94-30481. Drawbridge Operation Regulations; Plum Island River, MA  

  • [Federal Register Volume 59, Number 237 (Monday, December 12, 1994)]
    [Unknown Section]
    [Page 0]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 94-30481]
    
    
    [[Page Unknown]]
    
    [Federal Register: December 12, 1994]
    
    
    =======================================================================
    -----------------------------------------------------------------------
    
    DEPARTMENT OF TRANSPORTATION
    
    Coast Guard
    
    33 CFR Part 117
    
    [CGD01-94-057]
    RIN 2115-AE47
    
     
    
    Drawbridge Operation Regulations; Plum Island River, MA
    
    AGENCY: Coast Guard, DOT.
    
    ACTION: Notice of proposed rulemaking.
    
    -----------------------------------------------------------------------
    
    SUMMARY: The Coast Guard is considering a change to the regulations 
    governing the Plum Island Bridge over the Plum Island River between 
    Newburyport and Plum Island, Massachusetts, by requiring advance notice 
    for openings at all times. This action is being proposed because there 
    have been increasingly fewer requests for bridge openings in recent 
    years. This will relieve the bridge owner of the unnecessary burden of 
    having personnel at the bridge at all times.
    
    DATES: Comments must be received on or before February 10, 1995.
    
    ADDRESSES: Comments should be mailed to Commander (obr), First Coast 
    Guard District, Captain John Foster Williams Federal Building, 408 
    Atlantic Ave, Boston, Massachusetts 02110-3350. Comments may also be 
    hand-delivered to this address. The comments and other materials 
    referenced in this notice will be available for inspection and copying 
    by appointment at the Captain John Foster Williams Federal Building, 
    Room 628, 408 Atlantic Avenue, Boston, Massachusetts. Normal office 
    hours are between 6:30 a.m. and 3 p.m., Monday through Friday, except 
    federal holidays.
    
    FOR FURTHER INFORMATION CONTACT:
    William C. Heming, Bridge Administrator, First Coast Guard District, 
    (212) 668-7170.
    
    SUPPLEMENTARY INFORMATION:
    
    Request for Comments
    
        Interested persons are invited to participate in this rulemaking by 
    submitting written views, comments, data, or arguments. Persons 
    submitting comments should include their names and addresses, identify 
    this rulemaking (CGD01-94-057), the specific section of this proposal 
    to which each comment applies, and give reasons for each comment. The 
    Coast Guard requests that all comments and attachments be submitted in 
    an unbound format suitable for copying and electronic filing. If not 
    practical, a second copy of any bounded material is requested. Persons 
    desiring acknowledgment that their comments have been received should 
    enclose a stamped, self-addressed post card or envelope.
        The Coast Guard will consider all comments received during the 
    comment period and may change this proposal in light of comments 
    received. The Coast Guard plans no public hearing. Persons may request 
    a public hearing by writing to the Commander (obr), First Coast Guard 
    District at the address listed under ADDRESSES. The request should 
    include reasons why a hearing would be beneficial. If the Coast Guard 
    determines that the opportunity for oral presentations will aid this 
    rulemaking, the Coast Guard will hold a public hearing at a time and 
    place announced by a later notice in the Federal Register.
    
    Drafting Information
    
        The drafters of this notice are Mr. John McDonald, First Coast 
    Guard District Bridge Branch, Project Manager and Lieutenant Commander 
    S.R. Watkins, First Coast Guard District Legal Office, Project Counsel.
    
    Background and Purpose
    
        The Plum Island Bridge over the Plum Island River between 
    Newburyport and Plum Island, Massachusetts has a vertical clearance of 
    13' above mean high water (MHW) and 21' above mean low water (MLW). The 
    proposed regulations will permit the bridge to open on signal April 1 
    to November 30; 5 a.m. to 9 p.m., if at least one hour advance notice 
    is given. At all other times the draw will open on signal if at least 
    three hours advance notice is given. There were few requests for 
    openings during 1993 (48) and 1992 (75). The Plum Island River is not 
    navigable except during high tide.
    
    Discussion of Proposed Amendments
    
        The Massachusetts Highway Department has requested a change to the 
    present operating regulations in 33 CFR 117.615 which allow the Plum 
    Island Bridge to open on signal from April 1 through November 30, 
    during daylight hours, two hours before to two hours after high tide. 
    At all other times the draw shall open on signal if at least three 
    hours notice is given. The proposed regulations will permit the draw to 
    open on signal April 1 to November 30; 5 a.m. to 9 p.m., if at least 
    one hour advance notice is given by calling the number posted at the 
    bridge. At all other times the draw will open on signal if at least 
    three hours advance notice is given. This change to the regulations is 
    being proposed due to the infrequent requests for openings. The 
    proposed change to the regulations will relieve the bridge owner of the 
    burden of having personnel at the bridge at all times. The change to 
    specific operating hours will help avoid any confusion that occurred 
    regarding actual sunrise and sunset. Additionally, the restriction from 
    two hours before and two hours after high tide has been removed. If the 
    mariners are able to transit the waterway they may request an opening 
    so long as they provide the required advance notice to the highway 
    department. The drawtenders will be on call to open the draw when the 
    advance notice is given.
    
    Regulatory Evaluation
    
        This proposal is not a significant regulatory action under section 
    3(f) of Executive Order 12866, and does not require an assessment of 
    potential costs and benefits under section 6(a)(3) of that order. It 
    has been exempted from review by the Office of Management and Budget 
    under that order. It is not significant under the regulatory policies 
    and procedures of the Department of Transportation (DOT) (44 FR 11040; 
    February 26, 1979). The Coast Guard expects the economic impact to be 
    so minimal that a full Regulatory Evaluation, under paragraph 10e of 
    the regulatory policies and procedures of DOT, is unnecessary. This 
    conclusion is based on the fact that the regulation will not prevent 
    mariners from transiting the Plum Island Bridge. Rather, it will only 
    require mariners to plan their transits and provide advance notice.
    
    Small Entities
    
        Under the Regulatory Flexibility Act (5 U.S.C. 601 et seq.), the 
    Coast Guard must consider whether this action will have a significant 
    economic impact on a substantial number of small entities. ``Small 
    entities'' include independently owned and operated small businesses 
    that are not dominant in their field and that otherwise qualify as 
    ``small business concerns'' under section 3 of the Small Business Act 
    (15 U.S.C. 632). Because of the reasons discussed in the Regulatory 
    Evaluation above, the Coast Guard certifies under 5 U.S.C. 605(b) that 
    this action, if adopted, will not have a significant economic impact on 
    a substantial number of small entities.
    
    Collection of Information
    
        This rule contains no collection of information requirements under 
    the Paperwork Reduction Act (44 U.S.C. 3501 et seq.).
    
    Federalism
    
        The Coast Guard has analyzed this proposal in accordance with the 
    principles and criteria contained in Executive Order 12612, and it has 
    been determined that this proposed regulation does not have sufficient 
    federalism implications to warrant preparation of a Federalism 
    Assessment.
    
    Environment
    
        The Coast Guard considered the environmental impact of this 
    proposal and concluded that, under section 2.B.2.e.(32)(e) of 
    Commandant Instruction M16475.1B, this proposal is categorically 
    excluded from further environmental documentation. A Categorical 
    Exclusion Determination is available in the docket for inspection or 
    copying where indicated under ADDRESSES.
    
    List of Subjects in 33 CFR Part 117
    
        Bridges.
    
    Regulations
    
        In consideration of the foregoing, the Coast Guard proposes to 
    amend part 117 of title 33, Code of Federal Regulations, as follows:
    
    PART 117--DRAWBRIDGE OPERATION REGULATIONS
    
        1. The authority citation for part 117 continues to read as 
    follows:
    
        Authority: 33 U.S.C. 499; 49 CFR 1.46; 33 CFR 1.05-1(g); section 
    117.255 also issued under the authority of Pub. L. 102-587, 106 
    Stat. 5039.
    
        2. Section 117.615 is revised to read as follows:
    
    
    Sec. 117.615  Plum Island River.
    
        The draw of the Plum Island Turnpike Bridge, mile 0.1 between 
    Newburyport and Plum Island, shall operate as follows:
        (a) From April 1 through November 30; 5 a.m. to 9 p.m., the draw 
    shall open on signal if at least one hour advance notice is given by 
    calling the number posted at the bridge. At all other times the draw 
    shall open on signal if at least three hours advance notice is given.
        (b) The owners of this bridge shall provide and keep in good 
    legible condition, clearance gauges for each draw with figures not less 
    than twelve (12) inches high, designed, installed and maintained 
    according to the provisions of Sec. 118.160 of this chapter.
    
        Dated: December 2, 1994.
    R.R. Clark,
    Captain, U.S. Coast Guard, Acting Commander, First Coast Guard 
    District.
    [FR Doc. 94-30481 Filed 12-9-94; 8:45 am]
    BILLING CODE 4910-14-M
    
    
    

Document Information

Published:
12/12/1994
Department:
Coast Guard
Entry Type:
Uncategorized Document
Action:
Notice of proposed rulemaking.
Document Number:
94-30481
Dates:
Comments must be received on or before February 10, 1995.
Pages:
0-0 (1 pages)
Docket Numbers:
Federal Register: December 12, 1994, CGD01-94-057
RINs:
2115-AE47: Drawbridge Regulations
RIN Links:
https://www.federalregister.gov/regulations/2115-AE47/drawbridge-regulations
CFR: (1)
33 CFR 117.615