2011-32127. FFP Project 9 LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications
-
Start Preamble
On September 15, 2011, FFP Project 9 LLC filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of a hydropower project at the Ross Barnett Dam, owned and operated by the Pearl River Valley Water Supply District, located on the Pearl River, in Rankin and Hinds Counties, Mississippi. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land-disturbing activities or otherwise enter upon lands or waters owned by others without the owners' express permission.
The proposed project would consist of: (1) A 23,400-foot-long, 64-foot-high earthen dam; (2) a reservoir with a surface area of 32,000 acres and a storage capacity of 341,000 acre-feet; (3) a 100-foot-long, 40-foot-wide intake structure; (4) three 14-foot-diameter, 400-foot-long steel penstocks; (5) a powerhouse, constructed in a lock chamber, containing three generating units with a total capacity of 21.0 megawatts; (6) a 125-foot-long, 100-foot-wide tailrace; (7) a 4.16/69.0 kilo-Volt (kV) substation; and (8) a 75-foot-long, 69.0 kV transmission line. The proposed project would have an average annual generation of 50.0 gigawatt-hours.
Applicant Contact: Ms. Ramya Swaminathan, Free Flow Power Corp., 239 Causeway Street, Suite 300, Boston, MA 02114, (978) 283-2822.
FERC Contact: Michael Spencer, michael.spencer@ferc.gov, (202) 502-6093.
Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Competing applications and notices of intent must meet the requirements of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web site http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll free at 1-(866) 208-3676, or for TTY, (202) 502-8659. Although the Commission strongly encourages electronic filing, documents may also be paper-filed. To paper-file, mail an original and seven copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426.
More information about this project, including a copy of the application, can be viewed or printed on the “eLibrary” link of Commission's Web site at http://www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number (P-14288-000) in the docket number field to access the document. For assistance, contact FERC Online Support.
Start SignatureDated: December 8, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011-32127 Filed 12-14-11; 8:45 am]
BILLING CODE 6717-01-P
Document Information
- Comments Received:
- 0 Comments
- Published:
- 12/15/2011
- Department:
- Federal Energy Regulatory Commission
- Entry Type:
- Notice
- Document Number:
- 2011-32127
- Pages:
- 77996-77996 (1 pages)
- Docket Numbers:
- Project No. 14288-000
- PDF File:
- 2011-32127.pdf