98-29880. Northwest Pipeline Corporation; Notice of Request Under Blanket Authorization  

  • [Federal Register Volume 63, Number 216 (Monday, November 9, 1998)]
    [Notices]
    [Pages 60319-60320]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 98-29880]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    
    Federal Energy Regulatory Commission
    [Docket No. CP99-33-000]
    
    
    Northwest Pipeline Corporation; Notice of Request Under Blanket 
    Authorization
    
    November 3, 1998.
        Take notice that on October 23, 1998, Northwest Pipeline 
    Corporation (Northwest), 295 Chipeta Way, Salt Lake City, Utah 84108, 
    filed a request with the Commission in Docket No. CP99-33-000, pursuant 
    to Sections 157.205 and 157.211 of the Commission's Regulations under 
    the Natural Gas Act (NGA) for authorization to construct and operate 
    upgraded facilities at North Selah Meter Station in Yakima County, 
    Washington authorized in blanket certificate issued in Docket No. CP82-
    433-000, all as more fully set forth in the request on file with the 
    Commission and open to public inspection.
        Northwest proposes to upgrade the North Selah Meter Station at the 
    request of Cascade Natural Gas Company (Cascade) for additional 
    delivery capabilities. Northwest states that by installing a 4-inch 
    turbine meter and appurtenances and converting the existing meter to 
    operate as a bypass that the maximum design capacity of the meter 
    station would increase from 2,333 Dth per day at a 200 psig to 
    approximately 5,206 Dth per day at 290 psig. Northwest further states 
    that the total cost of the proposed upgrade of the North Selah Meter 
    Station is estimated to be $41,901, which would be reimbursed by 
    Cascade.
        Any person or the Commission's staff may, within 45 days after the 
    Commission has issued this notice, file pursuant to Rule 214 of the 
    Commission's Procedural Rules (18 CFR 385.214) a motion to intervene or 
    notice of intervention and pursuant to Section 157.205 of the 
    Regulations under the
    
    [[Page 60320]]
    
    NGA (18 CFR 157.205) a protest to the request. If no protest is filed 
    within the allowed time, the proposed activity shall be deemed to be 
    authorized effective the day after the time allowed for filing a 
    protest. If a protest is filed and not withdrawn within 30 days after 
    the time allowed for filing a protest, the instant request shall be 
    treated as an application for authorization pursuant to Section 7 of 
    the NGA.
    David P. Boergers,
    Secretary.
    [FR Doc. 98-29880 Filed 11-6-98; 8:45 am]
    BILLING CODE 6717-01-M
    
    
    

Document Information

Published:
11/09/1998
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
98-29880
Pages:
60319-60320 (2 pages)
Docket Numbers:
Docket No. CP99-33-000
PDF File:
98-29880.pdf