[Federal Register Volume 62, Number 244 (Friday, December 19, 1997)]
[Notices]
[Pages 66713-66714]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 97-33138]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF TRANSPORTATION
Federal Highway Administration
Environmental Impact Statement: Orange County, New York
AGENCY: Federal Highway Administration (FHWA), New York State
Department of Transportation (NYSDOT), New York State Thruway Authority
(NYSTA).
ACTION: Notice of Intent.
-----------------------------------------------------------------------
SUMMARY: The FHWA is issuing this notice to advise the public that an
environmental impact statement will be prepared for a proposed bridge/
highway project in Orange County, New York.
FOR FURTHER INFORMATION CONTACT: Harold J. Brown, Division
Administrator, Federal Highway Administration, New York Division, Leo
W. O'Brien Federal Building, 9th Floor, Clinton Avenue and North Pearl
Street, Albany, New York 12207, Telephone (518) 431-4127.
or
Philip J. Clark, Director, Design Division, New York State
Department of
[[Page 66714]]
Transportation, State Campus, 1220 Washington Avenue, Albany, New York
12232, Telephone: (518) 457-6452.
or
Duane L. Dodds, Director, Office of Facilities Design, New York
State Thruway Authority, 200 Southern Boulevard, Albany, New York
12209, Telephone: (518) 436-2916.
SUPPLEMENTARY INFORMATION: The New York State Thruway Authority (NYSTA)
and the New York State Department of Transportation (NYSDOT), in
cooperation with the Federal Highway Administration (FHWA), will be
preparing an Environmental Impact Statement (EIS) for a proposed
intermodal project in the Towns of New Windsor, Montgomery and
Newburgh, Orange County, New York. The project will involve the
construction of an interchange on Interstate 84 with Drury Lane, the
construction of an east/west connector road between Drury Lane and the
Stewart Airport and the widening and reconstruction of Drury Lane
between Route 207 and Route 17K. Improvements are necessary to develop
a more direct access between Stewart Airport and the regional highway
system and to stimulate the local and regional economy through the
development of the Stewart Airport Properties in the vicinity of Drury
Lane and the development of the airport in accordance with the Stewart
Airport Master Plan.
Alternatives under consideration include (1) taking no action; (2)
construction of an interchange on Interstate 84 with Drury Lane,
construction of a four lane connector road between Drury Lane and the
Stewart Airport and the widening and reconstruction of Drury Lane
between its intersections with Route 207 and Route 17K, including the
widening of Drury Lane to four lanes between the Stewart Airport
connector road and I84. Incorporated into and studied with the build
alternative will be variations of grade and alignment.
Letters describing the proposed action and soliciting comments will
be sent to appropriate Federal, State, and local agencies, and to
private organizations and citizens who have previously expressed
interest in this proposal. A formal NEPA scoping meeting will be held
for federal, state and local officials on January 14, 1998 at 2:00 P.M.
at the New Windsor Town Hall and for the public on January 14, 1998 at
7:00 P.M. at the Little Britain Elementary School Auditorium in the
Town of New Windsor. In addition, a public hearing will be held. Public
notice will be given of the time and place of the hearing. The draft
EIS, when prepared, will be available for public and agency review and
comment.
To ensure that the full range of issues related to this proposed
action are addressed and all significant issues identified, comments
and suggestions are invited from all interested parties. Comments or
questions concerning this proposed action and the EIS should be
directed to the FHWA, NYSDOT, or NYSTA at the addresses provided above.
(Catalog of Federal Domestic Assistance Program Number 20.205,
Highway Research, Planning and Construction. The regulations
implementing Executive Order 12372 regarding intergovernmental
consultation on Federal programs and activities apply to this
program.)
Issued on: December 10, 1997.
Harold J. Brown,
Division Administrator, Federal Highway Administration, Albany, New
York.
[FR Doc. 97-33138 Filed 12-18-97; 8:45 am]
BILLING CODE 4910-22-M