94-31045. Section 4(e) Conditions for the Kerr Hydroelectric Project, Montana  

  • [Federal Register Volume 59, Number 242 (Monday, December 19, 1994)]
    [Unknown Section]
    [Page 0]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 94-31045]
    
    
    [[Page Unknown]]
    
    [Federal Register: December 19, 1994]
    
    
    =======================================================================
    -----------------------------------------------------------------------
    
    DEPARTMENT OF THE INTERIOR
    
    Office of the Secretary
    
     
    
    Section 4(e) Conditions for the Kerr Hydroelectric Project, 
    Montana
    
    AGENCY: Department of the Interior.
    
    ACTION: Extension of Public Comment Period.
    
    -----------------------------------------------------------------------
    
    SUMMARY: On November 22, 1994 (59 FR 60158), the Department of the 
    Interior published a notice of availability and a request for comment 
    regarding its proposed Section 4(e) conditions for the Kerr 
    Hydroelectric Project license. In an effort to allow more time for 
    public participation the Department is extending the comment period for 
    an additional 45 days. Pursuant to the Federal Power Act, 16 U.S.C. 
    797(e), the proposed conditions provide for the adequate protection and 
    utilization of the Flathead Indian Reservation and the Fish and 
    Wildlife Service administered Flathead Waterfowl Production Area.
    
    DATES: The Department will consider all comments on the proposed 
    section 4(e) conditions received on or before February 6, 1995 in the 
    formulation of the Secretary's final section 4(e) conditions for the 
    Kerr Hydroelectric Project.
    
    ADDRESSES: Comments should be sent to Anne Crichton, Department of the 
    Interior, Office of the Solicitor, 1849 C Street, NW., Mail Stop 6456, 
    Washington, DC 20240.
    
    FOR FURTHER INFORMATION CONTACT:
    Janice Schneider, Department of the Interior, Office of the Solicitor, 
    1849 C Street, NE., Mail Stop 6456, Washington, DC 20240, 202-208-6967.
    
    SUPPLEMENTARY INFORMATION: The November 22, 1994 (59 FR 60158) notice 
    of availability and request for comment provided a 30 day period during 
    which the Department would receive comments regarding its proposed 
    Section 4(e) conditions for the Kerr Hydroelectric Project. Pursuant to 
    the Federal Power Act, 16 U.S.C. 797(e), the proposed conditions 
    provide for the adequate protection and utilization of the Flathead 
    Indian Reservation and the Fish and Wildlife Service administered 
    Flathead Waterfowl Production Area. The proposed conditions for the 
    Flathead Indian Reservation provide for the imposition of a base load 
    operational scenario at the Kerr Project. This operational scenario 
    precludes the use of Kerr Dam as a load regulating or peak power 
    generation facility, and requires minimum flows, certain restrictions 
    on flow fluctuations (ramping rates), and a two year ramping rate 
    study. In addition, the proposed conditions provide for non-operational 
    measures designed to protect and provide for adequate utilization of 
    the Flathead Indian Reservation in conjunction with operational 
    measures. The non-operational measures include the development of a 
    Fish and Wildlife Implementation Strategy, development of an 
    operational rule curve, habitat acquisition, habitat development, 
    fishery supplementation and reintroduction, development of recreational 
    resources, and the identification and protection of cultural resources 
    on the Flathead Indian Reservation. The proposed conditions for the 
    Flathead WPA provide for the imposition of erosion control on the north 
    shore of Flathead Lake and the upper Flathead River, island 
    restoration, and habitat acquisition and development. The costs of all 
    measures will be borne by the project licensees.
        The deadline for comment on the proposed Section 4(e) conditions is 
    extended for 45 days by this notice. The comment period, which began on 
    November 22, 1994, therefore, consists of a total of 75 days. All 
    comments are due to the Department on or before February 6, 1995. In 
    addition, the Department will be making available two technical reports 
    that further support the proposed Section 4(e) conditions, the ``Kerr 
    Hydro-electric Project Report'' by Stetson Engineers, Inc., and ``An 
    Evaluation of the Wildlife Components of the Kerr Dam Project 
    Mitigation and Management Plan and Recommended Section 4(e) Articles'' 
    by BioSystems Analysis, Inc. The proposed conditions and the above 
    referenced reports are available for review and copying at the 
    Department of the Interior, 1849 C Street, NW., Washington, DC in room 
    6443. Copies of the proposed Section 4(e) conditions and the above 
    referenced reports will be made available to all interested parties 
    upon request.
    
        Dated: December 12, 1994.
    Willie R. Taylor,
    Acting Director, Office of Environmental Policy and Compliance.
    [FR Doc. 94-31045 Filed 12-16-94; 8:45 am]
    BILLING CODE 4310-02-M
    
    
    

Document Information

Published:
12/19/1994
Department:
Interior Department
Entry Type:
Uncategorized Document
Action:
Extension of Public Comment Period.
Document Number:
94-31045
Dates:
The Department will consider all comments on the proposed section 4(e) conditions received on or before February 6, 1995 in the formulation of the Secretary's final section 4(e) conditions for the Kerr Hydroelectric Project.
Pages:
0-0 (1 pages)
Docket Numbers:
Federal Register: December 19, 1994