Northwest Pipeline Corporation; Notice of Request Under Blanket
Authorization
November 3, 1998.
Take notice that on October 23, 1998, Northwest Pipeline
Corporation (Northwest), 295 Chipeta Way, Salt Lake City, Utah 84108,
filed a request with the Commission in Docket No. CP99-33-000, pursuant
to Sections 157.205 and 157.211 of the Commission's Regulations under
the Natural Gas Act (NGA) for authorization to construct and operate
upgraded facilities at North Selah Meter Station in Yakima County,
Washington authorized in blanket certificate issued in Docket No. CP82-
433-000, all as more fully set forth in the request on file with the
Commission and open to public inspection.
Northwest proposes to upgrade the North Selah Meter Station at the
request of Cascade Natural Gas Company (Cascade) for additional
delivery capabilities. Northwest states that by installing a 4-inch
turbine meter and appurtenances and converting the existing meter to
operate as a bypass that the maximum design capacity of the meter
station would increase from 2,333 Dth per day at a 200 psig to
approximately 5,206 Dth per day at 290 psig. Northwest further states
that the total cost of the proposed upgrade of the North Selah Meter
Station is estimated to be $41,901, which would be reimbursed by
Cascade.
Any person or the Commission's staff may, within 45 days after the
Commission has issued this notice, file pursuant to Rule 214 of the
Commission's Procedural Rules (18 CFR 385.214) a motion to intervene or
notice of intervention and pursuant to Section 157.205 of the
Regulations under the
[[Page 60320]]
NGA (18 CFR 157.205) a protest to the request. If no protest is filed
within the allowed time, the proposed activity shall be deemed to be
authorized effective the day after the time allowed for filing a
protest. If a protest is filed and not withdrawn within 30 days after
the time allowed for filing a protest, the instant request shall be
treated as an application for authorization pursuant to Section 7 of
the NGA.
David P. Boergers,
Secretary.
[FR Doc. 98-29880 Filed 11-6-98; 8:45 am]
BILLING CODE 6717-01-M
Document Information
- Published:
- 11/09/1998
- Department:
- Federal Energy Regulatory Commission
- Entry Type:
- Notice
- Document Number:
- 98-29880
- Pages:
- 60319-60320 (2 pages)
- Docket Numbers:
- Docket No. CP99-33-000
- PDF File:
-
98-29880.pdf