97-33161. Koch Gateway Pipeline Company; Notice of Request Under Blanket Authorization
[Federal Register Volume 62, Number 244 (Friday, December 19, 1997)]
[Notices]
[Pages 66620-66621]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 97-33161]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP98-126-000]
Koch Gateway Pipeline Company; Notice of Request Under Blanket
Authorization
December 15, 1997.
Take notice that on December 11, 1997, Koch Gateway Pipeline
Company (Koch Gateway), P.O. Box 1478, Houston, Texas 77251-1478, filed
in Docket No. CP98-126-000, a request pursuant to Secs. 157.205 and
157.216(b) for approval to abandon an inactive 2-inch delivery tap and
meter station and 2-inch delivery lateral, under the blanket
certificate issued in Docket No. CP82-430-000, pursuant to Section 7(c)
of the Natural Gas Act, all as more fully set forth in the request
which is on file with the Commission and open to public inspection.
Koch Gateway proposes to abandon by removal an inactive 2-inch tap
and meter station and to abandon in place approximately 150 feet of 2-
inch delivery lateral that formerly served the Shelbyville city gate on
behalf of Entex Inc. (Entex), a local distribution company, in Shelby
County, Texas. Koch Gateway states that Entex would continue to serve
its customers from its existing distribution system. It is further
stated that service to the end-users would not be affected. Koch
Gateway verifies that Entex agrees to the
[[Page 66621]]
proposed abandonment. Koch Gateway states that Entex has not used this
point since 1988. Koch Gateway further states that it would plug and
remove the tap, remove all above ground facilities and after cleaning
the pipe and filling it with either water or nitrogen, would abandon
the lateral in place.
Any person or the Commission's staff may, within 45 days after
issuance of the instant notice by the Commission, file pursuant to Rule
214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to
intervene or notice of intervention and pursuant to Section 157.205 of
the Regulations under the Natural Gas Act (18 CFR 157.205) a protest to
the request. If no protest is filed within the time allowed therefor,
the proposed activity shall be deemed to be authorized effective the
day after the time allowed for filing a protest. If a protest is filed
and not withdrawn within 30 days after the time allowed for filing a
protest, the instant request shall be treated as an application for
authorization pursuant to Section 7 of the Natural Gas Act.
Lois D. Cashell,
Secretary.
[FR Doc. 97-33161 Filed 12-18-97; 8:45 am]
BILLING CODE 6717-01-M
Document Information
- Published:
- 12/19/1997
- Department:
- Federal Energy Regulatory Commission
- Entry Type:
- Notice
- Document Number:
- 97-33161
- Pages:
- 66620-66621 (2 pages)
- Docket Numbers:
- Docket No. CP98-126-000
- PDF File:
-
97-33161.pdf