2012-30544. Sunshine Act Meeting Notice  

  • Start Preamble

    The following notice of meeting is published pursuant to section 3(a) of the government in the Sunshine Act (Pub. L. No. 94-409), 5 U.S.C. 552b:

    AGENCY HOLDING MEETING:

    Federal Energy Regulatory Commission.

    DATE AND TIME:

    December 20, 2012 10:00 a.m.

    PLACE:

    Room 2C, 888 First Street NE., Washington, DC 20426.

    STATUS:

    Open.

    MATTERS TO BE CONSIDERED:

    Agenda

    * Note—Items listed on the agenda may be deleted without further notice.

    CONTACT PERSON FOR MORE INFORMATION:

    Kimberly D. Bose, Secretary, Telephone (202) 502-8400.

    For a recorded message listing items, struck from or added to the meeting, call (202) 502-8627.

    This is a list of matters to be considered by the Commission. It does not include a listing of all documents relevant to the items on the agenda. All public documents, however, may be viewed on line at the Commission's Web site at http://www.ferc.gov using the eLibrary link, or may be examined in the Commission's Public Reference Room.

    988th—Meeting

    Regular Meeting December 20, 2012, 10:00 a.m.

    Item No.Docket No.Company
    Administrative
    A-1AD02-1-000Agency Business Matters.
    A-2AD02-7-000Customer Matters, Reliability, Security and Market Operations.
    Electric
    E-1RM10-11-001Integration of Variable Energy Resources.
    E-2EL11-44-001Iberdrola Renewables, Inc., PacificCorp, NextEra Energy Resources, LLC, Invenergy Wind North America LLC, and Horizon Wind Energy LLC v. Bonneville Power Administration.
    E-3EL11-44-002Iberdrola Renewables, Inc., PacifiCorp, NextEra Energy Resources, LLC, Invenergy Wind North America LLC, and Horizon Wind Energy LLC v. Bonneville Power Administration.
    E-4RM11-12-000Availability of E-Tag Information to Commission Staff.
    E-5RM12-6-000 RM12-7-000Revisions to Electric Reliability Organization Definition of Bulk Electric System and Rules of Procedure.
    E-6OMITTED
    E-7RR12-8-000North American Electric Reliability Corporation.
    E-8NP11-238-001North American Electric Reliability Corporation.
    E-9RM12-9-000Regional Reliability Standard PRC-006-SERC-01-Automatic Underfrequency Load Shedding Requirements.
    E-10OMITTED
    E-11ER13-178-000Southwest Power Pool, Inc.
    Start Printed Page 74843
    E-12ER13-207-000City of Colton, California.
    E-13ER13-168-000California Independent System Operator Corporation.
    E-14ER13-218-000California Independent System Operator Corporation.
    E-15ER13-219-000California Independent System Operator Corporation.
    E-16ER13-49-000Valley Electric Association, Inc.
    E-17EC12-119-000FirstEnergy Generation Corp. and American Transmission System, Incorporated.
    E-18OMITTED
    E-19OMITTED
    E-20OMITTED
    E-21OMITTED
    E-22EL12-109-000Avalon Wind, LLC, Avalon Wind 2, LLC, Catalina Solar, LLC, Catalina Solar 2, LLC, Pacific Wind Lessee, LLC, Pacific Wind 2, LLC, Valentine Solar, LLC, and EDF Renewables Development, Inc.
    E-23OMITTED
    Gas
    G-1RP11-2061-002, RP11-2061-003Northern Natural Gas Company.
    G-2RP12-814-000Gulf Crossing Pipeline Company LLC.
    G-3RP12-820-000Texas Gas Transmission, LLC.
    G-4RP12-813-000Gulf South Pipeline Company, LP.
    G-5OR12-27-000Enbridge Pipelines (Southern Lights) LLC.
    Hydro
    H-1P-13213-004 P-13214-004Lock 14 Hydro Partners, LLC. Lock 12 Hydro Partners, LLC.
    H-2P-14354-001Utah Independent Power, Inc.
    H-3HB81-09-2-002Hudson River-Black River Regulating District, Erie Boulevard Hydropower L.P., Curtis/Palmer Hydroelectric Co., South Glens Falls Limited Partnership, et al., Northern Electric Power Co., et al., Fort Miller Associates, Stillwater Hydro Associates, New York State Electric & Gas Corp., Albany Engineering Corporation, and Green Island Power Co.
    Certificates
    C-1RM12-11-000Revisions to the Auxiliary Installations, Replacement Facilities, and Siting and Maintenance Regulations.
    C-2CP12-25-000Brian Hamilton v. El Paso Natural Gas Company.
    C-3CP12-72-000Dominion Transmission, Inc.
    Start Signature

    Dated: December 13, 2012.

    Kimberly D. Bose,

    Secretary.

    End Signature

    A free webcast of this event is available through www.ferc.gov. Anyone with Internet access who desires to view this event can do so by navigating to www.ferc.gov's Calendar of Events and locating this event in the Calendar. The event will contain a link to its webcast. The Capitol Connection provides technical support for the free webcasts. It also offers access to this event via television in the DC area and via phone bridge for a fee. If you have any questions, visit www.CapitolConnection.org or contact Danelle Springer or David Reininger at 703-993-3100.

    Immediately following the conclusion of the Commission Meeting, a press briefing will be held in the Commission Meeting Room. Members of the public may view this briefing in the designated overflow room. This statement is intended to notify the public that the press briefings that follow Commission meetings may now be viewed remotely at Commission headquarters, but will not be telecast through the Capitol Connection service.

    End Preamble

    [FR Doc. 2012-30544 Filed 12-14-12; 4:15 pm]

    BILLING CODE 6717-01-P

Document Information

Comments Received:
0 Comments
Published:
12/18/2012
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
2012-30544
Pages:
74842-74843 (2 pages)
PDF File:
2012-30544.pdf