MilestoneTarget date
    Deadline for Filing Protest, Motion to Intervene, Comments, Recommendations, and Agency Terms and Conditions/PrescriptionsDecember 2022.
    Deadline for Filing Reply CommentsFebruary 2023.
    Start Signature

    Dated: November 1, 2022.

    Debbie-Anne A. Reese,

    Deputy Secretary.

    End Signature End Preamble

    [FR Doc. 2022-24276 Filed 11-7-22; 8:45 am]

    BILLING CODE 6717-01-P

Document Information

Published:
11/08/2022
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
2022-24276
Pages:
67476-67477 (2 pages)
Docket Numbers:
Project No. 2533-062
PDF File:
2022-24276.pdf