2010-31420. Sunshine Act Meeting  

  • Start Preamble December 9, 2010.

    The following notice of meeting is published pursuant to section 3(a) of the government in the Sunshine Act (Pub. L. 94-409), 5 U.S.C. 552b:

    Agency Holding Meeting:

    Federal Energy Regulatory Commission.

    Date and Time:

    December 16, 2010, 10 a.m.

    Place:

    Room 2C, 888 First Street, NE., Washington, DC 20426.

    Status:

    Open.

    Matters to be Considered:

    Agenda.

    * Note

    —Items listed on the agenda may be deleted without further notice.

    Contact Person for More Information:

    Kimberly D. Bose, Secretary, Telephone (202) 502-8400.

    For a recorded message listing items struck from or added to the meeting, call (202) 502-8627.

    This is a list of matters to be considered by the Commission. It does not include a listing of all documents relevant to the items on the agenda. All Start Printed Page 77863public documents, however, may be viewed on line at the Commission's Web site at http://www.ferc.gov using the eLibrary link, or may be examined in the Commission's Public Reference Room.

    965th—Meeting, Regular Meeting

    [December 16, 2010 10 a.m.]

    Item No.Docket No.Company
    ADMINISTRATIVE
    A-1AD02-1-000Agency Administrative Matters.
    A-2AD02-7-000Customer Matters, Reliability, Security and Market Operations.
    A-3AD11-5-000Annual Report of Natural Gas Transactions.
    ELECTRIC
    E-1ER10-1791-000Midwest Independent Transmission System Operator, Inc.
    E-2EC10-68-000FirstEnergy Corp. and Allegheny Energy, Inc.
    E-3ER11-1830-000California Independent System Operator Corporation.
    E-4ER11-1923-00Entergy Arkansas, Inc.; Entergy Gulf States Louisiana, L.L.C.; Entergy Louisiana, LLC; Entergy Mississippi, Inc.; Entergy New Orleans, Inc. and Entergy Texas, Inc.
    E-5ER10-1401-000California Independent System Operator Corporation.
    ER10-2191-000
    EL10-76-000Green Energy Express LLC and 21st Century Transmission Holdings, LLC.
    E-6EL10-51-000Grasslands Renewable Energy LLC.
    E-7RM09-09-000Version One Regional Reliability Standards for Facilities Design, Connections, and Maintenance; Protection and Control; and Voltage and Reactive.
    E-8RM09-14-000Version One Regional Reliability Standard for Transmission Operations.
    E-9OMITTED
    E-10RM10-5-000Interpretation of Protection System Reliability Standard.
    E-11RM06-16-010Mandatory Reliability Standards for the Bulk Power System.
    RM06-16-011
    E-12RM10-8-000Electric Reliability Organization Interpretations of Interconnection Reliability Operations and Coordination and Transmission Operations Reliability Standards.
    E-13RM06-22-012Mandatory Reliability Standards for Critical Infrastructure Protection.
    E-14EL00-66-015Louisiana Public Service Commission and the Council of the City of New Orleans v. Entergy Corporation.
    E-15ER11-1918-000ISO New England Inc.
    E-16ER10-2477-000ISO New England Inc.
    E-17OMITTED
    E-18EC10-67-000BHE Holdings Inc. and Maine & Maritimes Corporation.
    E-19NJ09-1-001United States Department of Energy—Bonneville Power Administration.
    E-20NP10-160-000North American Electric Reliability Corporation.
    E-21ER11-1947-000ISO New England Inc.
    GAS
    G-1RM10-25-000Five-Year Review of Oil Pipeline Pricing Index.
    G-2RM11-4-000Storage Reporting Requirements of Interstate and Intrastate Natural Gas Companies.
    G-3RM09-2-001Contract Reporting Requirements of Intrastate Natural Gas Companies.
    G-4RP07-340-007Columbia Gas Transmission Corporation.
    G-5RP08-295-002Columbia Gas Transmission Corporation.
    HYDRO
    H-1P-2342-005PacifiCorp.
    P-2342-011
    Start Printed Page 77864
    CERTIFICATES
    C-1CP10-457-000National Fuel Gas Supply Corporation.
    CP10-458-000
    C-2CP10-488-000Columbia Gas Transmission, LLC and Millennium Pipeline Company, LLC.
    C-3CP10-471-000Texas Eastern Transmission, LP.
    Start Signature

    Kimberly D. Bose,

    Secretary.

    End Signature

    A free Webcast of this event is available through http://www.ferc.gov. Anyone with Internet access who desires to view this event can do so by navigating to http://www.ferc.gov's Calendar of Events and locating this event in the Calendar. The event will contain a link to its Webcast. The Capitol Connection provides technical support for the free Webcasts. It also offers access to this event via television in the DC area and via phone bridge for a fee. If you have any questions, visit http://www.CapitolConnection.org or contact Danelle Springer or David Reininger at 703-993-3100.

    Immediately following the conclusion of the Commission Meeting, a press briefing will be held in the Commission Meeting Room. Members of the public may view this briefing in the designated overflow room. This statement is intended to notify the public that the press briefings that follow Commission meetings may now be viewed remotely at Commission headquarters, but will not be telecast through the Capitol Connection service.

    End Preamble

    [FR Doc. 2010-31420 Filed 12-10-10; 11:15 am]

    BILLING CODE 6717-01-P

Document Information

Comments Received:
0 Comments
Published:
12/14/2010
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
2010-31420
Pages:
77862-77864 (3 pages)
EOCitation:
of 2010-12-09
PDF File:
2010-31420.pdf