98-33289. Office of Fossil Energy; Gregory Power Partners, L.P.; Notice of Filing of Coal Capability; Powerplant and Industrial Fuel Use Act  

  • [Federal Register Volume 63, Number 241 (Wednesday, December 16, 1998)]
    [Notices]
    [Pages 69269-69270]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 98-33289]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    
    [Docket No. FE C&E 98-09--Certification Notice--164]
    
    
    Office of Fossil Energy; Gregory Power Partners, L.P.; Notice of 
    Filing of Coal Capability; Powerplant and Industrial Fuel Use Act
    
    AGENCY: Office of Fossil Energy, DOE.
    
    ACTION: Notice of filing.
    
    -----------------------------------------------------------------------
    
    SUMMARY: On November 24, 1998, Gregory Power Partners, L.P. submitted a 
    coal capability self-certification pursuant to section 201 of the 
    Powerplant and Industrial Fuel Use Act of 1978, as amended.
    
    ADDRESSES: Copies of self-certification filings are available for 
    public inspection, upon request, in the Office of Coal & Power IM/Ex, 
    Fossil Energy, Room 4G-039, FE-27, Forrestal Building, 1000 
    Independence Avenue, SW, Washington, DC 20585.
    
    FOR FURTHER INFORMATION CONTACT:
    Ellen Russell at (202) 586-9624.
    
    SUPPLEMENTARY INFORMATION: Title II of the Powerplant and Industrial 
    Fuel Use Act of 1978 (FUA), as amended (42 U.S.C. 8301 et seq.), 
    provides that no new baseload electric powerplant may be constructed or 
    operated without the capability to use coal or another alternate fuel 
    as a primary energy source. In order to meet the requirement of coal 
    capability, the owner or operator of such facilities proposing to use 
    natural gas or petroleum as its primary energy source shall certify, 
    pursuant to FUA section 201(d), to the Secretary of Energy prior to 
    construction, or prior to operation as a base load powerplant, that 
    such powerplant has the capability
    
    [[Page 69270]]
    
    to use coal or another alternate fuel. Such certification establishes 
    compliance with section 201(a) as of the date filed with the Department 
    of Energy. The Secretary is required to publish a notice in the Federal 
    Register that a certification has been filed. The following owner/
    operator of the proposed new baseload powerplant has filed a self-
    certification in accordance with section 201(d).
    
    Owner: Gregory Power Partners, L.P.
    Operator: LG&E Power Services
    Location: Gregory, TX
    Plant configuration: Combined-cycle with steam extraction to process
    Capacity: 401.1 megawatts
    Fuel: Natural gas
    Purchasing entities: Merchant power production facility may have power 
    sales contracts with a variety of purchasers. Initially output will be 
    sold to Reynolds Metals (25MW) and a power marketer (350).
    In-service date: June 1, 2000
    
        Issued in Washington, DC, December 10, 1998.
    Anthony J. Como,
    Manager, Electric Power Regulation, Office of Coal & Power Im/Ex, 
    Office of Coal & Power Systems, Office of Fossil Energy.
    [FR Doc. 98-33289 Filed 12-15-98; 8:45 am]
    BILLING CODE 6450-01-M
    
    
    

Document Information

Effective Date:
6/1/2000
Published:
12/16/1998
Department:
Energy Department
Entry Type:
Notice
Action:
Notice of filing.
Document Number:
98-33289
Dates:
June 1, 2000
Pages:
69269-69270 (2 pages)
Docket Numbers:
Docket No. FE C&E 98-09--Certification Notice--164
PDF File:
98-33289.pdf