2021-27125. Caltrain's Request for Approval To Test Crossing Optimization on Its Positive Train Control Network  

  • Start Preamble

    AGENCY:

    Federal Railroad Administration (FRA), U.S. Department of Transportation (DOT).

    ACTION:

    Notice of availability and request for comments.

    SUMMARY:

    This document provides the public with notice that on December 2, 2021, the Peninsula Corridor Joint Powers Board (Caltrain) submitted a document entitled, “Crossing Optimization Project: Test Request,” Revision 1, dated November 29, 2021, to FRA. Caltrain asks FRA to approve its request so that Caltrain may field test its Crossing Optimization on track that has been equipped with positive train control (PTC) technology.

    DATES:

    FRA will consider comments received by February 14, 2022. FRA may consider comments received after that date to the extent practicable and without delaying implementation of valuable or necessary modifications to a PTC system.

    ADDRESSES:

    All comments should identify the agency name and Docket Number FRA-2010-0051, and may be submitted on https:// Start Printed Page 71317 www.regulations.gov. Follow the online instructions for submitting comments. All comments received will be posted without change to https://www.regulations.gov;​; this includes any personal information.

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    Gabe Neal, Staff Director, Signal, Train Control, and Crossings Division, telephone: 816-516-7168, email: Gabe.Neal@dot.gov.

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    On December 17, 2020, FRA certified Caltrain's Interoperable Electronic Train Management System (I-ETMS) PTC system under Title 49 Code of Federal Regulations (CFR) Section 236.1015 and Title 49 United States Code (U.S.C.) 20157(h). Pursuant to 49 CFR 236.1035, a railroad must obtain FRA's approval before field testing an uncertified PTC system, or a product of an uncertified PTC system, or any regression testing of a certified PTC system on the general rail system. See 49 CFR 236.1035(a). Please see Caltrain's test request for the required information, including a complete description of both Caltrain's Crossing Optimization Project and its specific test procedures, including the measures that will be taken to ensure safety during testing.

    Caltrain's test request is available for review online at https://www.regulations.gov (Docket No. FRA-2010-0051). Interested parties are invited to comment on the test request by submitting written comments or data. During its review of the test request, FRA will consider any comments or data submitted. However, FRA may elect not to respond to any particular comment and, under 49 CFR 236.1035, FRA maintains the authority to approve, approve with conditions, or deny the test request at its sole discretion.

    Privacy Act Notice

    In accordance with 49 CFR 211.3, FRA solicits comments from the public to better inform its decisions. DOT posts these comments, without edit, including any personal information the commenter provides, to https://www.regulations.gov,, as described in the system of records notice (DOT/ALL-14 FDMS), which can be reviewed at https://www.transportation.gov/​privacy. See https://www.regulations.gov/​privacy-notice for the privacy notice of regulations.gov . To facilitate comment tracking, we encourage commenters to provide their name, or the name of their organization; however, submission of names is completely optional. If you wish to provide comments containing proprietary or confidential information, please contact FRA for alternate submission instructions.

    Start Signature

    Issued in Washington, DC.

    Carolyn R. Hayward-Williams,

    Director, Office of Railroad Systems and Technology.

    End Signature End Supplemental Information

    [FR Doc. 2021-27125 Filed 12-14-21; 8:45 am]

    BILLING CODE 4910-06-P

Document Information

Published:
12/15/2021
Department:
Federal Railroad Administration
Entry Type:
Notice
Action:
Notice of availability and request for comments.
Document Number:
2021-27125
Dates:
FRA will consider comments received by February 14, 2022. FRA may consider comments received after that date to the extent practicable and without delaying implementation of valuable or necessary modifications to a PTC system.
Pages:
71316-71317 (2 pages)
Docket Numbers:
Docket No. FRA-2010-0051
PDF File:
2021-27125.pdf
Supporting Documents:
» Peninsula Corridor Joint Powers Board – “Caltrain” (PCJX/PCMZ) Q1 2019 PTC Progress Report
» Peninsula Corridor Joint Powers Board - Caltrain (PCMZ) Q4 2018 PTC Progress Report
» Caltrain RFA to PTCIP Approval
» Peninsula Corridor Joint Powers Board (Caltrain) At-Risk PTC Letter (Quarter 1 of 2018)
» Peninsula Corridor Joint Powers Board - Caltrain (PCJX/PCMZ) Q1 2018 PTC Progress Report
» At-Risk PTC Letter-Peninsula Corridor Joint Powers Board
» Peninsula Corridor Joint Powers Board (PCJX/PCMZ) Q3 2017 PTC Progress Report
» Caltrain (PCJX) PTC Implementation Plan (PTCIP) Version 7.0
» 3rd Quarter 2016 PCMZ Quarterly PTC Progress Report Form (FRA F 6180.165)
» PCMZ Quarterly PTC Progress Report Form (FRA F 6180 165)