98-33614. Environmental Impact Statements and Regulations; Availability of EPA Comments  

  • [Federal Register Volume 63, Number 243 (Friday, December 18, 1998)]
    [Notices]
    [Pages 70123-70124]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 98-33614]
    
    
    =======================================================================
    -----------------------------------------------------------------------
    
    ENVIRONMENTAL PROTECTION AGENCY
    
    [ER-FRL-5498-1]
    
    
    Environmental Impact Statements and Regulations; Availability of 
    EPA Comments
    
        Availability of EPA comments prepared November 30, 1998 Through 
    December 04, 1998 pursuant to the Environmental Review Process (ERP), 
    under section 309 of the Clean Air Act and section 102(2)(c) of the 
    National Environmental Policy Act as amended. Requests for copies of 
    EPA comments can be directed to the Office of Federal Activities at 
    (202) 564-7167. An explanation of the ratings assigned to draft 
    environmental impact statements
    
    [[Page 70124]]
    
    (EISs) was published in FR dated April 10, 1998 (62 FR 17856).
    
    DRAFT EISs
    
        ERP No. D-AFS-J65286-MT Rating EO2, Hemlock Point Access Project, 
    Construction of 860 feet of Low Standard Road, Plum Creek, Swan Valley, 
    Flathead National Forest, Missoula County, MT.
        Summary: EPA expressed environmental objections about predicted 
    adverse effects to water quality and fisheries, and about adverse 
    effects to the threatened grizzly bear.
        ERP No. D-NPS-D61048-PA Rating EC2, Gettysburg National Military 
    Park, General Management Plan, Implementation, Develop a Partnership 
    with the Gettysburg National Battlefield Museum Foundation, Gettysburg, 
    PA.
        Summary: EPA expressed environmental concerns with the potential on 
    aquatic resources, including non-tidal wetlands adverse impacts. The 
    final EIS should examine avoiding and mitigating for the permanent and 
    temporary effects to the aquatic resource.
    
    Final EISs
    
        ERP No. F-AFS-J65274-MT Beaver Creek Ecosystem Management Project 
    and Associate Timber Sale, Implementation, Little and Big Beaver Creek 
    Drainage, Kootenai National Forest, Cabinet Ranger District, Sanders 
    County, MT.
        Summary: EPA expressed environmental concerns about the potential 
    adverse effects of increased peak flow and erosion and sediment 
    transport and that the aquatic monitoring program should be improved to 
    allow adequate measurement and detection of aquatic impacts.
        ERP No. F-AFS-K61132-CA Eight Eastside Rivers, Wild and Scenic 
    River Study, Suitability or Nonsuitability, Tahoe National Forest and 
    Lake Tahoe Management Unit, Land and Resource Management Plans, Alpine, 
    El Dorado, Placer, Nevada and Sierra Counties, CA.
        Summary: Review of the final EIS was not deemed necessary. No 
    formal comment letter was sent to the preparing agency.
        ERP No. F-AFS-L65301-AK Crane and Rowan Mountain Timber Sales, 
    Implementation, Tongass National Forest, Stikine Area, Kuiu Island, AK.
        Summary: Review of the final EIS was not deemed necessary. No 
    formal comment letter was sent to the preparing agency.
        ERP No. F-COE-K35036-CA Montezuma Wetlands Project, Use of Cover 
    and Non-cover Dredged Materials to restore Wetland, Implementation, 
    Conditional-Use-Permit, NPDES and COE Section 10 and 404 Permit, Suisum 
    Marsh in Collinsville, Solano County, CA.
        Summary: EPA found the final EIS to be generally responsive to 
    EPA's prior concerns on the draft EIS and will continue to work with 
    the Corps to develop specific conditions for the Section 404 permit and 
    to ensure that potential adverse environmental impacts are avoided, 
    minimized and mitigated as fully as possible. EPA noted that if the 
    project is properly constructed, operated and monitored, it could be a 
    significant environmental benefit to the San Francisco Bay region and 
    substantially advance the overall goals of the Federal-State strategy 
    to manage the placement of dredged material in the region.
        ERP No. F-NPS-E61073-MS Natchez Trace Parkway, Construction of 
    Section 3X Southern Terminus, Adam Counties, MS.
        Summary: EPA concerns were addressed in the final EIS about the 
    wetland mitigation and stormwater runoff from road construction for the 
    termination point in Natchez of the Natchez Trace Parkway.
        ERP No. FS-AFS-J65213-MT Helena National Forest and Elkhorn 
    Mountain portion of the Deerlodge National Forest Land and Resource 
    Management Plan, Updated Information on Oil and Gas Leasing, 
    Implementation several counties, MT.
        Summary: EPA found no objections with the preferred alternative.
        ERP No. FS-NPS-K65187-CA Santa Rosa Island Resources Management 
    Plan Improvements of Water Quality and Conservation of Rare Species and 
    their Habitats, Channel Islands National Park, Santa Barbara County, 
    CA.
        Summary: Review of the final EIS was not deemed necessary. No 
    formal comment letter was sent to the preparing agency.
    
        Dated: December 15, 1998.
    William D. Dickerson,
    Director, NEPA Compliance Division, Office of Federal Activities.
    [FR Doc. 98-33614 Filed 12-17-98; 8:45 am]
    BILLING CODE 6560-50-U
    
    
    

Document Information

Published:
12/18/1998
Department:
Environmental Protection Agency
Entry Type:
Notice
Document Number:
98-33614
Pages:
70123-70124 (2 pages)
Docket Numbers:
ER-FRL-5498-1
PDF File:
98-33614.pdf