98-33150. NorAm Gas Transmission Company; Notice of Request Under Blanket Authorization  

  • [Federal Register Volume 63, Number 240 (Tuesday, December 15, 1998)]
    [Notices]
    [Page 69068]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 98-33150]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    
    Federal Energy Regulatory Commission
    [Docket No. CP99-95-000]
    
    
    NorAm Gas Transmission Company; Notice of Request Under Blanket 
    Authorization
    
    December 9, 1998.
        Take notice that on December 1, 1998, NorAm Gas Transmission 
    Company (NGT), 1111 Louisiana, Houston, Texas 77002-5231, filed in 
    Docket No. CP99-95-000 a request pursuant to Sections 157.205 and 
    157.211 of the Commission's Regulations under the Natural Gas Act (18 
    CFR 157.205 and 157.211) for authorization to construct and operate 
    facilities in Oklahoma under NGT's blanket certificate issued in Docket 
    No. CP82-384-000 and CP82-384-001 pursuant to Section 7 of the Natural 
    Gas Act, all as more fully set forth in the request that is on file 
    with the Commission and open to public inspection.
        NGT proposes to construct and operate one 2-inch delivery tap and 
    first-cut regulator to serve ARKLA, a division of NorAm Energy Corp. 
    (ARKLA). ARKLA will construct, own and operate at its costs, a 1-inch 
    domestic meter. NGT will own and operate the delivery tap and first-cut 
    regulator. The 2-inch tap will be located on NGT's Line O in Section 
    17, Township 5 North, Range 19 East, Latimer County, Oklahoma. The 
    estimated volumes to be delivered to this tap are approximately 400 Dth 
    annually and 6 Dth on a peak day. The tap and first-cut regulator will 
    be constructed at an estimated cost of $2,667 and ARKLA will reimburse 
    NGT the construction costs.
        NGT states that this proposal is not prohibited by its existing 
    tariff, that there is sufficient capacity to accomplish deliveries 
    without detriment or disadvantage to other customers, that its peak day 
    and annual deliveries will not be effected and that the total volumes 
    delivered will not exceed the total volumes authorized prior to this 
    request.
        Any person or the Commission's staff may, within 45 days after 
    issuance of the instant notice by the Commission, file pursuant to Rule 
    214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to 
    intervene or notice of intervention and pursuant to Section 157.205 of 
    the Regulations under the Natural Gas Act (18 CFR 157.205) a protest to 
    the request. If no protest is filed within the time allowed therefor, 
    the proposed activity shall be deemed to be authorized effective the 
    day after the time allowed for filing a protest. If a protest is filed 
    and not withdrawn within 30 days after the time allowed for filing a 
    protest, the instant request shall be treated as an application for 
    authorization pursuant to Section 7 of the Natural Gas Act.
    Linwood A. Watson, Jr.,
    Acting Secretary.
    [FR Doc. 98-33150 Filed 12-14-98; 8:45 am]
    BILLING CODE 6717-01-M
    
    
    

Document Information

Published:
12/15/1998
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
98-33150
Pages:
69068-69068 (1 pages)
Docket Numbers:
Docket No. CP99-95-000