[Federal Register Volume 63, Number 238 (Friday, December 11, 1998)]
[Notices]
[Pages 68450-68451]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 98-33004]
=======================================================================
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-5497-7]
Environmental Impact Statements; Notice of Availability
RESPONSIBLE AGENCY: Office of Federal Activities, General Information
(202) 564-7167 or (202) 564-7153. Weekly receipt of Environmental
Impact Statements Filed November 30, 1998
[[Page 68451]]
Through December 04, 1998 Pursuant to 40 CFR 1506.9.
EIS No. 980488, FINAL SUPPLEMENT, EPA, LA, Atchafalaya River Bar
Channel Ocean Dredged Material Disposal Site Designation, Updated
Information, St. Mary Parish, LA , Due: January 11, 1999, Contact: Joe
Swick (214) 665-7456
EIS No. 980489, DRAFT EIS, IBR, CA, Groundwater Replenishment System,
Implementation to Repurifying Water from Orange County Water District
(OCWD) Orange County Sanitation District (OCSD), Funding and COE
Section 404 Permit, Orange County, CA, Due: February 01, 1999, Contact:
Del Kidd (702) 293-8698
EIS No. 980490, FINAL EIS, TVA, TN, GA, MS, VA, AL, KY, NC, Shoreline
Management Initiative: An Assessment of Residential Shoreline
Development Impacts in the Tennessee Valley, Mainstream Tennessee River
and Tributary Reservoirs in AL, KY, NC, TN, GA, MS and VA, Due: January
11, 1999, Contact: Harold M. Draper (423) 632-6889
EIS No. 980491, FINAL EIS, STA, NM, TX, Programmatic EIS--International
Bridge Crossing Project, Construction and Operation, Along the United
States-Mexico Border from EL Paso to Brownsville, TX, Presidential
Permit, NM and TX, Due: January 11, 1999, Contact: Eric Verwers (817)
978-0202.
EIS No. 980492, FINAL SUPPLEMENT, JUS, CA, Service Processing Center
(SPC) for Detainees, Construction and Operation, Possible Sites,
Stockton and Tracy Sites, San Joaquin Counties, CA, Due: January 11,
1999, Contact: William A. Kopitz (202) 307-1877
EIS No. 980493, DRAFT EIS, AFS, MT, Swamp Timber Sales Project,
Implementation, Kootenai National Forest, Fortine Ranger District,
Lincoln County, MT, Due: January 25, 1999, Contact: Robert G. Carlin
(406) 882-4451.
EIS No. 980494, FINAL EIS, COE, MN, WI, Duluth-Superior Harbor Phase
II, Dredge Material Management Plan, Cities of Duluth, St. Louis
County, MN and Douglas County, WI, January 11, 1999, Contact: Mr. Terry
A. Long (313) 226-6758.
EIS No. 980495, DRAFT EIS, FHW, IN, IN-641 Terre Haute Bypass, Improve
access between US 41 South to I-70 East of Terre Haute, Funding and COE
Section 404 Permit, Vigo County, IN, Due: March 01, 1999, Contact:
Douglas N. Head (317) 226-7487.
EIS No. 980496, DRAFT EIS, NPS, DC, The White House and President's
Park, Comprehensive Design Plan, Implementation of a Framework for
Future Management, Washington, D.C., Due: March 11, 1999, Contact:
James I. McDaniel (202) 619-6344.
EIS No. 980497, DRAFT EIS, FTA, WA, Central Link Light Rail Transit
Project, (Sound Transit), Construct and Operate an Electric Rail
Transit System, Funding and COE Section 10 and 404 Permit, In the
Cities of Seattle, Sea Tac and Tukwila, King County, WA, Due: February
05, 1998, Contact: Helen Knoll (206) 220-4464.
EIS No. 980498, DRAFT EIS, AFS, UT, Brighton Ski Resort Master
Development Plan Updated, Implementation, Wasatch-Cache National
Forest, Salt Lake City, UT, Due: January 26, 1999, Contact: Steve
Scheid (801) 943-9483.
Amended Notices
EIS No. 980396, DRAFT EIS, COE, AL, GA, FL, Apalachicola-Chattahochee-
Flint (AFC) River Basin Water Allocation, Allocation Formula Approval,
AL, FL and GA, Due: February 26, 1999, Contact: Joanne Brandt (334)
690-3260. Published FR 10-09-98--Review Period extended.
EIS No. 980401, DRAFT EIS, COE, AL, GA, Alabama-Coosa-Tallapoosa (ACT)
River Basin Compact, Water Allocation, several counties, AL and GA,
Due: February 26, 1999, Contact: Michael L. Eubank (334) 694-3861.
Published FR 10-09-98 Review Period Extended.
EIS No. 980435, DRAFT EIS, USA, GA, U.S.
Army/Fort Benning and The Consolidated Government of Columbus
Proposed Land Exchange, Muscogee and Chattahoochee Counties, GA, Due:
December 14, 1998, Contact: John Brent (706) 545-4766. Published FR-10-
30-98 EIS Status. Correction. Changed from Preliminary DEIS to DEIS.
EIS No. 980453, DRAFT EIS, NPS, TX, Lyndon B. Johnson National
Historical Park, Package 227, General Management Plan, Implementation,
Blanco and Gillespie Counties, TX, Due: December 28, 1998, Contact:
Leslie Starhart (830) 868-7128 ext. 226. Published FR 11-13-98
Correction to Telephone Number.
EIS No. 980460, DRAFT EIS, AFS, MT, Clancy-Unionville Vegetation
Manipulation and Travel Management Project, Implementation, Helene
National Forest, Helena Ranger District, Lewis and Clark and Jefferson
Counties, MT, Due: February 01, 1999, Contact: Dave Turner (406) 449-
5490.
Published FR-11-13-98--Review Period Extended.
Dated: December 8, 1998.
William D. Dickerson,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. 98-33004 Filed 12-10-98; 8:45 am]
BILLING CODE 6560-50-P