[Federal Register Volume 64, Number 239 (Tuesday, December 14, 1999)]
[Notices]
[Page 69752]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 99-32261]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP00-42-000]
Northwest Pipeline Corporation; Notice of Request Under Blanket
Authorization
December 8, 1999.
Take notice that on December 3, 1999, Northwest Pipeline
Corporation (Northwest) 295 Chipeta Way, Salt Lake City, Utah 84108,
filed in Docket No. CP00-42-000 a request pursuant to Sections 157.205
and 157.211 of the Commission's Regulations under the Natural Gas Act
(18 CFR 157.205, 157.211) for authorization to construct and operate
the new Basin Frozen Foods Meter Station, in Grant County, Washington,
to provide deliveries to Basin Frozen Foods (Basin), a new end-user,
under Northwest's Gas Act, all as more fully set forth in the request
that is on file with the Commission and open to public inspection. This
filing may be viewed on the web at http://www.ferc.fed.us/online/
rims.htm (call 202-208-2222 for assistance).
Specifically, Northwest proposes to construct and operate the new
Basin Frozen Foods Meter Station adjacent to its existing Warden Meter
Station at Milepost 24.49 on the Moses Lake Lateral in Grant County,
Washington. Northwest states that the new meter station will consist of
a 3-inch lateral tap, a 3-inch turbine meter and appurtenances with a
design capacity of 3,567 Dth per day at 300 psig. Northwest states that
Basin's estimated requirements for natural gas are up to 2,700 Dth per
day. Northwest further states that the estimated cost to construct the
Basin Frozen Foods Meter Station is approximately $215,500, and that
the actual cost associated with construction plus applicable income tax
gross-up will be reimbursed by Basin.
Any questions regarding this application should be directed to Gary
K. Kotter, Manager, Certificates at (801) 584-7117, P.O. Box 58900,
Salt Lake City, Utah 84158.
Any person or the Commission's staff may, within 45 days after
issuance of the instant notice by the Commission, file pursuant to Rule
214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to
intervene or notice of intervention and pursuant to Section 157.205 of
the Regulations under the Natural Gas Act (18 CFR 157.205) a protest of
the request. If no protest is filed within the time allowed therefor,
the proposed activity shall be deemed to be authorized effective the
date after the time allowed for filing a protest. If a protest is filed
and not withdrawn within 30 days after the time allowed for filing a
protest, the instant request shall be treated as an application for
authorization pursuant to Section 7 of the Natural Gas Act.
Linwood A. Watson, Jr.,
Acting Secretary.
[FR Doc. 99-32261 Filed 12-13-99; 8:45 am]
BILLING CODE 6717-01-M