2017-26546. Hazardous Materials: Announcement of the Department of Transportation's Decision on Electronically Controlled Pneumatic Braking  

  • Start Preamble

    AGENCY:

    Pipeline and Hazardous Materials Safety Administration (PHMSA), DOT.

    ACTION:

    Announcement of Department determination.

    SUMMARY:

    In this document, the Department of Transportation is announcing that after careful review, and as mandated by Section 7311 of the Fixing America's Surface Transportation (FAST) Act, the Department of Transportation has reviewed the final updated Regulatory Impact Analysis (RIA) and determined that the HM-251 Final Rule's electronically controlled pneumatic (ECP) brake requirements are not economically justified. As the expected benefits do not exceed the expected costs, PHMSA and the Federal Railroad Administration (FRA) will initiate a rulemaking to rescind the necessary regulatory provisions.

    DATES:

    December 13, 2017.

    ADDRESSES:

    All documents and comments related to this matter, including the final updated RIA, are still available for review at http://www.regulations.gov in Docket Number PHMSA-2017-0102.

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    For public affairs related questions, please contact Patricia Klinger, Deputy Director within PHMSA's Office of Governmental, International, and Public Affairs, by email at phmsa.publicaffairs@dot.gov, or by telephone at 202-366-4831. For economic (RIA) related questions, please contact Mark Johnson, Senior Economist, PHMSA, by telephone at 202-366-4495 or by email at mark.johnson@dot.gov. For rulemaking related questions, please contact Matthew Nickels, Senior Regulations Officer, PHMSA, by telephone at 202-366-8553 or by email at matthew.nickels@dot.gov.

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    HM-251 Final Rule

    On May 8, 2015, PHMSA, in coordination with FRA, published a Final Rule adopting requirements intended to reduce the consequences and, in some instances, reduce the probability of accidents involving trains transporting large quantities of flammable liquids. See 80 FR 26643.[1] The Final Rule defined certain trains transporting large volumes of flammable liquids as high-hazard flammable trains (HHFT) [2] and others as high-hazard flammable unit trains (HHFUT).[3] The Final Rule required HHFUTs transporting at least one flammable liquid classified as a packing group I material be operated with an ECP braking system by January 1, 2021, and all other HHFUTs be operated with an ECP braking system by May 1, 2023. See 49 CFR 174.310(a)(3).

    Fixing America's Surface Transportation (FAST) Act

    In December 2015, Congress passed the FAST Act.[4] Public Law 114-94, 129 Stat. 1686 (Dec. 4, 2015). Section 7311 of the FAST Act (Section 7311) established a process, including independent study and testing, for DOT to use in developing an updated RIA related to the Final Rule's ECP brake provision. The Secretary was also required to solicit public comment on the updated RIA, and issue a final updated RIA, responding to comments and incorporating any useful information provided. Finally, Section Start Printed Page 585837311 required the Secretary of Transportation to review the final updated RIA and determine if the final rule's ECP brake requirements are justified, based on whether the final updated RIA demonstrated that the benefits exceed the costs. The FAST Act required this process to be completed no later than December 4, 2017.

    Section 7311 required DOT to enter into an agreement with National Academy of Sciences (NAS) to test ECP brakes and reevaluate the economic analysis supporting the ECP brake requirement of the Final Rule.[5] Section 7311 required the testing to “objectively, accurately, and reliably measure[s] the performance of ECP brake systems relative to other braking technologies or systems, such as distributed power and 2-way end-of-train devices.” The FAST Act also provided for U.S. General Accountability Office (GAO) review of the potential costs and benefits of ECP brakes. In response, GAO completed an evaluation of the business benefits, safety benefits, and costs that DOT estimated in the RIA for the final rule.[6] Additionally, GAO recently completed a second evaluation comparing the forecasted values of certain data points that were used to support DOT's ECP brake analysis.[7] Both audits are discussed in the final updated RIA.

    October 16, 2017—Federal Register Document and Request for Comments

    On October 16, 2017, PHMSA published a Federal Register document that provided the public with an opportunity to comment on the updated RIA. See 82 FR 48006.[8] All documents and comments related to this matter, including the updated RIA, are still available for review at http://www.regulations.gov in Docket Number PHMSA-2017-0102.

    Final Determination

    The final updated RIA shows that the ECP brake requirements are not expected to be cost beneficial under any scenario assessed. These include a range of crude oil volume by rail forecasts—one that shows volumes shipped by rail rebounding over a period of time to close to the levels predicted at the rulemaking stage, one that shows levels flattening at those seen over the past few years, and a third showing declining volumes of crude oil shipped by rail. The estimated costs and benefits for the 20-year analysis are presented in the following (figures are in millions of dollars):

    Table #1

    [Millions of dollars]

    Total7 Percent3 Percent
    LowHighSensitivityLowHighSensitivityLowHighSensitivity
    Tank Cars$274.48$364.48$191.69$237.76$318.49$165.00$256.18$341.52$178.39
    Locomotives115.67153.2585.86105.03140.4277.13110.79147.3981.84
    Asset Management0.520.520.520.520.520.520.520.520.52
    Training36.5836.5836.5832.2932.2932.2934.6234.6234.62
    Total Costs427.25554.83314.65375.60491.72274.95402.11524.05295.37
    Damage Mitigation89.52146.1670.0748.1678.1937.3667.19109.4452.41
    Set Out Reliefs11.0414.186.625.877.463.568.2410.554.97
    Class IA Brake Test67.9087.5840.2927.5446.0421.6845.0765.1230.24
    Wheel Savings46.3971.1533.2226.7737.4017.8736.0852.9024.93
    Fuel Savings42.7054.8825.6322.7028.8513.7931.9040.8119.23
    Total Benefits257.54373.95175.82131.03197.9594.27188.49278.81131.78
    Net Benefits−169.71−180.88−138.83−244.57−293.78−180.68−213.63−245.24−163.59

    As mandated by Section 7311, the Department of Transportation has reviewed the final updated RIA and determined that the HM-251 final rule's ECP brake requirements are not economically justified as the final updated RIA demonstrates that the expected benefits do not exceed the expected costs. As such, PHMSA and FRA will initiate a rulemaking to rescind the necessary regulatory provisions.

    Start Signature

    Issued in Washington, DC on December 5, 2017, under authority delegated in 49 CFR 1.97.

    Drue Pearce,

    Deputy Administrator, Pipeline and Hazardous Materials Safety Administration.

    End Signature End Supplemental Information

    Footnotes

    2.  The Final Rule defined an HHFT as “a single train transporting 20 or more loaded tank cars of a Class 3 flammable liquid in a continuous block or a single train carrying 35 or more loaded tank cars of a Class 3 flammable liquid throughout the train consist.” See 49 CFR 171.8.

    Back to Citation

    3.  The Final Rule defined an HHFUT as “a single train transporting 70 or more loaded tank cars containing Class 3 flammable liquid.”

    Back to Citation

    5.  In a March 17, 2016, letter, NAS declined to perform the testing, citing preliminary cost estimates to perform the testing in excess of $100 million and expressing concern about meeting the statutory deadline. As an alternative, to meet the intent of the FAST Act, DOT conducted the testing itself and contracted with NAS to review and monitor the test plan.

    Back to Citation

    6.  DOT's Rulemaking on Electronically Controlled Pneumatic Brakes Could Benefit from Additional Data and Transparency, GAO-17-122, Oct 12, 2016.

    Back to Citation

    7.  2015 Electronically Controlled Pneumatic Brake Rule: Comparison of DOT Forecasts for Selected Data Points for 2015 and 2016 to Preliminary Data for Those Years, GAO-17-567R, May 31, 2017.

    Back to Citation

    [FR Doc. 2017-26546 Filed 12-12-17; 8:45 am]

    BILLING CODE 4910-60-P

Document Information

Published:
12/13/2017
Department:
Pipeline and Hazardous Materials Safety Administration
Entry Type:
Proposed Rule
Action:
Announcement of Department determination.
Document Number:
2017-26546
Dates:
December 13, 2017.
Pages:
58582-58583 (2 pages)
Docket Numbers:
Docket No. PHMSA-2017-0102, Notice No. 2017-12
PDF File:
2017-26546.pdf
CFR: (1)
49 CFR 174