96-31900. Southern Natural Gas Company; Notice of Request Under Blanket Authorization  

  • [Federal Register Volume 61, Number 243 (Tuesday, December 17, 1996)]
    [Notices]
    [Page 66272]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 96-31900]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    [Docket No. CP97-123-000]
    
    
    Southern Natural Gas Company; Notice of Request Under Blanket 
    Authorization
    
    December 11, 1996.
        Take notice that on November 25, 1996, Southern Natural Gas Company 
    (Southern), P.O. Box 2563, Birmingham, Alabama 35202-2563, filed in the 
    above docket, a request pursuant to Sections 157.205 and 157.212 of the 
    Commission's Regulations under the Natural Gas Act for authorization to 
    relocate certain delivery point facilities including metering and 
    appurtenant facilities where it serves Mississippi Valley Gas Company 
    (MVG). Such relocation is proposed to be performed by Southern under 
    Southern's blanket certificate issued in Docket No. CP82-406-000, all 
    as more fully set forth in the request which is on file with the 
    Commission and open to public inspection.
        Specifically, Southern proposes to relocate the existing meter at 
    its existing Clayton Village Delivery Point which is currently located 
    at the end of MVG's 2'' Clayton Village Line. It stated that Southern 
    proposes to relocate the facilities to a site at or near Mile Post 
    7.500 on Southern's 6-inch Starkville Lateral Line in Oktibbeha County, 
    Mississippi. The estimated cost of the relocation of the delivery point 
    facilities is approximately $3,500. The new location will be more 
    accessible to Southern's general operations in this area of its system.
        Southern states that it will continue to transport gas to Clayton 
    Village Delivery Point pursuant to its Rate Schedule FT and its Rate 
    Schedule IT. MVG does not propose to add or change any transportation 
    demand to its firm service as a result of the relocation of the 
    delivery point. Southern states that the installation of the proposed 
    facilities will have no adverse impact on its peak day deliveries or 
    firm requirements.
        Any person or the Commission's staff may, within 45 days after 
    issuance of the instant notice by the Commission, file pursuant to Rule 
    214 of the Commission's Rules of Practice and Procedure (18 CFR 
    385.214) a motion to intervene or notice of intervention and pursuant 
    to Section 157.205 of the Regulations under the Natural Gas Act (18 CFR 
    157.205) a protest to the request. If no protest is filed within the 
    time allowed therefor, the proposed activity is deemed to be authorized 
    effective on the day after the time allowed for filing a protest.
        If a protest is filed and not withdrawn within 30 days after the 
    time allowed for filing a protest, the instant request shall be treated 
    as an application for authorization pursuant to Section 7 of the 
    Natural Gas Act.
    Linwood A. Watson, Jr.,
    Acting Secretary.
    [FR Doc. 96-31900 Filed 12-16-96; 8:45 am]
    BILLING CODE 6717-01-M
    
    
    

Document Information

Published:
12/17/1996
Department:
Energy Department
Entry Type:
Notice
Document Number:
96-31900
Pages:
66272-66272 (1 pages)
Docket Numbers:
Docket No. CP97-123-000
PDF File:
96-31900.pdf