2012-27410. Lock+ Hydro Friends Fund XLII, LLC; Notice of Application Accepted for Filing and Soliciting Motions To Intervene and Protests
-
Start Preamble
Take notice that the following hydroelectric application has been filed Start Printed Page 67353with the Commission and is available for public inspection.
a. Type of Application: Major Original License
b. Project No.: 13739-002
c. Date filed: September 17, 2012
d. Applicant: Lock+ Hydro Friends Fund XLII, LLC
e. Name of Project: Braddock Locks and Dam Hydroelectric Project
f. Location: At the existing U.S. Army Corps of Engineers' Braddock Locks and Dam on the Monongahela River, in Allegheny County, Pennsylvania. The project would occupy about 0.19 acre of federal lands.
g. Filed Pursuant to: Federal Power Act 16 USC 791(a)-825(r).
h. Applicant Contact: Mr. Mark R. Stover, Lock+TM Hydro Friends Fund XLII, LLC, c/o Hydro Green Energy, LLC, 900 Oakmont Lane, Suite 310, Westmont, IL 60559; (877) 556-6566 ext. 711; email—mark@hgenergy.com.
i. FERC Contact: John Mudre at (202) 502-8902; or email at john.mudre@ferc.gov.
j. Deadline for filing motions to intervene and protests: 60 days from the issuance date of this notice.
All documents may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web site http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll free at 1-866-208-3676, or for TTY, (202) 502-8659. Although the Commission strongly encourages electronic filing, documents may also be paper-filed. To paper-file, mail an original and seven copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426.
The Commission's Rules of Practice and Procedures require all intervenors filing documents with the Commission to serve a copy of that document on each person on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency.
k. This application has been accepted for filing, but is not ready for environmental analysis at this time.
l. The proposed project would utilize the existing U.S. Army Corps of Engineers' Braddock Locks and Dam and the Braddock Pool, and would consist of the following new facilities: (1) A new powerhouse with five turbine-generators having a total installed capacity of 3,750 kilowatts; (2) a new approximately 3,450-foot-long, 23-kilovolt electric distribution line; (3) a switchyard and control room; and (4) appurtenant facilities. The average annual generation is estimated to be 25,020 megawatt-hours.
The proposed project would deploy hydropower turbines within a patented “Large Frame Module” (LFM) that would be deployed on the south (river left) side of the dam, opposite the location of the existing navigational locks and at the upstream face of the existing left closure weir. The proposed modular, low environmental impact powerhouse would be approximately 60.4 feet long, 16.6 feet wide, and 40 feet high, and constructed of structural-grade steel. The powerhouse will bear on a concrete foundation on rock that is anchored to the existing left closure weir. A trash rack with 6-inch openings would be placed at the powerhouse intake to increase safety and protect the turbines from large debris.
m. A copy of the application is available for review at the Commission in the Public Reference Room or may be viewed on the Commission's Web site at http://www.ferc.gov using the “eLibrary” link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support. A copy is also available for inspection and reproduction at the address in item h above.
You may also register online at http://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support.
n. Any qualified applicant desiring to file a competing application must submit to the Commission, on or before the specified intervention deadline date, a competing development application, or a notice of intent to file such an application. Submission of a timely notice of intent allows an interested person to file the competing development application no later than 120 days after the specified intervention deadline date. Applications for preliminary permits will not be accepted in response to this notice.
A notice of intent must specify the exact name, business address, and telephone number of the prospective applicant, and must include an unequivocal statement of intent to submit a development application. A notice of intent must be served on the applicant(s) named in this public notice.
Anyone may submit a protest or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, 385.211, and 385.214. In determining the appropriate action to take, the Commission will consider all protests filed, but only those who file a motion to intervene in accordance with the Commission's Rules may become a party to the proceeding. Any protests or motions to intervene must be received on or before the specified deadline date for the particular application.
When the application is ready for environmental analysis, the Commission will issue a public notice requesting comments, recommendations, terms and conditions, or prescriptions.
All filings must (1) bear in all capital letters the title “PROTEST” or “MOTION TO INTERVENE,” “NOTICE OF INTENT TO FILE COMPETING APPLICATION,” or “COMPETING APPLICATION;” (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. Agencies may obtain copies of the application directly from the applicant. A copy of any protest or motion to intervene must be served upon each representative of the applicant specified in the particular application.
Start SignatureDated: November 2, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012-27410 Filed 11-8-12; 8:45 am]
BILLING CODE 6717-01-P
Document Information
- Comments Received:
- 0 Comments
- Published:
- 11/09/2012
- Department:
- Federal Energy Regulatory Commission
- Entry Type:
- Notice
- Document Number:
- 2012-27410
- Pages:
- 67352-67353 (2 pages)
- Docket Numbers:
- Project No. 13739-002
- PDF File:
- 2012-27410.pdf