98-29885. Notice of Competing Application Ready for Environmental Analysis  

  • [Federal Register Volume 63, Number 216 (Monday, November 9, 1998)]
    [Notices]
    [Pages 60331-60332]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 98-29885]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    
    Federal Energy Regulatory Commission
    
    
    Notice of Competing Application Ready for Environmental Analysis
    
    November 3, 1998.
        a. Type of Application: Major New License.
        b. Project No.: P-11607-000.
        c. Date Filed: August 29, 1997, as amended on January 30, 1998.
        d. Competing Applicant(s): Holyoke Gas & Electric Department, 
    Ashburnham Municipal Light Plant, and Massachusetts Municipal Wholesale 
    Electric Company.
        e. Name of Project: Holyoke Hydroelectric Project.
        f. Location: On the Connecticut River in Hampden, Hampshire, and 
    Franklin Counties, Massachusetts.
        g. Filed Pursuant to: Federal Power Act, 16 U.S.C. Secs. 791(a)-
    825(r).
        h. Competing Applicant(s) Contact:
    
    George E. Leary, Manager, Holyoke Gas & Electric Department, 99 Suffolk 
    Street, Holyoke, MA 01040 (413) 536-9311.
    Roger W. Bacon, Director, Power Services Division, Mass. Municipal 
    Wholesale Elec. Company, Randall Road, P.O. Box 426, Ludlow, MA 01056, 
    (413) 589-1041
    Stanley Herriott, General Manager, Ashburnham Municipal Light Plant, 78 
    Central Street, P.O. Box 823, Ashburnham, MA 01430, (508) 827-4423.
    
        i. FERC Contact: Allan Creamer (202) 219-0365.
        j. Comment Date: See attached paragraph D10.
        k. Status of Environmental Analysis: This application, as amended, 
    has been accepted, and, pursuant to Sec. 4.30(b)(25), is ready for 
    environmental at this time--see attached paragraph D10. The Commission 
    acknowledges that information related to water quality studies in the 
    project's bypassed reach has not been filed. However, the study itself 
    has been completed, and is currently being reviewed by various resource 
    agencies. This information, including agency comments, is expected to 
    be filed by November 15, 1998. The results of the water quality study, 
    as well as any other information asked for
    
    [[Page 60332]]
    
    during the environmental analysis, will be considered during the 
    preparation of the environmental impact statement once it's been filed 
    with the Commission. The application and additional information is 
    substantially complete, and the environmental analysis will proceed on 
    the issues as set forth in Scoping Document 2 and in the application 
    materials.
        l. Description of Project: The proposed run-of-river project would 
    consist of the following features: (1) an approximately 1,000-foot-long 
    masonry dam to elevation 97.47 feet National Geodetic Vertical datum, 
    topped with a 3.1-foot-high rubber dam; (2) upstream and downstream 
    fish passage facilities; (3) the Fish Lift Park adjoining the dam; (4) 
    a 2,290-acre reservoir that extends approximately 25 miles upstream; 
    (5) a three-level canal system adjacent to the river with headgates at 
    the dam; (6) six separate hydroelectric facilities, named Hadley Falls 
    Station, Riverside Station, Boatlock Station, Beebe-Holbrook Units, 
    Skinner Unit and Chemical Units, and except for the Hadley Falls 
    Station which has its intake structure adjacent to the canal headgate 
    structure, the facilities withdraw water from the canal system; (7) a 
    total nameplate capacity of 58,756 kilowatts (kW), consisting of the 
    existing 43,756 kW project plus a 15,000 kW expansion at the Hadley 
    Falls Station; (8) transmission line connections; and (9) appurtenant 
    facilities. The estimated average annual generation is about 212,000 
    megawatt-hours (MWh), which would increase to about 262,750 MWh after 
    completing the expansion in 2006.
        m. Purpose of Project: The power generated by the project would be 
    used within the Holyoke Gas & Electric Department's distribution 
    system, with a portion sold to the Massachusetts Municipal Wholesale 
    Electric Company.
        n. This notice also consists of the following standard paragraphs: 
    D10.
        o. Available Locations of Application: A copy of the application, 
    as amended and supplemented, is available for inspection and 
    reproduction at the Commission's Public Reference and Files and 
    Maintenance Branch, located at 888 First Street, N.E., Room 2A-1, 
    Washington, D.C. 20426, or by calling (202) 208-2326. Copies are also 
    available for inspection and reproduction at the Holyoke Gas & Electric 
    Department, 99 Suffolk Street, Holyoke, Massachusetts, 01040.
        D10. Filing and Service of Responsive Documents--The application is 
    ready for environmental analysis at this time, and the Commission is 
    requesting comments, reply comments, recommendations, terms and 
    conditions, and prescriptions.
        The Commission directs, pursuant to Section 4.34(b) of the 
    Regulations (see Order No. 533 issued May 8, 1991, 56 FR 23108, May 20, 
    1991) that all comments, recommendations, terms and conditions and 
    prescriptions concerning the application be filed with the Commission 
    within 60 days from the issuance date of this notice. All reply 
    comments must be filed with the Commission within 105 days from the 
    date of this notice.
        Anyone may obtain an extension of time for these deadlines from the 
    Commission only upon a showing of good cause or extraordinary 
    circumstances in accordance with 18 CFR 385.2008.
        All filings must (1) bear in all capital letters the title 
    ``COMMENTS'', ``REPLY COMMENTS'', ``RECOMMENDATIONS,'' ``TERMS AND 
    CONDITIONS,'' or ``PRESCRIPTIONS;'' (2) set forth in the heading the 
    name of the applicant and the project number of the application to 
    which the filing responds; (3) furnish the name, address, and telephone 
    number of the person submitting the filing; and (4) otherwise comply 
    with the requirements of 18 CFR 385.2001 through 385.2005. All 
    comments, recommendations, terms and conditions or prescriptions must 
    set forth their evidentiary basis and otherwise comply with the 
    requirements of 18 CFR 4.34(b). Agencies may obtain copies of the 
    application directly from the applicant. Any of these documents must be 
    filed by providing the original and the number of copies required by 
    the Commission's regulations to: The Secretary, Federal Energy 
    Regulatory Commission, 888 First Street, N.E., Washington, D.C. 20426. 
    An additional copy must be sent to Director, Division of Project 
    Review, Office of Hydropower Licensing, Federal Energy Regulatory 
    Commission, at the above address. Each filing must be accompanied by 
    proof of service on all persons listed on the service list prepared by 
    the Commission in this proceeding, in accordance with 18 CFR 4.34(b), 
    and 385.2010.
    David P. Boergers,
    Secretary.
    [FR Doc. 98-29885 Filed 11-6-98; 8:45 am]
    BILLING CODE 6717-01-M
    
    
    

Document Information

Published:
11/09/1998
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
98-29885
Dates:
See attached paragraph D10.
Pages:
60331-60332 (2 pages)
PDF File:
98-29885.pdf