02-31453. Availability for the Revised Draft Environmental Impact Statement/Environmental Impact Report for the Pier J South Maine Terminal Expansion Project, Los Angeles County, CA  

  • Start Preamble

    AGENCY:

    Department of the Army, U.S. Army Corps of Engineers, DoD.

    ACTION:

    Notice of availability.

    SUMMARY:

    The U.S. Army Corps of Engineers, Los Angeles District, Regulatory Branch, in coordination with the Port of Long Beach, has completed a Revised Draft Environmental Impact Statement/Environmental Impact Report (EIS/EIR) for the Pier J South Marine Terminal Expansion project. The Port of Long Beach requires authorization pursuant to section 404 of the Clean Water Act and section 10 of the Rivers and Harbors Act for 115 acres of landfill in three phases, dredging up to 10,000,000 cubic yards of sediment, construction of a new concrete pile-supported wharf, new terminal buildings and a new rail yard.

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    Questions or comments concerning the Revised Draft EIS/EIR should be directed to Dr. Aaron O. Allen, Senior Project Manager, Regulatory Branch, U.S. Army Crops of Engineers, P.O. Box 532711, Los Angeles, CA, 90053-2325, phone: (805) 585-2148.

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    None.

    Start Signature

    Luz D. Ortiz,

    Army Federal Register Liaison.

    End Signature End Supplemental Information

    [FR Doc. 02-31453 Filed 12-13-02; 8:45 am]

    BILLING CODE 3710-KF-M

Document Information

Published:
12/16/2002
Department:
Engineers Corps
Entry Type:
Notice
Action:
Notice of availability.
Document Number:
02-31453
Pages:
77056-77056 (1 pages)
PDF File:
02-31453.pdf