98-33148. Williston Basin Interstate Pipeline Company; Notice of Request Under Blanket Authorization
[Federal Register Volume 63, Number 240 (Tuesday, December 15, 1998)]
[Notices]
[Page 69069]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 98-33148]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP99-93-000]
Williston Basin Interstate Pipeline Company; Notice of Request
Under Blanket Authorization
December 9, 1998.
Take notice that on November 30, 1998, Williston Basin Interstate
Pipeline Company (Williston Basin), 200 North Third Street, Suite 300,
Bismarck, North Dakota 58501, filed in Docket No. CP99-93-000 a request
pursuant to Sections 157.205 and 157.216 of the Commission's
Regulations (18 CFR 157.205, 157.216) under the Natural Gas Act (NGA)
for authorization to abandon two farm taps in Carbon County, Montana,
under Williston Basin's blanket certificate issued in Docket Nos. CP82-
487-000, et al., pursuant to Section 7 of the NGA, all as more fully
set forth in the request that is on file with the Commission and open
to public inspection.
Williston Basin proposes to abandon by removal the facilities,
located on its Lovell-Billings transmission line in Carbon County,
because they are no loner being used. Williston Basin does not foresee
any use for these taps in the future. It is stated that Williston Basin
was authorized to acquire and operate the taps in 1985 for deliveries
to Montana-Dakota Utilities Co. (Montana-Dakota), a local distribution
company, which in turn served end-use customers. It is asserted that
Montana-Dakota now serves the customers through its distribution system
and consent to the proposed abandonment.
Any person or the Commission's staff may, within 45 days after
issuance of the instant notice by the Commission, file pursuant to Rule
214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to
intervene or notice of intervention and pursuant to Section 157.205 of
the Regulations under the Natural Gas Act (18 CFR 157.205) a protest to
the request. If no protest is filed within the time allowed therefor,
the proposed activity shall be deemed to be authorized effective the
day after the time allowed for filing a protest. If a protest is filed
and not withdrawn within 30 days after the time allowed for filing a
protest, the instant request shall be treated as an application for
authorization pursuant to Section 7 of the Natural Gas Act.
Linwood A. Watson, Jr.,
Acting Secretary.
[FR Doc. 98-33148 Filed 12-14-98; 8:45 am]
BILLING CODE 6717-01-M
Document Information
- Published:
- 12/15/1998
- Department:
- Federal Energy Regulatory Commission
- Entry Type:
- Notice
- Document Number:
- 98-33148
- Pages:
- 69069-69069 (1 pages)
- Docket Numbers:
- Docket No. CP99-93-000
- PDF File:
-
98-33148.pdf