01-30918. Norfolk Southern Railway Company-Abandonment Exemption-in Pike County, KY  

  • Start Preamble

    Norfolk Southern Railway Company (NSR) has filed a notice of exemption under 49 CFR 1152 Subpart F— Exempt Abandonments to abandon a 1.61-mile line of railroad between milepost LA-0.0 at Leckie Junction and milepost LA-1.61 at Aflex, in Pike County, KY. The line traverses United States Postal Service Zip Code 41501.

    NSR has certified that: (1) No local traffic has moved over the line for at least 2 years; (2) any overhead traffic, if there is any, can be rerouted over other lines; (3) no formal complaint filed by a user of rail service on the line (or by a state or local government entity acting on behalf of such user) regarding cessation of service over the line either is pending with the Surface Transportation Board (Board) or with any U.S. District Court or has been decided in favor of complainant within the 2-year period; and (4) the requirements at 49 CFR 1105.7 (environmental reports), 49 CFR 1105.8 (historic reports), 49 CFR 1105.11 (transmittal letter), 49 CFR 1105.12 (newspaper publication), and 49 CFR 1152.50(d)(1) (notice to governmental agencies) have been met.

    As a condition to this exemption, any employee adversely affected by the abandonment shall be protected under Oregon Short Line R. Co.—Abandonment—Goshen, 360 I.C.C. 91 (1979). To address whether this condition adequately protects affected employees, a petition for partial revocation under 49 U.S.C. 10502(d) must be filed. Provided no formal expression of intent to file an offer of financial assistance (OFA) has been received, this exemption will be effective on January 18, 2002, unless stayed pending reconsideration.[1] Petitions to stay that do not involve environmental issues,[2] formal Start Printed Page 65529expressions of intent to file an OFA under 49 CFR 1152.27(c)(2),[3] and trail use/rail banking requests under 49 CFR 1152.29 must be filed by December 31, 2001. Petitions to reopen or requests for public use conditions under 49 CFR 1152.28 must be filed by January 8, 2002, with: Surface Transportation Board, Office of the Secretary, Case Control Unit, 1925 K Street, NW., Washington, DC 20423.

    A copy of any petition filed with the Board should be sent to applicant's representative: James R. Paschall, General Attorney, Norfolk Southern Corporation, Three Commercial Place, Norfolk, VA 23510.

    If the verified notice contains false or misleading information, the exemption is void ab initio.

    NSR has filed an environmental report which addresses the abandonment's effects, if any, on the environment and historic resources. SEA will issue an environmental assessment (EA) by December 21, 2001. Interested persons may obtain a copy of the EA by writing to SEA (Room 500, Surface Transportation Board, Washington, DC 20423) or by calling SEA, at (202) 565-1552. Comments on environmental and historic preservation matters must be filed within 15 days after the EA becomes available to the public.

    Environmental, historic preservation, public use, or trail use/rail banking conditions will be imposed, where appropriate, in a subsequent decision.

    Pursuant to the provisions of 49 CFR 1152.29(e)(2), NSR shall file a notice of consummation with the Board to signify that it has exercised the authority granted and fully abandoned the line. If consummation has not been effected by NSR's filing of a notice of consummation by December 19, 2002, and there are no legal or regulatory barriers to consummation, the authority to abandon will automatically expire.

    Board decisions and notices are available on our Web site at www.stb.dot.gov.

    Start Signature

    Decided: December 10, 2001.

    By the Board, David M. Konschnik, Director, Office of Proceedings.

    Vernon A. Williams,

    Secretary.

    End Signature End Preamble

    Footnotes

    1.  While the applicant initially indicated a proposed consummation date of January 17, 2002, because the verified notice was filed on November 29, 2001, consummation may not take place prior to January 18, 2002. Applicant's representative has subsequently confirmed that the correct consummation date is on or after January 18, 2002.

    Back to Citation

    2.  The Board will grant a stay if an informed decision on environmental issues (whether raised by a party or by the Board's Section of Environmental Analysis (SEA) in its independent investigation) cannot be made before the exemption's effective date. See Exemption of Out-of-Service Rail Lines, 5 I.C.C.2d 377 (1989). Any request for a stay should be filed as soon as possible so that the Board may take appropriate action before the exemption's effective date.

    Back to Citation

    3.  Each offer of financial assistance must be accompanied by the filing fee, which currently is set at $1000. See 49 CFR 1002.2(f)(25).

    Back to Citation

    [FR Doc. 01-30918 Filed 12-18-01; 8:45 am]

    BILLING CODE 4915-00-P

Document Information

Published:
12/19/2001
Department:
Surface Transportation Board
Entry Type:
Notice
Document Number:
01-30918
Pages:
65528-65529 (2 pages)
Docket Numbers:
STB Docket No. AB-290 (Sub-No. 233X)
PDF File:
01-30918.pdf