2022-24394. Central Florida Rail Corridor's Request for Positive Train Control Safety Plan Approval and System Certification
-
Start Preamble
AGENCY:
Federal Railroad Administration (FRA), Department of Transportation (DOT).
ACTION:
Notice of availability and request for comments.
SUMMARY:
This document provides the public with notice that, on October 26, 2022, Central Florida Rail Corridor (CFRC) submitted its Positive Train Control Safety Plan (PTCSP), Version 4.1, dated October 21, 2022, to FRA's Secure Information Repository. CFRC asks FRA to approve its updated PTCSP and certify CFRC's Interoperable Electronic Train Management System (I-ETMS) as a mixed PTC system.
DATES:
FRA will consider comments received by January 9, 2023 before taking final action on the PTCSP. FRA may consider comments received after that date to the extent practicable and without delaying implementation of valuable or necessary modifications to a PTC system.
ADDRESSES:
Comments: Comments may be submitted by going to https://www.regulations.gov and following the online instructions for submitting comments.
Instructions: All submissions must include the agency name and the applicable docket number. The relevant PTC docket number for this railroad is Docket No. FRA-2011-0104. For convenience, all active PTC dockets are hyperlinked on FRA's website at https://railroads.dot.gov/train-control/ptc/ptc-annual-and-quarterly-reports. All comments received will be posted without change to https://www.regulations.gov; this includes any personal information.
Start Further InfoFOR FURTHER INFORMATION CONTACT:
Gabe Neal, Staff Director, Signal, Train Control, and Crossings Division, telephone: 816-516-7168, email: Gabe.Neal@dot.gov.
End Further Info End Preamble Start Supplemental InformationSUPPLEMENTARY INFORMATION:
In its PTCSP, CFRC asserts that the I-ETMS it is implementing is a mixed PTC system as defined in Title 49 Code of Federal Regulations (CFR) 236.1015(e). The PTCSP describes CFRC's I-ETMS implementation and the associated I-ETMS safety processes, safety analyses, and test, validation, and verification processes used during the development of I-ETMS. The PTCSP also contains CFRC's operational and support requirements and procedures.
CFRC's PTCSP is available for review online at https://www.regulations.gov (Docket Number FRA-2011-0104). Interested parties are invited to comment on the PTCSP by submitting written comments or data. During its review of the PTCSP, FRA will consider any comments or data submitted. See49 CFR 236.1011(e). However, FRA may elect not to respond to any particular comment and, under 49 CFR 236.1009(d)(3), FRA maintains the authority to approve or disapprove the PTCSP at its sole discretion.
Privacy Act Notice
In accordance with 49 CFR 211.3, FRA solicits comments from the public to better inform its decisions. DOT posts these comments, without edit, including any personal information the commenter provides, to https://www.regulations.gov, as described in the system of records notice (DOT/ALL-14 FDMS), which can be reviewed at https://www.transportation.gov/privacy. See https://www.regulations.gov/privacy-notice for the privacy notice of regulations.gov. To facilitate comment tracking, we encourage commenters to provide their name, or the name of their organization; however, submission of names is completely optional. If you wish to provide comments containing proprietary or confidential information, please contact FRA for alternate submission instructions.
Start SignatureIssued in Washington, DC.
Carolyn R. Hayward-Williams,
Director, Office of Railroad Systems and Technology.
[FR Doc. 2022-24394 Filed 11-8-22; 8:45 am]
BILLING CODE 4910-06-P
Document Information
- Published:
- 11/09/2022
- Department:
- Federal Railroad Administration
- Entry Type:
- Notice
- Action:
- Notice of availability and request for comments.
- Document Number:
- 2022-24394
- Dates:
- FRA will consider comments received by January 9, 2023 before taking final action on the PTCSP. FRA may consider comments received after that date to the extent practicable and without delaying implementation of valuable or necessary modifications to a PTC system.
- Pages:
- 67747-67747 (1 pages)
- Docket Numbers:
- Docket No. FRA-2011-0104
- PDF File:
- 2022-24394.pdf
- Supporting Documents:
- » Central Florida Rail Corridor's Request for Positive Train Control Safety Plan Approval and System Certification
- » CFRC PTCIP Version 10.4 June 2022
- » RRS-210623-001 Three Host Railroads Joint Request to Amend Their Positive Train Control Safety Plans Approval
- » CFRC RFA to PTCIP and Revised PTCIP Version 10.3 - November 2019
- » Joint RFA to Railroads’ I-ETMS PTCSPs, Filed 5-26-2021
- » Central Florida Rail Corridor - SunRail (CFRC) Q4 2020 PTC Progress Report
- » Central Florida Rail Corridor - 'SunRail' (CFRC) Q1 2020 PTC Progress Report
- » Central Florida Rail Corridor - 'SunRail' (CFRC) 2019 Annual PTC Progress Report
- » Central Florida Rail Corridor - “SunRail” (CFRC) Q2 2019 PTC Progress Report
- » U.S.DOT/FRA - Decision