[Federal Register Volume 59, Number 241 (Friday, December 16, 1994)]
[Unknown Section]
[Page 0]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 94-30921]
[[Page Unknown]]
[Federal Register: December 16, 1994]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. ER94-1195-000]
Sierra Pacific Power Company, et al.; Electric Rate and Corporate
Regulation Filings
December 7, 1994.
Take notice that the following filings have been made with the
Commission:
1. Sierra Pacific Power Company
[Docket No. ER94-1195-000]
Take notice that on November 16, 1994, Sierra Pacific Power Company
(Sierra), amended its filing in this docket by the submission of
information in response to informal communication received by Sierra
from the Commission staff.
Sierra asserts that this amendment filing has been served on Mt.
Wheeler Power, Inc. and on the regulatory commissions of Nevada and
California.
Comment date: December 20, 1994, in accordance with Standard
Paragraph E at the end of this notice.
2. Southwestern Electric Power Company
[Docket No. ER94-1428-000]
Take notice that on November 22, 1994, Southwestern Electric Power
Company (SWEPCO), tendered for filing an amendment to its Coordination
Sales Tariff, filed July 1, 1994. Under the Coordination Sales Tariff,
SWEPCO will make Economy Energy, Short-Term Power and Energy, General
Purpose Energy and Emergency Energy Service available to customers upon
mutual agreement. The amended filing makes limited changes in selected
terms and conditions of the Tariff and associated Service Schedules and
in the level of SWEPCO's purchase and resale adder.
SWEPCO revised the requested effective date from August 31, 1994 to
November 1, 1994. Copies of this filing were served on the Arkansas
Public Service Commission, the Louisiana Public Service Commission and
the Public Utility Commission of Texas. A copy of the filing is also
available for public inspection at SWEPCO's offices in Shreveport,
Louisiana.
Comment date: December 21, 1994, in accordance with Standard
Paragraph E at the end of this notice.
3. Allegheny Generating Company
[Docket No. ER95-144-000]
Take notice that on October 31, 1994, Allegheny Generating Company
tendered for filing an amendment to its October 28, 1994, filing
submitted in the above-referenced docket.
Comment date: December 16, 1994, in accordance with Standard
Paragraph E at the end of this notice.
4. New England Power Company
[Docket No. ER95-173-000]
Take notice that New England Power Company (NEP) on November 9,
1994, tendered for filing a service agreement for system sales service
under NEP's FERC Electric Tariff, Original Volume No. 5 to Ohio Edison.
Comment date: December 21, 1994, in accordance with Standard
Paragraph E at the end of this notice.
5. Virginia Electric and Power Company
[Docket No. ER95-238-000]
Take notice that on November 29, 1994, Virginia Electric and Power
Company (Virginia Power), tendered for filing a Service Agreement
between GPU Service Corporation as agent for and on behalf of
Pennsylvania Electric Company, Metropolitan Edison Company and Jersey
Central Power & Light Company (Eligible Purchaser) and Virginia Power
dated November 1, 1994, under the Power Sales Tariff to Eligible
Purchasers dated May 27, 1994. Under the tendered Service Agreement
Virginia Power agrees to provide services to Eligible Purchaser under
the rates, terms and conditions of the Power Sales Tariff as agreed by
the parties pursuant to the terms of the applicable Service Schedules
included in the Power Sales Tariff.
Copies of the filing were served upon the Virginia State
Corporation Commission and the North Carolina Utilities Commission.
Comment date: December 20, 1994, in accordance with Standard
Paragraph E at the end of this notice.
6. United Illuminating Company
[Docket No. ER95-239-000]
Take notice that on November 29, 1994, The United Illuminating
Company (UI), submitted for informational purposes all individual
Purchase Agreements executed under UI's Wholesale Electric Sales
Tariff, FERC Electric Tariff, Original Volume No. 2 during the six-
month period of May 1, 1994 through October, 1994.
Comment date: December 20, 1994, in accordance with Standard
Paragraph E at the end of this notice.
7. Allegheny Power Service Corporation, on behalf of The Potomac
Edison Company
[Docket No. ER95-240-000]
Take notice that on November 28, 1994, Allegheny Power Service
Corporation on behalf of The Potomac Edison Company filed Supplement
No. 3 to the above-captioned proceeding to give notice to two new
delivery points for the supply of power to Old Dominion Electric
Cooperative under its FERC Electric Tariff First Revised Volume No. 3.
Copies of this filing have been provided to the Maryland Public
Service Commission, the Virginia State Corporation Commission, the West
Virginia Public Service Commission, and Old Dominion Electric
Cooperative.
Comment date: December 20, 1994, in accordance with Standard
Paragraph E at the end of this notice.
8. Montaup Electric Company
[Docket No. ER95-241-000]
Take notice that on November 28, 1994, Montaup Electric Company
(Montaup of the Company), filed an original rate sheet containing
changes to the Conservation and Load Management (C&LM) provisions
approved by the Commission in Docket No. ER94-1062-000 on May 21, 1994.
With this filing, Montaup is requesting that its C&LM adjuster
mechanism be changed to allow a final reconciliation of 1995 C&LM
program expenses beyond the normal December 31 ending date. The reason
for the change is to allow a transition of the C&LM program expense
recovery from FERC to the states. Montaup requests that this filing be
made effective February 1, 1995.
Comment date: December 20, 1994, in accordance with Standard
Paragraph E at the end of this notice.
9. Ohio Power Company
[Docket No. ER95-242-000]
Take notice that on November 29, 1994, Ohio Power Company (OPCo),
tendered for filing with the Commission proposed modifications to its
Rate Schedule FPC No. 18. The modifications are designed to provide
curtailable service to Wheeling Power Company (WPCo).
OPCo proposes an effective date of January 1, 1995, and states that
a copy of its filing was served on WPCo, its other wholesale customers,
the Public Service Commission of West Virginia and the Public Utilities
Commission of Ohio.
Comment date: December 20, 1994, in accordance with Standard
Paragraph E at the end of this notice.
10. Puget Sound Power & Light Co.
[Docket No. ER95-244-000]
Take notice that on November 30, 1994, Puget Sound Power & Light
Company (Puget) tendered for filing, as a change in its Rate Schedule
FERC Nos. 102, 103, 104 and 127, Amendatory Agreements by and between
the United States of America Department of Energy acting and through
the Bonneville Power Administration (Bonneville) and Puget (the
Amendatory Agreements). A copy of the filing was served upon
Bonneville.
Puget states that the Amendatory Agreements relate to Bonneville's
provision of transmission services to Puget and Puget's provision to
Bonneville of an amount of electric energy to compensate for
transmission losses. The Amendatory Agreements are to amend the rate
schedules set forth above and the transmission agreement that Puget
submitted for filing in the above-referenced docket.
Comment date: December 21, 1994, in accordance with Standard
Paragraph E at the end of this notice.
11. Keystone Energy Service Company, L.P.
[Docket No. ER95-246-000]
Take notice that on November 30, 1994, Keystone Energy Service
Company, L.P. (Keystone), tendered for filing Supplement No. 1 to
Keystone's Initial Rate Schedule FERC No. 1. Keystone's Initial Rate
Schedule FERC No. 1 was previously accepted for filing by the
Commission and is comprised of a Purchase of Electric Power Agreement,
as amended, between Keystone and Atlantic City Electric Company (ACE)
for the sale of capacity and associated energy from Keystone's
cogeneration facility located in Logan Township, New Jersey. Supplement
No. 1 adjusts or clarifies certain terms of Rate Schedule FERC No. 1.
Supplement No. 1 does not constitute a rate increase.
Supplement No. 1 is a Settlement Agreement that embodies the
resolution of a dispute that arose between Keystone and ACE as to the
timing and amount of ACE's capacity and interest payments under Rate
Schedule FERC No. 1.
Keystone has served a copy of this filing on ACE.
Comment date: December 20, 1994, in accordance with Standard
Paragraph E at the end of this notice.
12. Foster Wheeler Penn Resources, Inc.
[Docket No. QF95-17-000]
On December 2, 1994, Foster Wheeler Penn Resources, Inc., tendered
for filing an amendment to its filing in this docket. No determination
has been made that the submittal constitutes a complete filing.
The amendment provides additional information pertaining to the
ownership and other technical data of the facility.
Comment date: December 30, 1994, in accordance with Standard
Paragraph E at the end of this notice.
Standard Paragraphs
E. Any person desiring to be heard or to protest said filing should
file a motion to intervene or protest with the Federal Energy
Regulatory Commission, 825 North Capitol Street, N.E., Washington, D.C.
20426, in accordance with Rules 211 and 214 of the Commission's Rules
of Practice and Procedure (18 CFR 385.211 and 18 CFR 385.214). All such
motions or protests should be filed on or before the comment date.
Protests will be considered by the Commission in determining the
appropriate action to be taken, but will not serve to make protestants
parties to the proceeding. Any person wishing to become a party must
file a motion to intervene. Copies of this filing are on file with the
Commission and are available for public inspection.
Lois D. Cashell,
Secretary.
[FR Doc. 94-30921 Filed 12-15-94; 8:45 am]
BILLING CODE 6717-01-P