98-29981. Canadian National Railway Company, Grand Trunk Corporation, and Grand Trunk Western Railroad IncorporatedControlIllinois Central Corporation, Illinois Central Railroad Company, Chicago, Central and Pacific Railroad Company, and Cedar River ...  

  • [Federal Register Volume 63, Number 216 (Monday, November 9, 1998)]
    [Notices]
    [Pages 60441-60442]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 98-29981]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF TRANSPORTATION
    
    Surface Transportation Board
    [Finance Docket No. 33556]
    
    
    Canadian National Railway Company, Grand Trunk Corporation, and 
    Grand Trunk Western Railroad Incorporated--Control--Illinois Central 
    Corporation, Illinois Central Railroad Company, Chicago, Central and 
    Pacific Railroad Company, and Cedar River Railroad Company
    
    AGENCY: Surface Transportation Board.
    
    
    [[Page 60442]]
    
    
    ACTION: Decision No. 19; Notice of Availability of Draft Environmental 
    Assessment and 30-day public comment period.
    
    -----------------------------------------------------------------------
    
    SUMMARY: The Surface Transportation Board's (Board) Section of 
    Environmental Analysis (SEA) issued a Draft Environmental Assessment 
    (Draft EA) for the proposed acquisition of control of Illinois Central 
    Corporation and its railroad affiliates (IC) by Canadian National 
    Railway Company (CN). The Draft EA is available for public review and 
    comment for 30 days. Public comments are due by December 11, 1998. Any 
    interested party may request a copy of the Draft EA or submit comments 
    on the Draft EA by following the procedures discussed below. The Draft 
    EA addresses potential acquisition-related environmental impacts and 
    includes SEA's preliminary environmental mitigation recommendations. In 
    addition, the Draft EA includes a Safety Integration Plan prepared by 
    CN and IC that explains how they propose to safely integrate their 
    separate operations if the Board approves the proposed acquisition. 
    After fully considering all public comments, SEA will consult with 
    appropriate public agencies and conduct additional environmental 
    analysis, as appropriate, in preparing a Final Environmental Assessment 
    (Final EA). SEA plans to issue the Final EA prior to the Board's Oral 
    Argument and Voting Conference, which are currently scheduled for March 
    1999. In making its final decision on the proposed acquisition, the 
    Board will consider the entire environmental record, including all 
    public comments; the Draft EA; and the Final EA, including SEA's 
    environmental mitigation recommendations. The Board plans to serve the 
    final written decision on May 25, 1999. Any party may file an 
    administrative appeal within 20 days of the Board's final written 
    decision.
    
    DATES: The Draft EA is available for public review and comment for 30 
    days. Public comments are due by December 11, 1998.
    
    ADDRESSES: All interested agencies, organizations, and individuals are 
    encouraged to comment on the Draft EA by submitting written comments 
    (include an original plus 10 copies) to the address listed below by 
    December 11, 1998, the close of the comment period:
    Office of the Secretary, Case Control Unit, Finance Docket No. 33556, 
    Surface Transportation Board, 1925 K Street, N.W., Washington, DC 
    20423-001, Attn: Elaine K. Kaiser, Environmental Project Director, 
    Environmental Filing
    
    FOR FURTHER INFORMATION CONTACT: To request a copy of the Draft EA or 
    further information on the proposed CN/IC acquisition, interested 
    parties may call SEA's toll-free Environmental Hotline at 1-888-869-
    1997 (TDD for the hearing impaired: (202) 565-1695), or access SEA's 
    website for the CN/IC acquisition at http://www.cnicacquisition.com. 
    For additional information regarding environmental issues, or the 
    environmental review process, contact SEA's Project Manager for the 
    proposed CN/IC acquisition, Michael Dalton, at (202) 565-1530.
    
    SUPPLEMENTARY INFORMATION: On July 15, 1998, CN and IC, collectively 
    referred to as CN/IC or applicants, filed a joint application 
    1 with the Board seeking authority for CN to acquire control 
    of IC. The proposed CN/IC system would extend to both the east and west 
    coasts of North America and the Gulf of Mexico. The Chicago area would 
    serve as the hub of the combined system. This new system would cover 
    approximately 18,670 miles of rail lines and related facilities, of 
    which approximately 4,520 miles would be in the United States. The 
    applicants state that integrating CN and IC operations would allow both 
    rail systems to provide more reliable, efficient, and competitive 
    service. The applicants also state that they anticipate relatively 
    minor changes in rail operations as a result of the proposed 
    acquisition. The applicants have proposed no rail line abandonments and 
    only five minor construction projects (one rail line connection and 
    four rail yard bypass tracks) as part of the proposed acquisition.
    
        \1\ Canadian National Railway Company, Grand Trunk Corporation, 
    and Grand Trunk Western Railroad Incorporated--Control--Illinois 
    Central Corporation, Illinois Central Railroad Company, Chicago, 
    Central and Pacific Railroad Company, and Cedar River Railroad 
    Company, STB Finance Docket No. 33556.
    ---------------------------------------------------------------------------
    
        By the Board, Elaine K. Kaiser, Chief of the Section of 
    Environmental Analysis.
    Vernon A. Williams,
    Secretary.
    [FR Doc. 98-29981 Filed 11-6-98; 8:45 am]
    BILLING CODE 4915-00-P
    
    
    

Document Information

Published:
11/09/1998
Department:
Surface Transportation Board
Entry Type:
Notice
Action:
Decision No. 19; Notice of Availability of Draft Environmental Assessment and 30-day public comment period.
Document Number:
98-29981
Dates:
The Draft EA is available for public review and comment for 30 days. Public comments are due by December 11, 1998.
Pages:
60441-60442 (2 pages)
Docket Numbers:
Finance Docket No. 33556
PDF File:
98-29981.pdf