E3-00572. Notice of Application Accepted for Filing With the Commission and Soliciting Motions To Intervene and Protests  

  • Start Preamble Start Printed Page 70240 December 9, 2003.

    Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection.

    a. Type of Application: Original Minor License Application.

    b. Project No.: 12063-001.

    c. Date filed: October 17, 2003.

    d. Applicant: William Arkoosh.

    e. Name of Project: Little Wood River Ranch II Hydroelectric Project.

    f. Location: On the Little Wood River, near the Town of Shoshone, Lincoln County, Idaho. No lands of the United States would be affected.

    g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).

    h. Applicant Contact: William Arkoosh, 2005 Highway 26, Gooding, Idaho 83330, (208) 934-5387.

    i. FERC Contact: Gaylord W. Hoisington, (202) 502-6032, or e-mail at: gaylord.hoisington@ferc.gov.

    j. Cooperating agencies: We are asking Federal, State, local, and tribal agencies with jurisdiction and/or special expertise with respect to environmental issues to cooperate with us in the preparation of the environmental document. Agencies who would like to request cooperating status should follow the instructions for filing comments described in item k below.

    k. Deadline for filing motions to intervene and protest and requests for cooperating agency status: 60 days from the issuance date of this notice (February 9, 2004).

    All documents (original and eight copies) should be filed with: Magalie R. Salas, Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426.

    The Commission's Rules of Practice require all intervenors filing documents with the Commission to serve a copy of that document on each person on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency.

    Motions to intervene and protest and requests for cooperating agency status may be filed electronically via the Internet in lieu of paper. The Commission strongly encourages electronic filings. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web site (http://www.ferc.gov) under the “e-Filing” link.

    l. This application is not ready for environmental analysis at this time.

    m. The proposed new construction run-of-river project would consist of: (1) A 10-foot-high, 220-foot-long rock rubble diversion dam; (2) a 2,800-foot-long open feeder canal; (3) a concrete intake structure having two parallel 5-foot-diameter, 250-foot-long steel penstocks; (4) a 60-foot-long, 20-foot-wide, 25-foot-high concrete and steel power house containing two hydraulic Francis turbines with a total installed capacity of 1,500 kilowatts; (5) a 3,500-foot-long tailrace channel; (6) a 10,500-foot-long, 12.5-kilovolt transmission line; (7) an access road and (8) appurtenant facilities.

    n. A copy of the application is available for review at the Commission in the Public Reference Room or may be viewed on the Commission's Web site at http://www.ferc.gov using the “eLibrary” link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll-free at 1-866-208-3676, or for TTY, (202) 502-8659. A copy is also available for inspection and reproduction at the address in item h above.

    You may also register online at http://www.ferc.gov/​docs-filing/​esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support.

    o. Any qualified applicant desiring to file a competing application must submit to the Commission, on or before the specified deadline date for the particular application, a competing development application, or a notice of intent to file such an application. Submission of a timely notice of intent allows an interested person to file the competing development application no later than 120 days after the specified deadline date for the particular application. Applications for preliminary permits will not be accepted in response to this notice.

    A notice of intent must specify the exact name, business address, and telephone number of the prospective applicant, and must include an unequivocal statement of intent to submit, if such an application may be filed, either a preliminary permit application or a development application (specify which type of application). A notice of intent must be served on the applicant(s) named in this public notice.

    Anyone may submit a protest or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, 385.211, and 385.214. In determining the appropriate action to take, the Commission will consider all protests filed, but only those who file a motion to intervene in accordance with the Commission's Rules may become a party to the proceeding. Any protests or motions to intervene must be received on or before the specified deadline date for the particular application.

    When the application is ready for environmental analysis, the Commission will issue a public notice requesting comments, recommendations, terms and conditions, or prescriptions.

    All filings must (1) bear in all capital letters the title “PROTEST” or “MOTION TO INTERVENE,” “NOTICE OF INTENT TO FILE COMPETING APPLICATION,” or “COMPETING APPLICATION;” (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. Agencies may obtain copies of the application directly from the applicant. A copy of any protest or motion to intervene must be served upon each representative of the applicant specified in the particular application.

    Start Signature

    Magalie R. Salas,

    Secretary.

    End Signature End Preamble

    [FR Doc. E3-00572 Filed 12-16-03; 8:45 am]

    BILLING CODE 6717-01-P

Document Information

Published:
12/17/2003
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
E3-00572
Pages:
70240-70240 (1 pages)
EOCitation:
of 2003-12-09
PDF File:
e3-00572.pdf